Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Steel Construction》 2014-06
Add to Favorite Get Latest Update

ENHANCEMENT OF MANAGING LEVEL OF A STEEL MANUFACTURING PLANT BY BIM TECHNOLOGY

Li Jianhong;Li Dingshan;Zhang Ming;China Construction Steel Structure in Central China Region;  
There are two main problems in the fields of steel manufacture and construction,the first is information sharing,the second is collaborative operation.Information blocking and repetitive operation seriously influence the development of steel structure industry.BIM technology successfully solves the problem of information sharing.BIM management platform is an opportunity for business management and business process optimization,which can enhance intelligent management of steel structure engineering,and speed up the industrial upgrading.
【CateGory Index】: F426.31
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 ZHANG Jian-xin(School of Construction Management,Dongbei University of Finance & Economics,Dalian 116025,China);Study on Barriers of Implementing BIM in Engineering Design Industry in China[J];Journal of Engineering Management;2010-04
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 ;The Difficulty of BIM Application[J];Anhui Architecture;2012-06
2 Zhang Xiaofei(Shanghai Modern Architectural Design Group,Shanghai 200041,China);DISCUSSION ON OPTIMIZING THE DESIGN PROCESS BASED ON BIM[J];Industrial Construction;2013-07
3 XU Jun-qing,LU Hui-min(College of Civil Engineering,Southeast University,Nanjing 210096,China);Information Flow Model for Construction Supply Chain Based on BIM[J];Journal of Engineering Management;2011-02
4 PAN Jia-yi,ZHAO Yuan-yu(Department of Construction Management,Tsinghua University,Beijing 100084,China);Research on Barriers of BIM Application in China's Building Industry[J];Journal of Engineering Management;2012-01
5 HE Qing-hua,QIAN Li-li,DUAN Yun-feng,LI Yong-kui(Department of Construction Management and Real Eatate,Research Institute of Complex Engineering&Management, Tongji University,Shanghai 200092,China);Current Situation and Barriers of BIM Implementation[J];Journal of Engineering Management;2012-01
6 WANG Xueqing,ZHANG Kangzhao,XIE Yin;Establishment and Source Choice of Building Information Model[J];Construction Economy;2011-09
7 ZHANG Chunxia;Study on Application Situation and Development Barriers of BIM in China Construction Industry[J];Construction Economy;2011-09
8 SU Yong-yi(Engineering Management Dept.,Luoyang Institute of Science and Technology,Luoyang 471023,China);Study on Implementation of Building Information Modeling for the Whole Process Cost Control of Construction Project[J];Journal of Luoyang Institute of Science and Technology(Social Science Edition);2012-03
9 Qian Su;The Application of BIM Technology in Construction[J];Urbanism and Architecture;2013-08
10 Chen Qiang(BIM Center,Huazhong University of Science and Technology,Wuhan 430075,China;South China Architectural Design & Research Institute,Guangzhou 510640,China);BIM Adoption Risk Study in Building Design Project[J];Journal of Information Technology in Civil Engineering and Architecture;2012-01
China Proceedings of conference Full-text Database 2 Hits
1 Ma Minglei,Wang Guiling,Miao Dongmei,Li Tiansheng ( China Construction Eigth Engineering Bureau Co. ,Ltd. ,Shanghai 200120,China);Theoretical Application of Composite Rebar with Inner Reinforcement of Tunnel Shielding Construction[A];[C];2013
2 SUN Yijian;LI Xinglong;LI Zhi;CABRTECH Corporation Co. Ltd.;;BIM Consulting on Construction Enterprises[A];[C];2014
【Secondary Citations】
Chinese Journal Full-text Database 4 Hits
1 ZHANG Ming-yuan,YUAN Yong-bo ( School of Civil and Hydraulic Engineering, Dalian University of Technology, Dalian 116023, China );The discussion of the Union Use of Virtual Emulational Technology and Group Support System in Construction Management[J];Construction Management Modernization;2005-01
2 XIE Ying1,2,WANG Yao-wu1(1.School of Management,Harbin Institute of Technology,Harbin 150001,China;2.School of Civil Engineering,Northeast Forestry University,Harbin 150040,China);Overview of China’s Construction Industry Development and Suggestions since the Reform and Opening-up[J];Journal of Engineering Management;2010-02
3 Fu Xiao;Transformation of Design Thinking and Method Caused by Building Information Modeling[J];Architectural Journal;2009-01
4 WANG Guang-bin1,ZHANG Yang1,JIANG Zhen-jian2,et al.(1.School of Economics and Management,Tongji University,Shanghai 200092,China;2.School of Business,Shandong Jianzhu University,Jinan 250101,China);Benefits situation to stakeholders using BIM in preconstruction stage of projects[J];Journal of Shandong Jianzhu University;2009-05
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved