Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Steel Construction》 2019-07
Add to Favorite Get Latest Update

RESEARCH ON CALCULATION METHOD FOR ELASTIC STIFFNESS OF PANEL ZONE IN DIAPHRAGM-THROUGH JOINTS BETWEEN SQUARE STEEL TUBULAR COLUMN AND H-SHAPED STEEL BEAM

SUN Yiliang;ZHANG Wuchen;YANG Ziheng;FENG Changxi;RONG Bin;State Grid Hebei Economic Research Institute;School of Civil Engineering,Tianjin University;  
The elastic stiffness of the panel zone in diaphragm-through joints between square steel tubular column and H-shaped steel beam subjected to beam moments was studied. The panel zone deformation mechanism of diaphragm-through joints was analyzed. Based on reasonable assumptions,the elastic stiffness formula of the panel zone,which considered shear deformation of the panel zone,was theoretically derived. Based on the verified finite element model,parametric analysis of diaphragm-through joints was conducted. The proposed formula was proved through the comparisons of theoretical results and FEM results,which indicated the accuracy of the proposed formula.
【CateGory Index】: TU398.9
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 3 Hits
1 Rong Bin1,2,3 ,Chen Zhihua 1,2 ,Apostolos Fafitis 4 ,Miao Jikui5 (1.School of Civil Engineering,Tianjin University,Tianjin 300072,China; 2.Key Laboratory of Coast Civil Structure Safety (Tianjin University),Ministry of Education,Tianjin 300072,China; 3.School of Civil Engineering,Xinjiang University,Urumqi 830046,China; 4.Department of Civil and Environmental Engineering,Arizona State University,Tempe 85287,USA; 5.School of Architecture and Urban Planning,Shandong Jianzhu University,Jinan 250101,China);Seismic Behavior of Diaphragm-Through Connections of Concrete-Filled Square Steel Tubular Columns and H-Shaped Steel Beams[J];Transactions of Tianjin University;2013-03
2 Shao Yongsong Bao Wei(School of Civil Engineering,Harbin Institute of Technology,Harbin 150090,China);Calculating initial rotational stiffness of connection with cast steel connectors in steel frames[J];华中科技大学学报(自然科学版);2011-09
3 WANG Sufang1,2(1.School of Management & Humanity,Shanghai University of Electric Power,Shanghai 201300,China;2.College of Civil Engineering,Tongji University,Shanghai 200092,China);Calculation method of initial stiffness for reinforced panel zones in beam-to-column connections[J];四川建筑科学研究;2009-02
【Co-citations】
Chinese Journal Full-text Database 3 Hits
1 Miao Jikui;Bing Qingde;School of Architecture and Urban Planning,Shandong Jianzhu University;Key Laboratory of Renewable Energy Utilization Technologies in Building of Ministry of Education,Shandong Jianzhu University;Department of Assets,Shandong Jianzhu University;;Local tensile behavior of diaphragm-through joints of concrete-filled steel tubular column[J];山东建筑大学学报;2015-02
2 WANG Wei;WANG Ming-xing;State Key Laboratory for Disaster Reduction in Civil Engineering,Tongji University;Department of Building Engineering,Tongji University;;Concept design and aseismic performance evaluation for a novel cast steel modular joint appropriate for steel tubular column-H-beam frame connections[J];振动与冲击;2014-21
3 BAO Wei;SHAO Yongsong;College of Construction Engineering,Jilin University;School of Civil Engineering,Harbin Institute of Technology;;Mechanical behavior test and calculation method for bolts tension used in cast steel connectors[J];建筑结构学报;2014-04
【Secondary Citations】
Chinese Journal Full-text Database 7 Hits
1 Xu Guigen1 Nie Jianguo2(1.Jiangsu Huning Steel Mechanism Co.,Ltd.,Yixing 214231,China; 2.Tsinghua University,Beijing 100084,China);Experimental study of connections of concrete-filled square steel tubular columns with continuous diaphragms[J];土木工程学报;2011-08
2 SHAO Yongsong,BAO Wei,XU Shuquan(School of Civil Engineering,Harbin Institute of Technology,Harbin 150090,China);Development and research of beam-column connections with casting steel fasteners in steel frame[J];建筑结构学报;2010-S1
3 WANG Xian-tie 1,HAO Ji-ping 1,SUN Tong 2PAN Yang 1,REN Qing-qing 1,MA Shan-ji 1,LI Na 1(1.School of Civil Eng.,Xi'an University of Architecture & Technology,Xi'an 710055,China;2.Shandong Laigang Construction Co.Ltd.,Qingdao 266071,China);Experimental Study on Seismic Behavior of Penetrated Interior Diaphragm on One Side Beam-to-Column Connection for Concrete-Filled Square Steel Tube[J];重庆建筑大学学报;2007-02
4 Li Liming,Chen Zhihua,Li Ning(School of Civil Engineering,Tianjin University,Tianjin 300072,China);Experimental study on seismic capability of diaphragm-through style beam-column joint[J];地震工程与工程振动;2007-01
5 LIU Hong-bo~(1,2) XIE Li-li~1 SHAO Yong-song~1(1.Department of Civil Engineering,Harbin Institute of Technology,Harbin 150001,China;2.Institute of Architecture and Civil Engineering,Heilongjiang University,Harbin 150086,China);The earthquake damage of steel frame buildings and the causes of brittle facture[J];世界地震工程;2006-04
6 Lin Yan(Shandong College of Architecture and Engineering Jinan 250014)Liu Xiliang(College of Architecture and Engineering,Tianjin University Tianjin 300072);DESIGN OF CAST STEEL JOINT AND ITS PROJECT USE[J];工业建筑;2005-11
7 ZHOU Tianhua1,2, HE Baokang2, CHEN Guojin3, WEI Chaowen3, SHAN Yinmu3 (1. Chang’an University, Xi’an 710061, China; 2. Xi’an University of Architecture and Technology, Xi’an 710055, China; 3. Hangxiao Steel Structure Co. Ltd., Hangzhou 310003, China);Experimental studies on seismic behavior of concrete-filled steel square tubular column and steel beam joints under cyclic loading[J];建筑结构学报;2004-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved