Lump Sum Contract Price Control in Agent Construction Public Project Based on Risk Allocation

YAN Ling1,ZHAO Hua2,MENG Fan-li1(1.School of Management,Tianjin University of Technology,Tianjin 300384,China; 2.School of Management,Tianjin University,Tianjin 300072,China)  
The Agent Construction System is a system innovation for the management model of government investment project,its responsibility of investment control is transferred to the agent by contract mechanism and the agent has to realize the hard constraint of project investment control.It is a crucial issue to affect the effect of project investment control that the principal and agent confirmed the total investment lump sum and its adjustment means reasonably.In view of the deficiency of confirmation basis for total investment lump sum according to the design estimate and the trouble of project investment exceeding the budget result from mentioned above,the paper points out government principal and agent should be taken the risks of investment changing and the responsibilities of investment control respectively based on the reasonable risk allocation principles.And then,the paper puts forward to the confirmation of project total investment lump sum should comprise all risk factors to influence investment changes and the responsibilities of project investment control taken by agent,and the total investment lump sum can not be adjusted until the risks taken by principal happened.At last,the contract terms design of risk allocation under the condition of lump sum contract and adjustment methods of the contract price due to some risks taken by principal happened are involved in this paper.
【Fund】: 国家自然科学基金(70872084);; 天津市教委高等学校人文社科研究项目(2006BA06)
【CateGory Index】: F283
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 2 Hits
1 YAN Ling,LIU Yuan-yuan(School of Management,Tianjin University of Technology,Tianjin 300387,China);Research on Accountability Basis Determination of Agent in Government Investment Project A Perspective of Contract Risk Responsibility Allocation[J];Journal of Chongqing Jiaotong University(Social Sciences Edition);2011-06
2 WU Yun-na,NA Ren-mandula,LI Ze-zhong,HU Xin-liang,SHEN Yue(School of Economics and Management,North China Electric Power University,Beijing 102206,China);Study on Cost Supervision Evaluation of Government Investment Agent Projects[J];Technoeconomics & Management Research;2013-07
【Citations】
Chinese Journal Full-text Database 10 Hits
1 YAN Ling1,ZHOU Guo-dong2(1.Management School of Tianjin University of Technology,Tianjin 300384;2.Office of Key Project Inspectors,National Development and Reform Commission,Beijing 10082);The State and Problems of Agent Construction System of the Government Investment Projects in China[J];Journal of Beijing Institute of Technology(Social Sciences Edition);2009-05
2 Wen Bin;Thoughts on Whole Process Investment Control of Urban Rail Transit Construction Project[J];Underground Engineering and Tunnels;2009-04
3 HE Bo sen,WAN Cai yun (School of Management,Tianjin University,Tianjin 300072,China);Risk Allocation and Contract Management of BOT Projects[J];China Harbour Engineering;2001-05
4 LIU Xin-ping WANG Shou-qing;Risk Allocation Principles and a Framework for Risk Allocation of PPP[J];Construction Economy;2006-02
5 ZHANG Wen-juan, WANG Guang-bin;The Definition of the Cost of Rail Traffic Projects by the Method of GMP[J];Construction Economy;2006-10
6 ZHENG Shengqin;Discussion on the Effectiveness of the Incentive Mechanism in Agent-construction Units[J];Construction Economy;2007-09
7 YUAN Junli, SUN Gangzhu;Study on the Application of CM Contract in China[J];Construction Economy;2009-10
8 Zheng Bianjiang(Investment and Engineering Management Institute, Dongbei University of Finance & Ecomics, Dalian 116025,China);Research on Cost Compensation Mechanism of Public Project[J];Science & Technology Progress and Policy;2009-21
9 LI Zhi-ping(Beijing Xiaguang Economical Technology Consulting Co., Ltd., Beijing 100011);On the reform of investment management for the hydro-engineering capital construction projects[J];Water Power;2003-07
10 He Weiyi,Yin Yilin,Ke Hong,Geng Ying jie;Study of investment control system in construction of urban rail transit projects[J];Railway Engineering Cost Management;2005-05
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 WANG Yuan-hao(Anhui Institute of Architecture & Industry,Hefei 230601,China);The practice of and thought on the investment control of the construction unit's engineering project[J];Sichuan Building Science;2006-02
2 Du Yana1, Cui Zhikun2, Li Yuehai2 (1.Heze Highway Administration, Heze 274000, China; 2.Heze Construction Bureau, Heze 274000, China);Experience and Suggestion of Pricing in Bill of Quantities[J];Anhui Architecture;2007-06
3 Wu Zhengwen(Anhui Institute of Architecture & Industry,Hefei 230022,China);Approach to Information Communication Technology under Multi-item Operation[J];Anhui Architecture;2008-03
4 Wang Dafan (Wuhu Daxin Industrial Group Co. Ltd, Wuhu 241000, China);On Cost Management of Real Estate Development Project[J];Anhui Architecture;2008-04
5 Chen Lin (Wuhan Wujian Mechanized Construction Co.,Ltd,Wuhan 430000,China);Site Attestation Signing during Building Construction[J];Anhui Architecture;2009-05
6 JI Liang-zhong(Department of Infrastructure,AHUT,Ma'anshan 243002,Anhui,China);On the Prevention of Proprietors' Claim and the Strategies of Counter Claims[J];Journal of Anhui University of Technology(Sociel Sciences);2005-05
7 CAO Ping1,2,DING Shi-zhao1(1.School of Economics & Management,Tongji University,Shanghai 200092 P.R.China;2.School of Architecture & Civil Engineering,Xi'an Science & Technology University,Xi'an 710054 P.R.China);Implementation Planning of Subway Construction Project[J];Chinese Journal of Underground Space and Engineering;2008-01
8 Yang Jing 1 (1.Dept. of Civil Engineering, Beijing 100044) Wang Xiaowu 2 (2.The First Brigade of Construction and Installation of the Chinese Air Force, Beijing 100089);The Management of Project Cost after Entering into WTO[J];Journal of Beijing Institute of Civil Engineering and Architecture;2003-02
9 DU Ya-ling1,YIN Yi-lin1,2(1.School of Management,Tianjin University,Tianjin 300072 2.School of Management,Tianjin University of Technology,Tianjin 300384);On the Risk Allocation Model for Public Projects Based on Fuzzy Logic[J];Journal of Beijing Institute of Technology(Social Sciences Edition);2008-03
10 BAI Jun-feng1,2,YIN Yi-lin1,3(1.School of Management,Tianjin University,Tianjin 300072;2.Changchun University of Technology,Changchun 130012;3.School of Management,Tianjin University of Technology,Tianjin 300191);Study on Agent Fee Model of Agent Construction Project[J];Journal of Beijing Institute of Technology(Social Sciences Edition);2009-03
China Proceedings of conference Full-text Database 2 Hits
1 LIN Ze-fu,GUO Jian(School of Management Science and Engineering,Central University of Finance and Economics,Beijing 100081,China);The Optimization Model in the Infrastructure Project Financing[A];[C];2011
2 KOU Guoxiang ZHU Zhongrong (College of Civil and Hydraulic Power,Three-Gorge University,Yichang,Hubei 443002);QUALITY MONITORING IN CONSTRUCTION OF ANTI-SLIDE PILES[A];[C];2005
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 YAN Ling1,XING Ran1,ZHOU Guo-dong2(1.Management School,Tianjin University of Technology,Tianjin 300384;2.Office of Key Project Inspectors,National Development and Reform Commission,Beijing 100824);On the Selection Method of Construction Agent Organization on the Basis of Project Governance Theory[J];Journal of Beijing Institute of Technology(Social Sciences Edition);2009-06
2 DU Ya-ling,YIN Yi-lin(School of Management,Tianjin University of Technology,Tianjin 300384);Research on the Improvement of Agent Construction Project Management Performance Based on Project Governance[J];Journal of Beijing Institute of Technology(Social Sciences Edition);2010-06
3 DU Ya-ling,YIN Yi-lin (School of Management,Tianjin University of Technology,Tianjin 300384,P.R.China);Research on the Risk Allocation Framework in Construction Project from the Perspective of Incomplete Contract[J];Journal of Chongqing University(Social Science Edition);2012-01
4 YAN Min1,YIN Yi-lin1,2(1.School of Management,Tianjin University,Tianjin 300072,China;2.Management School,Tianjin University of Technology,Tianjin 300384,China);Research on Agent Construction Service Pricing Mechanism of Government Investment Projects:A Perspective of Risk Allocation[J];Research on Financial and Economic Issues;2010-03
5 ;Research on Project Risk Sharing and Contract Change[J];Chongqing Architecture;2007-07
6 WENG Sun-zhe(East China University of Politics and Law,Shanghai 210042,China);On execution mechanism of incomplete contracts——Viewpoint on limited reason and information asymmetry[J];Journal of Chongqing Technology and Business University(Social Science Edition);2006-03
7 FENG Li-xia, CHEN Yi(School of Management, Changsha University of Science and Technology, Changsha, Hunan 410077, China);On the Perfection of the Index System for the Performance Evaluation of the Construction Project of Enterprises[J];Journal of Changsha University of Electric Power;2005-01
8 YANG Wei-hua, DAI Da-shuang, HAN Ming-jie (School of Management,Dalian University of Technology,Dalian 116024,China);Empirical study of critical risk factors influencing concession pricing of wastewater treatment BOT projects[J];Journal of Dalian University of Technology(Social Sciences);2006-02
9 ZHANG Shu-min,WANG Xun(Department of Economics,Dongbei University of Finance and Economics,Dalian 116025,China);Artificially-designed incentive contracts' incompletion and executing difficulty in organization[J];Journal of Dalian University of Technology(Social Sciences);2006-03
10 Mohamed Chohra Mu Shiyu Cheng Hu(School of Civil Engineering,Southeast University,Nanjing 210096,China);Risks and new transformations of PPP contracts[J];东南大学学报(英文版);2011-04
【Secondary References】
Chinese Journal Full-text Database 3 Hits
1 ZHAO Yi-nan 1,CHEN Yi-ming 2(1.College of Mechanical Engineering,Yanshan University,Qinhuangdao,Hebei 066004,China;2.College of Sciences,Yanshan University,Qinhuangdao,Hebei 066004,China);Categoricalness mathematic distribution model of rights and liabilities of multi-subject with uncertain marginals[J];Journal of Yanshan University;2012-04
2 GAO Yun-li,JIANG Lei(College of Architecture and Civil Engineering,Dalian Nationalities University, Dalian Liaoning 116605,China);Research of Allocation Method of Multi-factors Risk of Construction Project[J];Journal of Dalian Nationalities University;2012-05
3 (①Lanzhou Jiaotong University Design Institute Co.,Ltd.,Lanzhou 730070,China;②Lanzhou Jiaotong University College of Architecture and Urban Planning,Lanzhou 730070,China)① ZHANG Rui;② MA Lei;Consideration in Preparation of Budgetary Estimates before and after the Preliminary Design Review[J];Value Engineering;2013-16
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 LIN Jian,LI Huan-rong(Systems science and technology institute of Wuyi University,Jiangmen,Guangdong 529020,China);Study on the Risks of Mutual Trust Within Strategic Network and its Trust Mechanism[J];Commercial Research;2006-06
2 YAN Ling~(1,2),ZHAO Li-ming ~2(1.Economic and management school,Tianjin University of Technology,Tianjin 300191,China;2.School of Management Tianjin University,Tianjin 300072,China);The Research on the Principal Agent Relationship of Government Investment Project in China[J];Research On Financial and Economic Issues;2005-12
3 TANG Wei-gang~1,YAN Ling ~2,YIN Yi-lin~2(1.Management School,Tianjin University,Tianjin 300072,China;2.Economics and Management School,Tianjin University of Technology,Tianjin 300191,China);The research on the transaction governance mode of public project[J];Research on Financial and Economic Issues;2006-07
4 DENG Zhong-mei Faculty of Construction Management and Real Estate,Chongqing University,Chongqing 400045,China;Construction-agent system project management pattern study based on principle-agent theory[J];Journal of Chongqing Jiaotong University;2006-02
5 LUO Jian-hua, GAO Feng (Department of Industry and Commerce, Changsha University of Technology, C hangsha, Hunan 410077, China);An Analysis of the Trust and Agency in the Construction Project s Invested by the Government[J];Journal of Changsha University of Electric Power;2003-02
6 LI Jicai~1,DENG Jiaojiao~2(1.Port of Authorities of Rizhao,Rizhao 276826;2.Economic & Management School,Tianjin University of Technology,Tianjin 300384,China);Preliminary Research on the Agent Incentive Based on the Status Quo of Agential Cost[J];Port Engineering Technology;2006-04
7 HE Bo sen,WAN Cai yun (School of Management,Tianjin University,Tianjin 300072,China);Risk Allocation and Contract Management of BOT Projects[J];China Harbour Engineering;2001-05
8 XU Zhifen1 QI Anbang1 WANG Jintong2(1.Nankai University Business School,Tianjin 300071,China;2.Financial Investment Assessment and Evaluation Center of Hebei Province,Shijiazhuang 050000,China);Research about the Management Mode Reformation of Public Project[J];Journal of Industrial Engineering and Engineering Management;2005-S1
9 LUO Jian-hua, DU Jun,XIAO Guang-hua (Management School, Changsha University of Science and Technology, Changsha 410076,China);The Analysis of Market Game on Owner's Agent Mode of National Construction Investment Project[J];Journal of Hunan University(Social Science);2004-04
10 LI Biao~1,CHAI Hong-feng~2(1.Business School,Hohai University,Nanjing 210098,China;2.Department of Water Resources of Zhejiang Province,Hangzhou 310009,China);Selection method for EPAM enterprises based on improved fuzzy optimum model[J];Journal of Hohai University(Natural Sciences);2006-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved