Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《JOURNAL OF INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT》 1999-01
Add to Favorite Get Latest Update

Quantiative Risk Assessment(56)

By Luo Huabin, Zhang Shiying (School of Management, Tianjin University, Tianjin 300072)  
QRA(Quantitative Risk Assessment) is a technology of quantitative risk assessment, which can be applied to reduce the risk level as low as reasonably practicable.Based on the practice of Offshore Oil Industry of China, this paper systematically discusses the main concepts and methodologies of QRA.
【CateGory Index】: P715.41
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 10 Hits
1 Tang Xiaoling;Zhang Yifei;Zhang Kai;Management School,Xi'an University of Architecture and Technology;CCCC Second Highway Engineering Co. ,Ltd.;;Empirical Research on International Project Risk Management Based on Extension Theory[J];施工技术;2015-06
2 Tao Ranran,Yan Xiangzhen,Yang Xiujuan,Liu Jinkun.School of Electromechanical Engineering,China University of Petroleum(East China),P.C. 257061;BRIEF DISCUSSION ON THE APPLICATION OF SAFETY ASSESSSMENT TO THE OFFSHORE PLATFORM[J];石油化工安全环保技术;2011-01
3 Huang Haibin,Li Weitao,He Shefeng;The Application of HSE to Marine Petroleum Engineering[J];石油工业技术监督;2008-06
4 SUN Yanjie,LI Liangbi,YIN Qun(Jiangsu University of Science and Technology,Zhenjiang 212003,China);PRELIMINARY STUDY ON RISKING ASSESSMENT OF OFFSHORE PLATFORM UNDER COLLISION AND GAS EXPLOSION HAZARDS[J];中国海洋平台;2007-05
5 LV Dong~1,LIANG Cheng-hao~(1,2)(1.School of Chemical Engineering,Dalian University of Technology,Dalian 116012,China;2.Electromechanics & Materials Engineering College,Dalian Maritime University, Dalian 116026,China);An Overview of the Risk Assessment for Offshore Oil and Gas Platform[J];当代化工;2006-05
6 QI Heping(Shengli Oilfield Administration Bureau,Dongying,257000);DISASTER ASSESSMENT FOR JACKET PLATFORM SCOURED IN SHALLOW WATER[J];中国海洋平台;2006-03
7 ZHANG Da-yong, LI Gang, YUE Qian-jin(Department of Engineering Mechanics, State Key Laboratory of Structural Analysis of Industrial Equipment, Dalian University of Technology, Dalian 116023, China);State of the art of structural optimization for offshore platforms[J];海洋工程;2005-01
8 HUO Chunyong, DONG Yuhua et al;The Application of Delphi Method In the Basic Event Analysis of Pipeline Fault Tree[J];油气储运;2005-01
9 LI Wen-long, TAN Jia-hua(School of Naval Architecture, Ocean and Civil Engineering, Shanghai Jiaotong University, Shanghai 200030, China);Risk assessment of very large floating oil storage systems[J];海洋工程;2004-03
10 LI Yugang,LIN Yan,JI Zhuoshang(Dalain University of Technology,DaLain 116024 China);The Developing History and Present Status of Safety Assessment in Offshore Platform[J];中国海洋平台;2003-01
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 HOU Jing,LIU Yisheng,ZHU Hailong;Study on Risk Identification in International Project Contracting[J];建筑经济;2013-07
2 Wang Xueqing,He Zhen(School of Management,Tianjin University,Tianjin 300072,China);Research on risk evaluation index system and model construction of international engineering project[J];山东建筑大学学报;2013-02
3 LV Dong~1,LIANG Cheng-hao~(1,2)(1.School of Chemical Engineering,Dalian University of Technology,Dalian 116012,China;2.Electromechanics & Materials Engineering College,Dalian Maritime University, Dalian 116026,China);An Overview of the Risk Assessment for Offshore Oil and Gas Platform[J];当代化工;2006-05
4 XIAO Li-minSchool of Economic and Management,Tongji University,Shanghai 200092,China;Empirical Research on Early Warning System of International Engineering Contract[J];管理科学;2006-05
5 YANG Lin-juan,SHEN Shi-ming(College of Mechanical and Power Engineering,Nanjing University of Technology,Nanjing 210009,China);Review to Risk Analysis and Assessment Method(1)[J];压力容器;2005-07
6 Ding Houcheng Wan Chenglue (Wuhan Safety & Environmental Protection Research Institute,China Iron & Steel Industry Trade Group Co. Wuhan 430081);Preliminary Analysis on Value of Risk Assessment Criteria[J];工业安全与环保;2004-10
7 LI Wen-long, TAN Jia-hua(School of Naval Architecture, Ocean and Civil Engineering, Shanghai Jiaotong University, Shanghai 200030, China);Risk assessment of very large floating oil storage systems[J];海洋工程;2004-03
8 Meng Bo Yu Jianxing Liu Liming (Civil Engineering College,Tianjin University,Tianjin,300072);A study on risk assessment method in the process of hoisting offshore platform modular aboard[J];中国海上油气;2004-01
9 ZHONG De ling, LIU Jian li (First Institute of Oceanography, SOA, Qingdao 266061, China );Scouring Study of Offshore Oil Platform Foundation in the Chengdao Oil Field[J];海岸工程;2003-02
10 WANG Xingguo1,2, JIA Moyi2, ZHOU Jing1(1. Dalian University of Technology, Dalian 116024, China; 2. Hebei Institute of Technology, Tangshan 063009, China);Dynamic optimization design for jacket platforms under earthquakes[J];海洋工程;2003-02
【Secondary References】
Chinese Journal Full-text Database 8 Hits
1 XUE Kaichun;;Research on Electrical Fault Diagnosis of Hoisting Mechanism of Portal Crane Based on Fuzzy Bayesian Network[J];科技创新与应用;2018-02
2 SHAN Yu;WANG Cong;ZHANG Jinliang;Ningbo University of Technology;;Analysis of ESP Explosion Accident in Painting Shop Based on FUZZY-FTA-BN[J];宁波工程学院学报;2017-04
3 XUE Tao;GAO Shang;The Fifth Engineering Co.Ltd.of CCCC Tunnel Engineering Co.Ltd.;;Yield Rate Analysis of Risk Management of International Engineering in the View of EPC[J];工程建设与设计;2017-22
4 LAN Li;ZHANG You-peng;School of Electronic and Information Engineering,Lanzhou Jiaotong University;School of Automation and Electrical Engineering,Lanzhou Jiaotong University;;Reliability Analysis of Time Synchronization System of Railway Ground Signal Equipment[J];兰州交通大学学报;2017-04
5 WANG Lin;ZUO Hua-nan;LIU Ping;SHEN Wei-wei;Jiangsu University of Science and Technology,Ship and Architectural Engineering School;Jiangsu University of Science and Technology,Naval Architecture and Ocean Engineering School;Jiangsu University of Science and Technology,Civil and Architecture School;;Simulation analysis of the frontal collision between semi-submersible platform and stern of the supply ship[J];舰船科学技术;2017-07
6 LIU Bao-zhan;WEI Wen-pu;DUAN Meng-lan;AN Wei;JIN Wei-wei;China Offshore Environmental Services Co.Ltd.;China University of Petroleum;China National Offshore Oil Corporation;;Oil spill risk assessment of offshore platform in Bohai Sea[J];海洋环境科学;2017-01
7 Jiang Feng;Cao Kang;Yang Xubing;College of Petrochemical Engineering,Lanzhou University of Technology;;Risk Evaluation Method of Ocean Platform Based on Triangular Fuzzy Number and AHP[J];甘肃科学学报;2016-03
8 YU Shu-rong;NIU Shuai;College of Petrochemical Technology,Lanzhou Univ.of Tech.;;Fault-tree analysis of failure mode of pressure vessels marine oil and gas gathering and transportation[J];兰州理工大学学报;2016-03
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved