Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Highway and Transportation Research and Development》 2005-S2
Add to Favorite Get Latest Update

Deformation Monitoring and Construction of Anchor Ropes in reinforcing a Unstable High Cutting-Slope

ZHOU Shi-meng(Guangdong Provincial Freeway Company,Guangdong Shaoguan 512700,China)  
Some freeway high cutting-slopes will lose their stability in late phase of the construction process.Owing to limitation of construction time and geological exploration,it is impossible to accord with factual condition for a primary plan to be designed about reinforcing these slopes,based on experience and engineering analogy.This paper introduces an example about the construction of pre-stress anchor ropes to reinforce a high unstable slope of a freeway effectively and duly in a karst area,according to information from deformation monitoring and anchor rope drilling.
【CateGory Index】: U416.14
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved