Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Technocogy of Highway and Transport》 2004-03
Add to Favorite Get Latest Update

Discussion on Construction Procedures for Sections Enclosed in Concrete of Steel Pipe Concrete Arch Bridges

ZHONG Jian-guo 1,TANG Cheng 2  
【CateGory Index】: U448.22
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 ZHOU Jian-ting,DENG Zhi,YUAN Rui,LAN Yong,CHEN Qi (Chongqing Jiaotong University,Chongqing 400074,China);Adjusting Load Process of Spandrel Construction for Large-Span Stone Arch Bridge with Deteriorated Arch Axis[J];Journal of Chongqing Jiaotong University(Natural Science);2010-01
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Yang Bingcheng\ Sun Ming[Department of Highway, Xi'an Highway University, 710064];Cable Tensions for Cable Stayed Bridges and Optimized Nonlinear Back Running Analysis[J];CHINA JOURNAL OF HIGHWAY AND TRANSPORT;1998-03
【Co-citations】
Chinese Journal Full-text Database 6 Hits
1 XIN Ke-gui , FENG Zhong (Civil Engineering Department, Tsinghua University, Beijing 100084, China);NONLINEAR STATIC REVERSE ANALYSIS OF LONG-SPAN CABLE-STAYED BRIDGES DURING CONSTRUCTION[J];Engineering Mechanics;2004-05
2 ZHAO Wen-wu,XIN Ke-gui(Department of Civil Engineering,Tsinghua University,Key Laboratory of Structural Engineering and Vibration of Education Ministy,Beijing 100084,China);SELF-ADAPTIVE CONSTRUCTION CONTROL ANALYSIS OF PRE-STRESSED CONCRETE CABLE-STAYED BRIDGES[J];Engineering Mechanics;2006-02
3 ZHOU Zhengmao1,2,GONG Zhenqiu2,WANG Sujuan2(1.School of Civil Engineering,Tongji University,Shanghai 200092,China;2.Shanghai Tonghao Civil Engineering Consulting Co.,Ltd.,Shanghai 200092,China);Tension Control for Strands in Cables Based on Reverse Analysis[J];Journal of Highway and Transportation Research and Development;2009-04
4 JIANG Hua1 YANG Bingcheng2 WANG Junjie1(1.Department of Bridge Engineering,Tongji University,Shanghai 200092,China;2.Department of Bridge Engineering,Chang' an University,Xi' an 710064,China);Analysis of Finished Dead State of Cable Arch Bridges[J];Structural Engineers;2008-05
5 JIANG Weiping1, LI Yadong2 XU Jun3(1.China Zhongtie Major Bridge Consultation & Supervision Co.,Wuhan 430050,China;2.School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China;3.Department of Bridge Engineering,Tongji University,Shanghai 200092,China);Research on Cable Replacement Design for Cable-Stayed Bridges[J];Structural Engineers;2010-02
6 WANG Yan,ZHAO Xiong-hui,SHAO Wei(Xi′an Precision Machinery Research Institute,Xi′an 710075,China);Virtual Reality of Shipborne Dispenser′s Metal Hose Releasing for Wire-Guided Torpedo[J];Torpedo Technology;2010-05
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 WANG Peng,ZHOU Jian-ting(Chongqing Jiaotong University,Chongqing 400074,China);Research on strengthening technology of stone arch bridge based on dead load adjusting of spandrel structure[J];Journal of Chongqing Jiaotong University;2006-S1
2 QIU Lin,SUN Ji-biao(School of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,China);Analysis on Stability of Concrete Filled Steel Tube Arch Bridge in Construction[J];Journal of Chongqing Jiaotong University(Natural Science);2008-03
3 Liu Zhong; Gu Anbang; Zhou Shuixing(Department of Bridge and Structure Engineering);Nonlinear Analysis of Wanxian Yangtze River Bridge[J];JOURNAL OF CHONGQING JIAOTONG INSTITUTE;1996-S1
4 YAN Dong-huang, LAI Min-zhi, ZHANG Ke-bo, LI Xue-wen (Bridge and Structure Engineering Department, Changsha Comm. Univ., Changsha 410076, China);Space Calculation Model of Maocaojie Bridge Based on the ANSYS[J];Journal of Changsha Communications University;2003-02
5 Liu Jingfu (Fuzhou Planning Design Resarch Institute);SECTION DESIGN OF RIB ARCH OF DUMBBELL-SHAPED ARCH BRIDGE OF CONCRETE FILLED STEEL TUBE[J];Fujian Architecture & Construction;1996-03
6 SUN Chao, CHEN Bao-chun (College of Civil and Architectural Engineering,Fuzhou University,Fujian Fuzhou 350002,China);Static Analysis of Shenzhen Beizhan Bridge[J];JOURNAL OF FUZHOU UNIVERSITY(NATURAL SCIENCES EDTION);1999-03
7 Xie Xiaoli,Qin Rong,Peng Wenli,Deng Zhiheng (Guangxi University, Nanning 530004,China);Theoretical Analysis of Creep and Shrinkage Effects in SRC Arch Bridge[J];Engineering Science;2001-03
8 ZHANG Zhi-cheng (Department of Civil Engineering, Zhejiang University, Hangzhou, Zhejiang 310027, China);SIMULATION ANALYSIS FOR MECHANIC BEHAVIOR OF CONCRETE-FILLED STEEL TUBULAR ARCH BRIDGE DURING THE COURSE OF CORE CONCRETE PUMPING[J];Engineering Mechanics;2007-02
9 YAN Quan-sheng 1, LUO Ning an 2, HAN Da jian 2, WANG Wei feng 1 (1.College of Traffic and Communications, South China Univ. of Tech., Guangzhou 510640, China; 2.College of Architecture and Civil Engineering, South China Univ. of Tech.);Nonlinearity and Stability Analysis for A Long-Span Arch Bridge[J];JOURNAL OF SOUTH CHINA UNIVERSITY OF TECHNOLOGY(NATURAL SCIENCE);2000-06
10 LI Liang YE Mei-xin;Analysis of stability during construction of the steel-tube concrete stiff skeleton of the arch[J];Shanxi Architecture;2007-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved