Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《APPLIED MATHEMATICS A JOURNAL OF CHINESE UNIVERSITIES》 1995-01
Add to Favorite Get Latest Update

THE RELIABILITY ANALYSIS OF A TWO-UNIT COLD STANDBY REPAIRABLE SYSTEM AND ITS OPTIMAL REPLACEMENT POLICY

Zhang Yuanlin (Dept.of Math.& Mech.,Southeast University,Nanjing, 210018)  
This paper considers a cold standby repairable system consisting of two dissimilar units and a single repairman.In the system,the life distributions and the repair distributions of these two units are assumed to be the exponential distributions, and it is not "as good as new" after the failed units repair. Under this assumption, by using the geometric process and the method of supplementary variable, we derive some reliability indices. We take the failure number and the long-run expected benefit per unit time as the replacement policy and the objective function respectively. Our problem is to determine the optimal replacement policy such that the objective function is maximized. Therefore,the system availability is assured.
【CateGory Index】: O213.2
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 4 Hits
1 Tang Yinghui,Liu Yan (School of Applied Mathematics, UEST of China Chengdu 610054);Reliability Analysis of a Two Different Units Cold Standby Repairable System with Delay Repair[J];Journal of University of Electronic Science and Technology of China;2004-03
2 Yan Zhikai Mao Huiliang Zhang Yuanlin (Department of Mathematics and Mechanics, Southeast University, Nanjing 210018);Geometric Process Model for the Repairable Queueing System M/M(M/M)/1[J];Journal of Southeast University;1997-01
3 Jia Jishen (Henan Mechanic and Electric Engineering College, Xinxiang) Zhang Yuanlin (Dept. of Applied Math., Southeast University, Nanjing 210018);A FAILING REPAIR MODEL TAKING ACCOUNT OF THE PREVENTIVE REPAIR TIME[J];APPLIED MATHEMATICS A JOURNAL OF CHINESE UNIVERSITIES;1997-04
4 Lü Xiao-yan,WU Qing-tai(College of Science,Nanjing Agricultural University,Jiangsu Nanjing 210095 PRC);Geometric Process Model for A Cold Standby Repairable System of Two Components with Priority and Multi-state[J];Jiangxi Science;2006-06
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Zhang Yuanlin (Department of Mathematics and Mechanics);Excess Life of the Geometric Process and Its Distribution[J];Journal of Southeast University;1991-06
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Tang Yanyu; Wang Shiming;PORBABILITY DIFFERENTIAL METHOD─A PROGRAMMED METHOD ROF CALCULATING DENSITY OF PROBABILITY DISTRIBUTION OF CONTINUOUS TYPE[J];JOURNAL OF ANHUI INSTITUTE OF ARCHITECTURE;1995-02
2 SUN Jun?suo 1,CHENG Kan 2 (1.Dept. of Mathematics and Physics,,Anshan Institute of I.& S.Technology,Anshan 114002,China;2.Institute of Applied Mathematics,Academia Sinica,Bijing 100080,China);Application of the Discrete Total Time on Test Transform[J];JOURNAL OF ANSHAN INSTITUTE OF IRON AND STEEL TECHNOLOGY;2000-04
3 BAI Hong-xin1,2,ZHAO Guo-hui1 (1. College of Science, Yanshan University,Qinhuangdao 066004,China; 2. Department of Mathematics and Computer, Baoding University,Baoding 071000,China);Reliability Analysis of Three Components Warm Standby Repairable System with Safety and Reliable Switch[J];Journal of Baoding University;2008-02
4 Wu Wei;Zheng Mu-qiao;Dong Xiu-yuan(Beijing Institute of Technology,Beijing 100081);The Reliability of Markovian Series Repairable Mechanical System for Dependent Components[J];;1996-01
5 TAN Shu-ping~(1,2),YUAN Hong-tao~3,HAN Lu-liang~3(1.Beijing Institute of Control Engineering,Beijing 100080,China;2.Academy of Mathematics and System Science,Chinese Academy of Science,Beijing 100080,China;3.Beijing Special Vehicle Research Institute,Beijing 100072,China);Analysis of Fault Stochastic Process for Armored Vehicles[J];Acta Armamentarii;2006-06
6 Cheng Weihu(Department of Applied Mathematics, Beijing Polytechnic University, Beijing, 100022 );The Confidence interval of Variation Coefficient and Reliability for Extreme Value Distribution[J];JOURNAL OF BEIJING POLYTECHNIC UNIVERSITY;1999-02
7 SUN Jin kang LI Zheng neng (Beijing University of Aeronautics and Astronautics, Dept. of Flight Vehicle Design and Applied Mechanics);Failure-Rate Analysis of Repairable Systems[J];Journal of Beijing University of Aeronautics and Astronautics;2001-05
8 KONG De liang WANG Shao ping (Beijing University of Aeronautics and Astronautics, School of Automation Science and Electrical Engineering);Study on Availability Analysis for Repairable System[J];Journal of Beijing University of Aeronautics and Astronautics;2002-02
9 Wang Shaoping Tao Jianfeng Cui Mingshan Jiao Zongxia (School of Automation Science and Electrical Engineering, Beijing University of Aeronautics and Astronautics, Beijing 100083, China);Study on iterative availability algorithm of Markov renewal equation[J];Journal of Beijing University of Aeronautics and Astronautics;2004-12
10 Lu Xiaohui (Department of Industrial Management);The Prior Distribution in Bayesian Method for the Exponential Case[J];Journal of Beijing Institute of Technology;1990-01
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 WANG Jin ting (College of Sciences, Northern Jiaotong University, Beijing 100044,China);Reliability Analysis of A Discrete-Time Serial System[J];Journal of Northern Jiaotong University;2001-06
2 Wu Wei;Zheng Mu-qiao;Dong Xiu-yuan(Beijing Institute of Technology,Beijing 100081);The Reliability of Markovian Series Repairable Mechanical System for Dependent Components[J];;1996-01
3 KONG De liang WANG Shao ping (Beijing University of Aeronautics and Astronautics, School of Automation Science and Electrical Engineering);Study on Availability Analysis for Repairable System[J];Journal of Beijing University of Aeronautics and Astronautics;2002-02
4 XU Yong, HOU Chao zhen, LUO Li (Department of Automatic Control, Beijing Institute of Technology, Beijing100081);Reliability Analysis of Repairable Vote Systems Based on Fuzzy-State[J];Journal of Beijing Institute of Technology;2000-06
5 ZHAO Xian, CUI Li-rong(School of Management and Economics,Beijing Institute of Technology,Beijing 100081,China);Application of Finite Markov Chain Embedding Approach to System Failure Rate Computation[J];Transactions of Beijing Institute of Technology;2006-09
6 WU Qing-tai~1,YE Er-hua~2 (1.College of Science,Nanjing Agric.Univ.,Nanjing 210095,China;2.College of Science,NUAA Nanjing 210016,China);Reliability Analysis of Two Components Warm Standby Repairable System with Continuous Lifetime Swithch When Two Failures' Repairment Is Different[J];Journal of Jiangxi Normal University (Natural Sciences Edition);2004-02
7 Huang Hongzhong (Southwest Jiaotong University Chengdu 610031);Fuzzy Random Reliability of k-out-of-n:G Systems[J];ACTA SCIENTIARUM NATURALIUM UNIVERSITATIS CHENGDUENSIS;1994-03
8 WANG Xue-min, XIE Li-yang, ZHOU Jin-yu, WANG Yun(School of Mechanical Engineering & Automation, Northeastern University, Shenyang 110004, China.);Reliability Model of Dependent Failure System[J];JOURNAL OF NORTHEASTERN UNIVERSITY;2004-09
9 CHEN Guang-juan, MENG Xian-yun, LIU Yan, LIU Le-chun, ZHANG Hai-feng, JIN Yia-pei ( College of Sciences, Yanshan University, Qinhuangdao Hebei, 066004, China);Reliability analysis of warm nonmaintained redundant of two different components repairable system with continuous lifetime switch[J];Journal of Yanshan University;2005-05
10 WANG Xiao-ning,ZHU De-heng,LI Fu-qi(Tsinghua University,Beijing 100084,China);Fault Modes and Fault Tree Analysis (FTA) of Large Turbogenerators[J];Large Electric Machine and Hydraulic Turbine;2004-04
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 JIA Ji-shen 1,REN Zhong-pu 2 (1.Department of Basic,Henan Mechanic and Electric Engineering College, Xinxiang 453002,China; 2.Anyang Teachers' College, Anyang 455002,China);Optimal Replacement Model for M/G/1 Queuing System with Repairable Service Station[J];Journal of Aayang Teachers College;2002-05
2 LI Zheng SONG Bao-wei MAO Zhao-yong (Marine College,Northwestern Polytechnical University.Xi'an 710072.China);Discussion on Storage Reliability of Material[J];Journal of Projectiles,Rockets,Missiles and Guidance;2005-S2
3 LIU Yan~1 TANG Ying-hui~2 (1.School of Applied Mathematics,Univ.of Electron.Sci.& Tech.of China Chengdu 610054;2.School of Mathematics & Software,Sichuan Normal University Chengdu 610066);A New Replacement Policy for the Repairable System of Single Component[J];Journal of University of Electronic Science and Technology of China;2007-S1
4 Su Baohe Zhuhai College,Jinan U niversity,Zhuhai5 190 70 ,China;COMPREHENSIVE STUDY ON EQUIPMENT RELIABILITY AND FAULT DIAGNOSIS[J];Automation of Electric Power Systems;2002-06
5 SU Bao-he,LIN Fu-yong,HE Min (Zhuhai College,Jinan University,Zhuhai 519070,China);The Reliablity and Optimal Inspection Cycle of 2-Unit Serise Systems[J];Systems Engineering;2002-06
6 JIA Jishen(Henan Mechanic and Electric Engineering College,Xinxiang 453002,China);Cost Analysis of Pro Rata and Free Warranty Policies[J];Journal of Industrial Engineering and Engineering Management;2004-02
7 XIE Xiu-mei1,ZHANG Min-yue1,YAO Tao2 (1.College of Sciences,Lanzhou University of Science and Technology,Lanzhou 730050,China;2.No.69330 of PLA,Hami 839200,China);Reliability Analysis of Three-component Cold Maintainable System with Priority[J];Journal of Gansu Sciences;2010-01
8 Jin Yansheng,Cao Jing(College of Science,Yanshan University,Qinhuangdao 066004,China);Gnedenko system attended by a repairman with multiple vacations[J];Journal of Natural Science of Heilongjiang University;2008-05
9 Jia Jishen; Wang Dongsheng and Wang Xiumei (Department of Basic Henan Mechanic and Electric Engineering College Xin xiang China 453002);A Kind of the Optimal Replacement Model Fora Tow-Identcal Component Cold Standby Repairable System[J];JOURNAL OF HENAN MECHANIC AND ELECTRIC ENGINEERING COLLEGE;1999-03
10 JIA Ji shen DUAN Zhen hui WANG Dong sheng (Department of Basic Course, Henan Mechanical and Electrical Engineering College, Xinxiang China 453002);An Monotone Repair Model for the Repairable System Consisting of One Component[J];Journal of Henan Mechanic and Electric Engineering College;2001-02
【Secondary Citations】
Chinese Journal Full-text Database 1 Hits
1 Shi Dinghua Shanghai Inst. of Railway Techn.;Reliability Analysis of a Two-Unit Series System[J];Journal of Fujian Normal University(Natural Science Edition);1982-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved