Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Industrial Construction》 2004-12
Add to Favorite Get Latest Update

THE INTEGRAL HOISTING TECHNOLOGY OF CHINA SOUTHERN AIRLINES GU ANGZHOU AIRCRAFT HANGAR

Guo Yanlin Deng Ke(Tsinghua University, Department of Civil Engineering Beijing 10008 4) Wang Hong Bao Guangjian Xu Chongliang (Shenzhen Jianshenghe Steel Structure and Construction Corporation Shenzhen 518029)  
Because of the merits of the integral hoisting in structural construct ion, i.e., simple construction instrument applied, assembling on the ground, hig h efficiency and safety, it has become the main special approaches for long-spa n steel structure construction recent years. It should be noted that during the p rocess of integral hoisting of steel structure, its displacement and stress dist ribution in the structures differ from their design condition, and the checking of stability and strength of members or structure become necessary. Some strengt h or stability-reinforce approaches to some members or structures must be emplo ye d for their construction safety. This paper presents the design of integral hois ting project of China southern airlines aircraft hangar and the structural techn ology problems involved in integral hoisting process. The integral hoisting proc ess and their details for this hangar are also described and discussed.
【CateGory Index】: TU758
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 7 Hits
1 Luo Yongfeng Yu Rui Wang Zhaobo (College of Civil Engineering,Tongji University Shanghai 200092) Shen Jianyi (Zhejiang Steel Structure Co.Ltd.,Zhongtian Construction Group Hangzhou 310000);THE WHOLE STRUCTURE LIFTING OF STEEL GALLERY OF CHANGSHA ZHONGTIAN SQUARE[J];Steel Construction;2007-09
2 Guo Yanlin Liu Xuewu(Department of Civil Engineering,Tsinghua University Beijing 100084);CONSTRUCTION MECHANICAL PROBLEMS AND COMPUTATIONAL METHODS OF COMPLEX STEEL STRUCTURES[J];Industrial Construction;2007-09
3 Liu Xuewu Guo Yanlin (Department of Civil Engineering,Tsinghua University Beijing 100084);PRE-SET CONSTRUCTION DEFORMATION VALUE AND ITS COMPUTATIONAL METHODS FOR STEEL STRUCTURES[J];Industrial Construction;2007-09
4 Guo Yanlin Liu Xuewu Liu Luyu Zhang Qinglin(Department of Civil Engineering,Tsinghua University Beijing 100084);ANALYSIS METHOD OF PRE-SET CONSTRUCTION DEFORMATION VALUES FOR THE NEW CCTV HEADQUARTERS[J];Industrial Construction;2007-09
5 Guo Yanlin Wang Yonghai Liu Xuewu(Department of Civil Engineering,Tsinghua University Beijing 100084)You Dajiang(Beijing Mechanized Construction Co.,Ltd Beijing 100045);INTEGRATED MODEL ANALYSES OF THE WHOLE LIFT OF STEEL ROOF FOR A380 AIR CRAFT HANGAR IN BEIJING CAPITAL INTERNATIONAL AIRPORT[J];Industrial Construction;2007-09
6 GUO Yan-lin,LIU Xue-wu,ZHANG Qing-lin,LIU Lu-yu,DOU Chao(Tsinghua University,Beijing 100084,China);Study and Application of Mechanical Problems During Construction Process of Complex Steel Structures[J];Construction Technology;2006-12
7 Peng Bin~1,Zheng Qizhen~1,Bao Yongliang~1,Jin Weifeng~2,Bai Qingfeng~2(1.University of Shanghai for Science and Technology,Shanghai 200093,China;2.Shanghai Mechanical Construction Co.,Ltd.,Shanghai 200072,China);Integral lift and Installation of Roof Trusses in Shanghai International Transportation Center[J];Construction Technology;2008-11
【Citations】
Chinese Journal Full-text Database 5 Hits
1 Wang Ce Fang Xiumei;Integral Hoisting of Steel Structure Roof in Singapore Mega Exhibition Center Engineering[J];Building Structure;1999-08
2 Liu Shutun; Guan Yilu(China Aeronautical Project and Design institute) (Beijing Mechanical Construction Co. );Design and Construction of the 306×90m Hangar Roof of Capital Airport[J];JOURNAL OF BUILDING STRUCTURES;1997-03
3 Yang Kun ;Du Min;AN INTEGRAL LIFTING TECHNOLOGY FOR THE INSTALLATION OF THE SUPER-HUGE NETWORK ROOF STRUCTURE OF A TWIN-AIRCRAFT SHOREHOUSE PROJECT[J];ARCHITECTURE TECHNOLOGY;1997-02
4 CHEN Jianghua WANG Zhiming;CONSTRUCTION TECHNOLOGY OF 486 m LONG ROOF FRAMING OF CITIZEN CENTER IN SHENZHEN[J];Architecture Technology;2002-05
5 Wu Jianzhong; Bian Yongming; Xu Mingqian(Mechanical College, Tongji University, Shanghai, 200092);Synchronizing Lift for the Integrated Steel Antenna Mast of Bright Oriental Pearl Radio and TV Tower[J];JOURNAL OF TONGJI UNIVERSITY;1996-01
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Shen Shungao 1 Liu Xianming 2 Ye Jihong 2 Li Aiqun 2 Huang Zhen 2 Zhou Qing 1 Shi Zhenhua 1 Xu Qingyang 2 ( 1College of Civil and Hydraulic Engineering, Tsinghua University, Beijing 100084, China) ( 2Key Lab of RC & PC Structure of Ministry of Education, Southeast University, Nanjing 210096, China);Test and analysis of dynamic characteristic of hangar of capital airport[J];Journal of Southeast University (Natural Science Edition);2003-01
2 Chen Jian et al.;Analysis on the Loading Test bed for Hydraulic Synchronous Lifting System[J];CONSTRUCTION MACHINERY AND EQUIPMENT;1998-06
3 Wang Zhengguang Liu Fuqi (Department of Civil Engineering,Zhejiang University Hangzhou 310027)Su Shujun(Headquarters of Anju Engineering of Wenzhou Wenzhou 325000);DESIGN AND CONSTRUCTION OF GYM'S CABLE-STAYED LONG-SPAN CANTILEVER RETICULATED SHELL ROOF[J];Steel Construction;2005-05
4 Bao Jiancong Qiao Jufu Lu Kekuan (Nanyang Petroleum Architecture Company Nanyang 473132)(Beijing Machinery Construction Company Beijing 100045);STUDY AND USE OF INTEGRAL LIFTING SPOTS OF STEEL STRUCTURE FOR A LARGE ROOF[J];Steel Construction;2005-05
5 Luo Yongfeng Yu Rui Wang Zhaobo (College of Civil Engineering,Tongji University Shanghai 200092) Shen Jianyi (Zhejiang Steel Structure Co.Ltd.,Zhongtian Construction Group Hangzhou 310000);THE WHOLE STRUCTURE LIFTING OF STEEL GALLERY OF CHANGSHA ZHONGTIAN SQUARE[J];Steel Construction;2007-09
6 Chen Jjan et al;The characteristics and application of hydraulic synchrolifting technology for large construction unit[J];MACHINE TOOL & HYDRAULICS;1999-06
7 GUO Yanlin1, MIAO Youwu1, LOU Junjie1, LIN Bing1, XU Yanlin2, CUI Wei2 (1.Department of Civil Engineering, Tsinghua University, Beijing 100084, China; 2.China Machinery Industry Installing Corporation, Beijing 100044, China);Integral lift design of the main trusses in Macao Gymnasium and analysis of the latticed hoist tower[J];Journal of Building Structures;2005-01
8 DENG Hui;CONSTRUCTION AND MONITORING OF LARGE-SPANNED EXTENSION TRUSS[J];Architecture Technology;2004-11
9 WANG Fan1,ZHENG Zhongli2,ZHENG Kaoqu3,DONG Zhengguo3(1.South China University of Technology,College of Architecture,510640,Guangzhou,China;2.Guangzhou Zhonghong Steel Structure Construction Co.,Ltd.,510055,Guangzhou,China;3.Guangxi Feijie Steel Structure Construction Co.,Ltd.,Guangzhou Branch,510055,Guangzhou,China);PRINCIPLE AND PRACTICE OF DOUBLE GIRDER INTEGRAL LIFTING OF BIG STRUCTURE[J];Architecture Technology;2006-08
10 ;Analysis of Loading Test Stand of Hydraulic Synchronous Lifting System for Large Frame Members[J];CONSTRUCTION MACHINERY;1998-06
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 SHAO Xiao-jian 1,SHI Kai 2,SHI Xin-yang 3 (1.Department of Construction Engineering,Tongji University,Shanghai 200092,China; 2.Wuxi Chemical Engineering Design & Research Institute,Wuxi 214031,China; 3.Qindao Transportation Engineering Supervise &;Analysis of creep,shrinkage,relax of prestressed tendons of the prestressed concrete frames with nonlinear finite element method[J];Building Science Research of Sichuan;2002-02
2 TANG Xing-guo,ZHONG Tie-yi (School of Civil Engineering and Architecture,Beijing Jiaotong University, Beijing 100044,China);Construction Simulation Analysis for High-Rise of Beijing Television Center[J];Journal of Beijing Jiaotong University;2006-01
3 Liao Li (Department of Applied Mechanics, Beijing Institute of Technology, Beijing, 100081) Zhang Ning (Beijing General Municipal Engineering Design & Research Institute);FEM FOR CREEP AND SHRINKAGE OF CONCRETE STRUCTURES[J];Acta Armamentarii;2000-S1
4 Xu Maozeng (Management Engineering Department);Fault Detection and Diagnosis of the National Economic System (Ⅱ): the Sturctral Fault Detection with Apptications[J];Journal of Chongqing Jiaotong University;1992-01
5 YANG Xuan,ZHOU Shui-xing(School of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,China);Method to Determine Construction Cable Tension Force of Cable-Stayed Bridge[J];Journal of Chongqing Jiaotong University(Natural Science);2008-01
6 Jiang TianHua, Zhang HaiLong;Application of Kalman Filtering Method in Error Control of Construction of Cable-Stayed Bridges[J];Urban Roads Bridges & Flood Control;2002-04
7 He Xiufeng 1, Hua Xisheng 1, Ding Xiaoli 2, Chen Yongqi 2, Sun Yongrong 2 (1. Hohai University, Nanjing 210098, China; 2. The Hong Kong Polytechnic University, Hongkong, China);DEVELOPMENT OF GPS MULTI-ANTENNA BASED DEFORMATION MONITORING SYSTEM[J];Dam Observation and Geotechnical Tests;2002-03
8 Deng Zichen(Northwestern Polytechnical University);THE DEVELOPMENT AND PRESENT SITUATION OF THE OPTIMAL CONTROL THEORY[J];EXPLORATION OF NATURE;1994-02
9 Zhang Qilin (Tongji University);A CABLE ELEMNT THEORY FOR NONLINEAR ANALYSIS OF PRESTRESSED STRUCTURES[J];Engineering Mechanics;1993-04
10 SHAN Jian; YI Jun; ZHENG Qin-gang(SoutheaSt University, Naming 210018);INVESTIGATION INTO THE BEHAVIOR OF LOAD RELIEVING SYSTEMS UNDER LOADING[J];ENGINEERING MECHANICS;1999-03
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 HU Chang-ming,ZENG Fan-kui,LI Yong-hui,YAN Xin(Civil Engineering College of Xi'an University of Architecture and Technology,Xi'an,Shannxi 710055,China);CONSTRUCTION PROCESS SIMULATION AND ACTUAL ANALYSIS OF PALMS TOGETHER DAGOBA IN FAMEN TEMPLE[J];Engineering Mechanics;2009-S1
2 Zheng Jiang~1 Hao Jiping~1 Li Cunliang~2 Yang Xiaoli~3 Wang Xiantie~1 Liu Shaowen~1(1.Xi'an University of Architecture and Technology,Xi'an 710055,China;2.Shanxi Mechanical Engineering Construction Company,Xi'an 710032,China;3.China New Era International Engineering Coporation,Xi'an 710054,China);MECHANICS EMULATION AND ANALYSIS OF THE HESHI STUPA OF FAMEN TEMPLE DURING THE CONSTRUCTION PROCESS[J];Industrial Construction;2009-10
3 DIAO Jian-peng,HUANG Sheng-xiang(School of Geodesy and Geomatics,Wuhan University,Wuhan 430079,China);The deformation monitoring and data analysis for the main building of CCTV new station[J];Engineering of Surveying and Mapping;2009-05
4 ZHANG Shen-wei1,LUO Xiao-qun2,ZHANG Qi-lin2(1.School of Civil Engineering,Shandong Univ,Jinan,Shandong 250061,China;2.School of Civil Engineering,Tongji Univ,Shanghai 200092,China);Numerical Simulation Analysis and Model Test for the Tension Process of Hyperbolic Cable Net Structures[J];Journal of Hunan University(Natural Sciences);2009-01
5 MO Nan-ming GUO Jing-jun (1.Artistic Design and Construction Engineering Department of Kunming University,Kunming 650118,China;2.School of Civil Engineering,Tsinghua University,Beijing,100084,China);A Transfer Precision Study of Interior Horizontal Coordinates of Oblique Super High-Rise Buildings[J];Journal of Chongqing Jianzhu University;2008-04
6 ZHANG Shen-wei1,CHEN Lu2,ZHANG Qi-lin2(1.College of Civil Engineering,Shandong University,Jinan 250061,P.R.China;2.Department of Building Structures,Tongji University,Shanghai,200092,P.R.China);A New Method to Measure Cable Force and Its Application in Cable Structures[J];Journal of Chongqing Jianzhu University;2008-06
7 GUO Yanlin,TIAN Guangyu,LIU Xuewu (Department of Civil Engineering,Tsinghua University,Beijing 100084,China);Analysis on the influence of foundation settlement on the pre-set deformation value of New CCTV Building[J];Journal of Building Structures;2008-03
8 LIU Lan-tao1,XU Ning2,SONG Xiu-jun1(1.Qingdao Construction Group Co.Ltd,Qingdao 266071,China;2.Laoshan District Construction Quality Control Station,Qingdao 266061,China);Installation Technology Research on All-Suspended Inverted Multistory Service Cat Walk[J];Journal of Qingdao Technological University;2008-06
9 Jiang Leixin,Guo Yanlin,Liu Xuewu(Tsinghua University,Beijing 100084,China);Analysis of Internal Forces During the Construction of Guangzhou Pearl River New Town West-tower[J];Construction Technology;2008-05
10 Chen Lu~1,Li Yaming~2,Zhang Qilin~1,Zhang Shenwei~3,Zhou Xiaofeng~2(1.Tongji University,Shanghai 200092,China;2.Shanghai Xian Dai Architecture Design(Group) Co.,Ltd.,Shanghai 200041,China;3.Shandong University,Ji'nan,Shandong 250061,China);Scale Model Test Study on Double-camber Cable Net in China Navigation Museum[J];Construction Technology;2008-11
【Secondary Citations】
Chinese Journal Full-text Database 2 Hits
1 Wang Ce;Zhu Hong;Chen Yunbo(Central Research Institute of Building and construction, MMI);THE MEASURE OF SUSPENDED DOUBLE-LAYER GRID DURING WHOLE BODY LIFT-UP AND ERECTION OF THE TENSION CABLE IN ZHAN JIANG GLASS FACTORY[J];;1994-04
2 Wang Ce Fang Xiumei Chen Yunbo;The Design of Tower Column and Suspended Cable in Singapore PSA Project[J];Building Structure;1997-05
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved