Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Industrial Construction》 2011-05
Add to Favorite Get Latest Update

TOP-DOWN CONSTRUCTION METHOD OF PRESSURED GROUT PRESTRESSED ANTI-FLOATING ANCHOR AND ITS APPLICATION IN THE CORROSIVE CONFINED WATER SOIL LAYERS

Liu Jianguo Yang Baosen Chen Guoqiang Wu Siyu (Central Research Institute of Building and Construction Corporation Limited,MCC,Beijing 100088,China)  
The top-down construction method of pressured grout prestressed anti-floating anchor used in Taiyuan Wanda Plaza was introduced.This kind of anchor posesses of good durability when beared compression so that the anchor fixed length was not easy to crack.In the meanwhile,the flexible arrangements and high anchoring efficiency were good for the even stress of foundation plate.In this project,the influnce of confined water was successfully removed by driving steel pipes into the layer,with which the abundant confined water was cut off and running sand was separated.Several kinds of measures were taken to prevent ground water from leaking into the basement and it was proved to be in good effect.At the same time,top-dowm construction method of anti-floating anchor was discussed.
【CateGory Index】: TU753
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 5 Hits
1 ZENG Guo-ji et al;Analysis on Present Situation of Anti-floating Technology Application[J];Underground Space;2004-01
2 Liu Jianguo Liu Bo(Central Research Institute of Building and Construction,MCC Group Beijing 100088);ANTI-FLOATING DESIGN AND ENGINEERING TECHNOLOGY OF BUILDINGS[J];Industrial Construction;2007-04
3 HUANG Qi qi1,ZHOU Jian1,2(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092;2.Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Tongji University,Shanghai 200092,China);Application of Anti-floating Anchor in Engineering Design[J];Soil Engineering and Foundation;2008-03
4 LIU Jian-guo1,WU Ping1,YIN Hua-gang2,ZHONG Dong-bo1,LI Shu-wei1,ZHOU Hai-lin1,LI Zhi-qiang2,XU Han1(1.Central Research Institute of Building and Construction,China Metallurgical Construction Group Corporation,Beijing 100088,China;2.Beijing Special Engineering Design and Research Institute,Beijing 100028,China);PRESSURE-DISPERSIVE ANTI-FLOAT ANCHOR TECHNIQUE AND ITS APPLICATION TO ENGINEERING[J];Chinese Journal of Rock Mechanics and Engineering;2005-21
5 JIA Jinqing1,2,SONG Erxiang1(1.Department of Civil Engineering,Tsinghua University,Beijing 100084,China;2.Department of Civil Eng.,Dalian University of Technology,Dalian 116024,China);The design and test on antifloating anchorage of large substructure in coastal region[J];Chinese Jounal of Geotechnical Engineering;2002-06
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 YUAN Zheng-ru(Engineering Institute of Engineering Corps,PLA Univ.of Sci.& Tech.Nanjing 210007,China);Problems in Design of Anti-uplift in Underground Engineering[J];Chinese Journal of Underground Space and Engineering;2007-03
2 CHEN Guo-zhou,JIA Jin-qing(State Key Laboratory of Coastal and Offshore Engineering,Dalian University of Technology,Dalian 116024,P.R.China);Nonlinear Analysis of Stress Distribution of Tension Anchor[J];Chinese Journal of Underground Space and Engineering;2008-01
3 Liu Faqian;Discussion on Anti-floatation Design of Underground Structure[J];Urban Roads Bridges & Flood Control;2010-06
4 CHENG Yongfeng, LU Xianlong, ZHENG Weifeng (China Electric Power Research Institute, Beijing 100055, China);Application of Rock Anchor Foundation in Transmission Line[J];Electric Power Construction;2012-05
5 ZHAO Fu-chao(Shanxi Electric Power Exploration & Design Institute,Taiyuan,Shanxi 030001,China);Characteristic and Numerical Analysis on Pressure-dispersive Anti-float Anchor[J];Shanxi Electric Power;2009-S1
6 LIU Xiao-yong,ZHANG Wen-biao(Shanghai ATON Environmental Limited Liability Company,Shanghai 200092,China);Anchor in the Structure of Anti-floating Design[J];Construction & Design for Project;2010-08
7 HUANG Shan(School of Civil Engineering,Guangzhou University,Guangzhou 510006,China);Analysis of Interaction of Anti-floating Anchor and Basement Soleplate[J];Construction & Design for Project;2012-01
8 QI Jun1 LIN Tong2 DU Jun3(1.Qingdao Institute of Marine Geology,Qingdao 266071,China;2.Fuzhou architectural design institute,Fuzhou 350001,China;3.The First Institute of Oceanography,SOA,Qingdao 266061,China);Investigation on Testing and Detection of Soil Floating Resistance Anchor and its Pullout Resistant Force[J];Construction Quality;2010-07
9 Wu Jiawu Han Jintian Liu Yongjian Fu Na (Guangdong University of Technology Guangzhou 510006,China);The Application of Anti-floating Anchor in Reinforcing the Floating Accident of Swimming Pool[J];Guangdong Architecture Civil Engineering;2010-12
10 Liang Shihua(Institute of Geotechnical Engineering,Guangdong University of Technology Guangzhou 510643)Wang Shichuan(Xi'an University of Architecture & Technology Xi'an 710055)Song Pandeng(Guangdong Humen Engineering Consultants Co.,Ltd Guangzhou 510630);APPLICATION OF PRESTRESSED FLOAT-RESISTING ANCHORAGE CABLE WITH ENLARGED BASE IN AN UNDERGROUND PROJECT[J];Industrial Construction;2006-S1
China Proceedings of conference Full-text Database 6 Hits
1 ZHANG Yong~1,ZHAO Hong-ling~2,FENG Jin-ji~1,LI Bao-bao~1 (1.The Third Research Institute of Engineering Corps.General Staff of PLA,Luoyang,Henan471023,China; 2.Department of Civil Engineering,Luoyang Institute ofScience and Technology,Luoyang,Henan 471023,China);DISCUSSION ON FOUR STRESSING METHODS FOR PRESSURE DISPERSION ANCHOR CABLES INSTALLATION[A];[C];2011
2 ZHANG Yong~1,ZHAO Hongling~2,ZHANG Xangyang~1 (1.The Third Research Institute of the Corps of Engineers,General Staff of PLA,Luoyang,Henan 471023,China; 2.Department of Civil Engineering,Luoyang Institute of Science and Technology,Luoyang,Henan 471023,China);TEST STUDY OF MECHANICAL PERFORMANCES OF ANCHORAGE ZONE OF PRESSURE DISPERSION ANCHOR CABLE STYLE[A];[C];2010
3 YE Jun-neng~1,LIU Xiao-hu~2 (1.Ningbo urban rail transit project construction headquarter,Ningbo 315012,China;2.Faculty of Architectural Civil Engineering and Environment,Ningbo University,Ningbo 315211,China);Safety Design of Metro Station Structures Anti-floating Considering Friction Resistance in Support Engineering[A];[C];2010
4 Xu Hao,Pei Hongzhi,Ding Shanlin (Technology Management Department of Huaihai Real estate enterprise department of Greenland Group,Xuzhou 221000,China);Anti-floating scheme optimization of underground garage of Block-G of Xuzhou high-speed rail[A];[C];2013
5 Zhu Zhifeng (CCDI GROUP,Shanghai 200235,China);Discussion on the design of anti-float anchor(cable) in soft soil geological condition[A];[C];2013
6 Ju Wei (Tongji Architectural Design(Group)Co.,Ltd.,Shanghai 200092,China);Selection and application of the anti-floating method in one large basement[A];[C];2013
【Co-references】
Chinese Journal Full-text Database 2 Hits
1 Liu Hanchao,Ren Kunpeng,Zhao Yanyan,Zhou Zonghui(Beijing Urban Construction Group the Fifth Construction Engineering Co.,Ltd.,Beijing 100029,China);Design and Construction of Vertical Anti-floating Anchor in Some Project[J];Construction Technology;2009-09
2 Mo Jun,Chen Zhiguang(China Construction Second Engineering Bureau Co.,Ltd.,Beijing 100054,China);Construction of Anti-floating Anchors Under High Water Level and Waterproofing of Slab[J];Construction Technology;2012-S1
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 ZENG Guo-ji et al;Analysis on Present Situation of Anti-floating Technology Application[J];Underground Space;2004-01
2 ? 威,陈德拔,杨华民 (建设部综合勘察研究设计院,北京 100007);复杂地质条件下预应力抗浮锚杆的应用[J];GEOTICHNICAL INVESTIGATION AND SURVEYING;2000-02
3 CHEN Zu-yu,YANG Jian (Rock-soil Engineering Institute,China Academy of Science & Research For Conservancy & Hydropower,Beijing,100044,China);Development of Prestress Anchor Technology in Rock-soil Engineering[J];Guizhou Water Power;2004-05
4 Cheng Liangkui(Central Research Institute of Building and Construction, MMI Beijing 100088) Han Jun(Yangtze River Scientific Research Institute Wuhan 430010);THEORY AND PRACTICE OF THE SINGLE BORE MULTIPLE ANCHOR METHOD[J];Industrial Construction;2001-05
5 Tang Dafan Ning Rende(Anshan Metallurgical Engineering and Research Institute,MMI Anshan\ 114002);DESIGN FOR AN ANTI BUOYANCE AND ANTI CORROSION STRUCTURE OF THE LARGE SCALE RADIAL THICKENER(85 METER DIA )[J];INDUSTRIAL CONSTRUCTION;1999-08
6 Wei Hong Shu Xuanwu;Test and Design of Prestressed Concrete Pile as Resistant Extraction Pile in Guangdong Olympic Gym Center[J];Building Structure;2001-05
7 Wang Sheng;Anchor Rod of Prestressed Steel Twisting Wire Used in the Floatproof of the Underground Parking Lot[J];Building Structure;2001-08
8 Xu ChunGuo;Appraisal and Reinforcement for a Basement Rising and Cracking[J];Building Structure;2002-11
9 ZHOU Hui 1,XIONG Ju hua 2,QI Hong xiang 3 (1 Pudong New Zone Hydraulic Planning and Designing Institute of Shanghai City,Shanghai 201200,China;2.Tongji University,Shanghai 200029,China; 3.Shanghai City Hydraulic Municipal Engineering Company,;INFLUENCE ANALYSIS OF UNDERGROUND WATER TO FOUNDATION BACKGROUND[J];Jiangxi Hydraulic Science & Technology;2001-01
10 Jiang Chanhui,Lai Youxiu (Longgang Geological Development Co. Shenzhen, 518116);An Example of Treating the Floating-up of A Basement by Method of Well Point Dewatering and Surface Loading[J];Soie Engineering and Foundation;1999-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved