Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Hebei University(Natural Science Edition)》 2003-04
Add to Favorite Get Latest Update

Estimation of Software Cost on Reliability

LIU Peipei (Department of Computer Science and Engineering, North China Electronic Power University, Baoding 071003 , China)  
Introducing the estimation method on software cost for reliability. Summing up the basic principle,theoretical origin and operational function of stimulation method, software testing time model ,relation regression method and artificial intelligence method so that the cost estimation of reliability will approximate the real condition much better.
【CateGory Index】: TP311.5
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 3 Hits
1 BU He,JIN Yong-sheng,LI Jing(School of Economics and Management,Beijing University of Posts and Telecommunications,Beijing 100876,China);The Oerformance Evaluation of Telecom Operators Sales Cost Based on the Analytic Hierarchy Process[J];Journal of Beijing University of Posts and Telecommunications(Social Sciences Edition);2010-02
2 HUANG Ning,CHEN Wei-ru,SHI Shuai(Dept.of Computer Science and Technology,Shenyang Institute of Chemical Technology,Shenyang 110142,China);Study on Evaluation Oriented Reliability-Cost Model[J];Journal of Jiamusi University(Natural Science Edition);2009-01
3 GU Ai-hua;ZHANG Chun-yang;HU Qing-xin;School of Computer and Information,Hefei University of Technology;;Improvement of Software Reliability Growth G-O Model[J];Journal of Inner Mongolia University(Natural Science Edition);2014-02
【Citations】
Chinese Journal Full-text Database 2 Hits
1 Li Fang\ \ Zhu Cheng\ \ Wang WeiInstitute of System Engineering, Huazhong University\ \ Dept. of Management Engineering, of Science and Technology,Wuhan 430074Naval University of Engineering, Wuh;Model Research of Software-Testing Cost and Resource Optimization[J];Systems Engineering and Electronics;2000-03
2 LIU Ming, ZHAO Bao jun, YANG Jian jun, LIU Yi jing, ZHANG Jing wei(Missile Institute, Air Force Engineering University, Sanyuan 713800, China);Method of Equipment Cost Estimation Based on the Fusion of GA and BP Algorithms[J];Systems Engineering and Electronics;2002-02
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 LAI Yong-qiang1, ZHANG Hai-shan2, HE Yuan-bo2, GU Xiang-yu3, CHEN Hui4, SHAO Jie2, WANG Dong2 (1. No. 16 Brigade of Graduate, Air Defense Forces Command Academy, Zhengzhou 450052, China; 2. No. 77616 Unit of PLA, Lasa 850000, China; 3. No. 65657 Unit of PLA, Chifeng 024200, China; 4. No. 68252 Unit of PLA, Wuzhong, 751102 China);Evaluation of Operational Command Capability For Air Defense Force Based On BP-GA[J];Ordnance Industry Automation;2007-11
2 CONG Min LU Min yan (Beijing University of Aeronautics and Astronautics, Dept. of System Engineering of Engineering Technology) BAI Yun feng (Gao Hong Telecommunication Co.Ltd);Study and Implementation of Software-Reliability Prediction Method[J];Journal of Beijing University of Aeronautics and Astronautics;2002-01
3 Li Qiuying Lu Minyan Ruan Lian (Dept. of System Engineering of Engineering Technology, Beijing University of Aeronautics and Astronautics);Theoretical Research on Software Reliability Testing Adequacy[J];Journal of Beijing University of Aeronautics and Astronautics;2003-04
4 ZHANG Jun-guang (school of Economics and Management,University of Science and Technology Beijing,Beijing 100083,China);A Method for Result Validity Verifying of Software Project Schedule Estimation[J];Journal of Beijing University of Posts and Telecommunications;2008-05
5 WU Fuquan1,SU Xiaowei2(1.Southwest Institute of Electronic Equipment,Chengdu 610036,China;2.Chengdu University of Broadcasting and Television,Chengdu 610051,China);On Evaluation of Software Quality[J];Journal of Chengdu University(Natural Science Edition);2008-01
6 LIU Ming-zhen,XU Ke-jing(Computer & Information College,Yang-En University,Quanzhou Fujian 362014,China);The Study on the Influence of Software Reliability Engineering on the Development of Software Industry[J];Science Technology and Industry;2008-09
7 QU Zhao-yang,XUE Liang,LUO Wei(Department of Information Engineering,Northeast China Institute of Electric Power Engineering,Jilin City 132012);Application and Analysis of a New Software Testing Process Frame Model[J];Journal of Northeast China Institute of Electric Power Engineering(Natural Science Edition);2005-04
8 Shao Qing , Gao Jianhua (Department of Computer Science, China Textile University, Shanghai,200051)Tao Renguo (XinMing Telephone Office, Shanghai, 201100);Analysis of Telephone Sales Management and its Reliability[J];;1998-06
9 SUN Jing,LIU Xiao-ming (PLA University of Science and Technology Nanjing 210007);A Software Reliability Model with Exponential Repair Time[J];Journal of University of Electronic Science and Technology of China;2005-01
10 LEI Hang1 and MA Cheng-gong2 (1.School of Software,University of Electronic Science and Technology of China Chengdu 610054;2.School of Computer Science and Engineering,University of Electronic Science and Technology of China Chengdu 610054);Testing Adequacy of Software Reliability in Markov Model[J];Journal of University of Electronic Science and Technology of China;2010-01
China Proceedings of conference Full-text Database 3 Hits
1 Sun Liou Tang Yinghui School of Applied Mathematics, University of Electronic Science And Technology of China, Chengduu, Sichuan 610054; School of Mathematics & Software Science, Sichuan Normal University, Chengdu, Sichuan 610066;Software Testing Cost Model with Fault Removal Efficiency Function of Time[A];[C];2006
2 Wang Yingli~1 Xu Xiaohao~2 ~1Northwest Regional Air Traffic Management Bureau of Civil Aviation of China,Xi'an 710082 ~2Civil Aviation University of China,Tianjin 300300;A Weighed Algorithm for Software Reliability Model Selection[A];[C];2007
3 YANG Qi-guo (Southwest China Institute of Electronic Technology,Chengdu 610036,China);A Method to Improve the Software Reliability Prediction Quality[A];[C];2009
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 TIAN Zhi-xue, YE Jian, ZHANG Xu(School of Economics and Management, Beijing University of Aeronautics and Astronautics, Beijing 100083);Project Object Cost and Time Control Reseach[J];Journal of Beijing University of Aeronautics and Astronautics(Social Sciences Edition);2001-04
2 MA Xing-yuan,GUO Jian-ying,ZHAO Hai-qiu(School of Measurement-Control Technology & Communications Engineering,The Higher Educational Key Laboratory for Measuring & Control Technology and Instrumentations of Heilongjiang Province,Harbin University of Science and Technology,Harbin 150080,China);Improvement of software reliability growth G-O model[J];Transducer and Microsystem Technologies;2011-05
3 LI Lin,LI Shu cheng,WANG Dao ping (School of Business Management,Hunan University,Changsha 410082,China);Based on Risk-Analysis' Estimating Method of Project's Duration[J];Systems Engineering;2001-05
4 XIE Fang-you ,ZHU Yuan-quan (Economic and Technologic Developme nt Commission of Juhua Group Gorp,Quzhou 324004,China);Project Management in Large-sized SOE[J];Chemical Techno Economics;2002-02
5 Li Haifeng,Li Qiuying,and Lu Minyan(School of Reliability and Systems Engineering,Beihang University,Beijing 100191);Software Reliability Modeling with Logistic Test Coverage Function[J];Journal of Computer Research and Development;2011-02
6 GUO Hongfang1, ZENG Xiangyang 2 (1 .South China Normal University, Guangzhou 5l0631; 2.China Electronic Product Reliability and Environmental Testing Research institute, Guangzhou 510610);Risk Analysis Method Research[J];Computer Engineering;2001-03
7 SUI Junhua1,FAN Lingchun2,ZHANG Haisheng1(1.Chengdu Institute of Computer Application,Chinese Academy of Sciences,Chengdu 610041;2.Network Center,Earthquake Bureau of Sichuan Province,Chengdu 610041);Research on Software Reliability Prediction Technology[J];Computer Engineering;2006-01
8 LU Ling (The institute of the post and telecommunications of the circuit with designing the institute systematically of Xi'an,Xi'an 710061,China);About the State of the Project Development Management of IT Industry in Our Country[J];;2004-04
9 DING Xiang-qian1, SHI Shuo2 (Ocean University of China, 1. Information Engineering Center, 2. Department of Computer Science, Qingdao 266071, China);Application of the Analytic Hierarchy Process to Project Risk Management[J];Journal of Ocean University of Qingdao;2004-01
10 XIE Jing-Yan+, AN Jin-Xia, ZHU Ji-Hong (Department of Computer Science and Technology, Tsinghua University, Beijing 100084, China);NHPP Software Reliability Growth Model Considering Imperfect Debugging[J];Journal of Software;2010-05
【Secondary References】
Chinese Journal Full-text Database 5 Hits
1 CHEN Ying-jie(School of Physical Education,Fuyang Teachers College,Fuyang Anhui 236037,China);Research on entropy-based weight selecting in evaluation systems of college physical education[J];Journal of Fuyang Teachers College(Natural Science);2012-03
2 Huang Ning Chen Weiru Shi Shuai(School of Computer Science and Technology,Shenyang Institute of Chemical Technology,Shenyang 110142,Liaoning,China);SOFTWARE RELIABILITY ALLOCATION METHOD BASED ON DYNAMIC PLANNING[J];Computer Applications and Software;2011-03
3 QIU Ze-guo(Dongbei university of Finance and Economics,Dalian 116025,China);The Study of China's IT Project Management and Application Strategies[J];Journal of Harbin University of Commerce(Social Science Edition);2013-01
4 LENG Yonggang(China United Network Communications CO.,LTD.Shenzhen Branch,Shenzhen 518048,P.R.China);Customer value evaluation system based On 3G data service[J];Digital Communication;2012-04
5 ZHAO Rui-man;PAN Guan-hua;FANG Jian-yong;WANG Lei;Jiangsu Automation Research Institute of CSIC;;Software Reliability Model Based on Time-varying Learning Effects[J];Computer Technology and Development;2015-06
【Secondary Citations】
Chinese Journal Full-text Database 1 Hits
1 Liu Ming Chen Yang Chen YonggeAir Force Missile Institute, Shaanxi 713800;BP Network′s Application in the Study of the Cost of Air Defence Missile Ordering[J];Systems Engineering and Electronics;2000-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved