|
1 |
YE Qian1,JIN Wei-liang 1,HE Yong 1,SHI Zhong-min 2,QU Yan2(1.Institute of Structural Engineering,Zhejiang University,Hangzhou 310058,China;2.Research Center of China National Offshore Oil Corporation,Beijing:100027,China);Assessment of Ultimate Strength of Semi-submersible Platform[J];Journal of Ship Mechanics;2012-03 |
2 |
XIAO Yue,WANG Yan-ying~* (School of Naval Archit.,Dalian Univ.of Technol.,Dalian 116024,China);Computational analysis of moored floating-body[J];Journal of Dalian University of Technology;2005-05 |
3 |
CHEN Peng1,MA Jun2,YANG Qing-song1(1.China Ship Scientific Research Center,Wuxi 214082,China; 2.Dalian University of Technology,Dalian 116024,China);Coupled-dynamic response investigation of taut-wire mooring systems for deepwater semi-subermersible platform[J];Journal of Dalian Maritime University;2013-01 |
4 |
YUE Ji-xiang,QI Yao-guang,XIAO Wen-sheng,YANG Yi-pu(College of Mechanical and Electronic Engineering in China University of Petroleum,Dongying 257061,China);Drill floor layout of dual derrick rigs of semi-submersible drilling platforms[J];Journal of China University of Petroleum(Edition of Natural Science);2008-06 |
5 |
Yan Bo;Song Linsong;Hu Minglan;CNOOC Oilfield Services Limited;;Quasi-static analysis of the dynamic effect of a jack-up rig's work load during safe drilling operation[J];Natural Gas Industry;2013-09 |
6 |
Shi Lei;Zhang Hong;Feng Ding;Ma Wei;Yan Jian;Li Zhimin;School of Mechanical Engineering,Yangtze University;;Mechanical Analysis of Offshore Riser[J];China Petroleum Machinery;2013-11 |
7 |
DU Qing-gui;FENG Wei;XIE Bin;LI Xun-ke;SU Jing;Research Institute,CNOOC;Deepwater Drilling Unit Project Group,CNOOC;;Research to the Motion Performance of a Semi Submersible Drilling Platform Carrying Different Quantity of Mooring Chains[J];Oil Field Equipment;2014-03 |
8 |
YU Long1 WANG Juan2(1 Shanghai Jiaotong University,Shanghai 200030;2 Changjiang Ship Design Institute,Wuhan,430062,China);DYNAMIC ANALSIS OF THE 3D MOORING SYSTEM ON SEMISUBMERSIBLE PLATFORM IN DEEP WATER[J];China Offshore Platform;2007-06 |
9 |
MA Yan de 1, ZHANG Song tao 2, LIU Wei wei 2 (1. Dalian New Shipbuilding Heavy Industry Co. LTD, Dalian 116021, China; 2. School of Michanical Engineering, Dalian University of Technology, Dalian 116024, China);Study of Key Safety Technologies on Large Size Semi-submersible Rigs[J];Shipbuilding of China;2003-02 |
10 |
Wang Shisheng1 Xie Bin1 Zeng Hengyi2 Feng Wei1 Zhang Haibin3 (1.CNOOC Research Center,Beijing,100027;2.CNOOC,Beijing,100010;3.Marine Design & Research Institute of China,Shanghai,200011);Study on motion performance of 3 000 meters deep-water semi-submersible drilling platform[J];China Offshore Oil and Gas;2007-04 |
|