Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Jiangsu University of Science and Technology(Social Science Edition)》 2010-04
Add to Favorite Get Latest Update

Frame Construction of Investment Risk Analysis of Shipbuilding Project Based on Monte Carlo Simulation

YAO Huili,LIAN Chunguang,BAI Jingxian(School of Economics and Management,Jiangsu University of Science and Technology,Zhenjiang Jiangsu 212003,China)  
Shipbuilding project risk analysis is an important part of investment decisions.Risk variables of investment risk analysis of shipbuilding project are characterized by multiplicity and complex dynamicity.Monte Carlo simulation can be a good solution to this problem.This paper builds a framework of investment risk analysis of shipbuilding project based on Monte Carlo simulation Under the conditions of Monte Carlo simulation and starting from risk identification,risk estimation and risk assessment,and for each process we determine the realization path.
【Fund】: 国家自然科学基金项目“基于POMDD的个性化营销资源动态分配建模与实证研究”(08SJD6300014)
【CateGory Index】: F407.474;F224
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 4 Hits
1 Yin Zhijun, Chen Liwen, Wang Shuangzheng, Su Chunsheng (School of Management, Hebei University of Technology, Tianjin 300130,China);Study on The Advance of Project Risk Management in China[J];Optimization of Capital Construction;2002-04
2 JIANG Peng-fei(Tianjin Municipal Engineering Design Institute,Tianjin 300051,China);Research on Simplified Simulating of Monte Carlo Risk Probability Analysis of Project Based on Net Present Value Rule[J];Technology Economics;2007-07
3 Gou Sanquan(School of Management,China University of Mining and Technology,Beijing,100083,China);Review of Risk Analysis of Exploiting Oil Fields[J];Petroleum Drilling Techniques;2007-02
4 ;It's urgent to bring in place the early warning system for China's shipbuilding[J];China Ship Survey;2004-09
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 CHEN Hui1,ZHU Jian2,ZHANG Qinghua3,CUI Shumei1,XIN Cuixiang1(1.School of Civil Engineering in Yantai University,Yantai 264005,China;2.Yanjian Clique Limited Company,Yantai 264005,China;3.Yantai International Ecnomic & Technical Coopaeration Co.,Ltd,Yantai 264005,China);Application of MCS in estimating for project[J];Sichuan Building Science;2007-05
2 ZHOU Xiao hong (Anhui University of Technology and Science, Wuhu 241000, China);Risk analysis of hi-tech project[J];Journal of Anhui University of Technology and Science;2003-02
3 ZHULi -long(Dept.of Trade and Economy,ATTC,Fengyang,Anhui 233100);A Study on the Strategy of Investment Realization for Sustainable Agricultural Development[J];Journal of Anhui Agricultural University;2001-04
4 LI Tao(School of Management,Tianjin University,Tianjin 300072);Study on the Ecological Risk Analysis and Ecotourism System Management[J];Journal of Anhui Agricultural Sciences;2006-24
5 HUANG Hong-Wei~1,ZENG Ming~2,CHEN Liang~1,HU Qun-fang~1(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.General Office of Commanding Post of Shanghai Tunnel & Bridge Construction,Shanghai 200120,China);Risk Management Software (TRM1.0) Based on Risk Database for Shield Tunneling[J];Chinese Journal of Underground Space and Engineering;2006-01
6 XIANG Shou-sheng2,XUE Xiao-rong1(1.School of Economics and Management,Chang'an University,Xi'an 710064,China;2.Xi'an University of Finance and Economics,Xi'an 710061,China);The Application of Excel into Investment Project Probability Analysis[J];Commercial Research;2008-07
7 WU Jing,JIA Hong-yan (School of Economics and Management,Harbin Engineering University,Harbin 150001,China);The Research on Item Risk of Combined Heat and Power Generation[J];Commercial Research;2009-05
8 ZHANG Zi-jian (School of Management, Tianjin University, Tianjin 30072, China);Research of risk cause of formation of product development item based on the explanatory structural model[J];Ship Engineering;2007-06
9 MA Guo-shun,QI Chun-ze(College of Mathematics and Information Science,Northwest Normal University,Lanzhou 730070,China);Improvement of Probability Analysis of Project Investment Risk[J];Journal of Changchun Normal University;2006-10
10 ZHANG Li-qing (Mechanical Engineering Institute,Changchun University,Changchun 130022,China);Methods of prolonging project life[J];Journal of Changchun University;2008-06
China Proceedings of conference Full-text Database 3 Hits
1 Du Hong-mei Liu Ming-sheng (Academy ofEquipment Command & Technology,Beijing,101416);Study on the Risk Assessment Based on the Cloud Model[A];[C];2009
2 ;基于风险网络的大型工程项目风险度量方法研究[A];[C];2009
3 JIANG Bo~1,LIU Chang-bin~2,FENG Yan-ping~1 (1.School of Economics and Management,Beijing Jiaotong University,Beijing:100044 2.School of Economics and Management,Beijing University of Civil Engineering and Architecture,Beijing:100044);The study of the risk management model of construction project[A];[C];2009
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 LIU De xue, XIA Jian, FAN Zhi ping (School of Business Administration, Northeastern University, Shenyang 110004, China.;A Real Option Method for Assessing the Value of Venture Capital Project[J];JOURNAL OF NORTHEASTERN UNIVERSITY;2002-05
2 Wang Haichao,Yang Guangxi (The Department of Civil Engineering and Mechanics, Yanshan University, Qinhuangdao 066004). (Bohai Aluminium Industary Ltd., Qinhuangdao 066004).;Applicability - Studies of The Secondary Critical Path Planing in The Construction Optimum Management[J];JOURNAL OF YANSHAN UNIVERSITY;2000-01
3 GAO Jie (Hunan Institute of Engineering,Xiangtan 411101,China);A Method of Drawing an AOA Network Diagram according to the Schedule of Ordinary Successor Activities[J];Systems Engineering;2001-02
4 XU Ze shui 1,SUN Zai dong 2 (1. Institute of Sciences,PLA University of Science and Technology,Nanjing 210016,China; 2. College of Economics and Management,Southeast University,Nanjing 210096,China);A Method Based on Satisfactory Degree of Alternative for Uncertainly Multi-Attribution Decision-Making[J];Systems Engineering;2001-03
5 WU Huan qun,TANG Li,SUN Xiang jun,MO Lian guang (Changsha Communications University,Changsha 410076,China);A Study on Time Optimization of Alternate Construction Network[J];Systems Engineering;2001-04
6 SONG Guang xing,ZOU Ping (School of Management and Economy,Kunming University of Science and Technology,Kunming650093,China);The Method of Determining the Weight of the Decision-maker in Multi attribute Group Decision making[J];Systems Engineering;2001-04
7 LI Lin,LI Shu cheng,WANG Dao ping (School of Business Management,Hunan University,Changsha 410082,China);Based on Risk-Analysis' Estimating Method of Project's Duration[J];Systems Engineering;2001-05
8 CHEN Shou,YANG Kuan,WU Qi fang (College of Business Administration,Hunan University,Changsha 410082,China);Review of the Performance of Portfolio[J];Systems Engineering;2001-06
9 ZHU Shao-ying,XU Yu,HE Zheng-wen (School of management,Xi’an Jiaotong University,Xi’an 710049,China);A Study on Multi-Objective Decision Model and Algorithm for Risk Investment Based on Different Risk Preference[J];Systems Engineering;2003-03
10 An Zhong Zhu Shuo Li Zhuowei (Tianjin Institute of Technology, Tianjin 300191);Risk Analysis and Management of Engineering Projects[J];CHINA HARBOUR ENGINEERING;1999-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved