Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Harbin Institute of Technology》 2006-11
Add to Favorite Get Latest Update

Study of the combination of ant algorithm and quasi-Newton algorithm in computing mathematical model of water supply network

LI Yu-hua,FENG Yan,ZHANG Shi-ze,GUO Zhuang(School of Municipal and Environmental Engineering,Harbin Institute of Technology,Harbin 150090,China,)  
The hydraulic calculation of network can come down to compute simultaneous equations of continuity equation,energy equation and pressure equation.The Newton algorithm is a classic method used to solve nonlinear equations.But the equation may not be convergent when the choice of the initial number is unsuitable.In this paper,the new bionic algorithm——ant algorithm,is introduced in the network mathematical model.The new algorithm to solve water supply network mathematical model——graft algorithm is presented according to the strong complementarities between the Quasi——Newton algorithm and ant algorithm.As a result,the graft algorithm integrates the virtues of ant algorithm and Quasi——Newton algorithm,and exhibits quick speed and good effect.
【Fund】: 国家“十五”科技攻关资助项目(2002BA107B02)
【CateGory Index】: TU991.32
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 5 Hits
1 ZHANG Su bing, LIU Ze min (Telecommunication Engineering School, Beijing University of Posts and Telecommunications, Beijing 100876,China);A Novel Neural Network Method in ATM Traffic Control[J];Journal of Beijing University of Posts and Telecommunications;2001-02
2 LI Yu-hua, WANG Zheng School of Municipal and Environmental Engineering, Harbin Institute of Technology, Harbin 150090, China;Using and researching of ant algorithm for forecasting daily water demand[J];Journal of Harbin Institute of Technology;2005-01
3 MA Liang (College of Management, University of Shanghai for Science and Technology, Shanghai 200093, China);Ant algorithm based function optimization[J];Control and Decision;2002-S1
4 Wei Ping,Xiong Wei-qing(Faculty of Information Science and Technology, Ningbo University 315211, China);Ant Colony Algorithm for General Function Optimization Problems[J];Journal of Ningbo University(Natural Science & Engineering Edition);2001-04
5 Ma LiangCollege of Management, Shanghai University of Science and Technology, 200093;A New Method for Global Optimization[J];Systems Engineering and Electronics;2000-09
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 XUE Tong-zhan,WAN Guo-ming(School of Civil Engineering,Hefei University of Technology,Hefei 230009,China);Bilinear time series model of urban demand dynamic forecasting[J];Journal of Anhui Institute of Architecture;2005-06
2 ZHENG Zhi-hong et al(Xi'an University of Technology,Xi'an,Shaanxi 710048);Research on Water Supply System of Xi'an Based on Macroscopic Model[J];Journal of Anhui Agricultural Sciences;2007-33
3 XU Hai-dong~(1,2), LI Ye-wen~1, JIANG Feng~2, SONG Jun-de~2(1.Center of Network Management, China Mobile Communication Corporation, Beijing 100032, China;2.School of Electronic Engineering, Beijing University of Posts and Telecommunications, Beijing 100876, China);3G UTRAN Quality Evaluation Based on Neural Network[J];Journal of Beijing University of Posts and Telecommunications;2005-04
4 YANG Han-yi,WU Yu-hua(School of Management Tianjin University,Tianjin 300072);A Study and Application of Combination Forecast Model in Waste Production[J];Journal of Beijing Institute of Technology(Social Sciences Edition);2009-02
5 Xiao Yan;Study of Establishment of Hydraulic Model of Water Supply Pipe Network in Weifang City and Its Application[J];Public Utilites;2005-06
6 Zhang Zhiming;Leakage Control of Water Supply Pipeline by District Metering Area Technique[J];Public Utilities;2006-04
7 Tao Jianke;Elementary Talk about Model Establishment of Water Supply Pipeline System[J];Public Utilities;2008-02
8 ZHOU Yan-an,HE Jun (Electronic Engineering Institute of PLA,Hefei 230037,China);On radar jamming task assignment based on ant colony algorithm[J];Electronics Optics & Control;2007-06
9 LI Lei, LI Tong (School of Municipal &Environmental Engineering, Harbin Institute of Technology, Harbin 150090,China; Economic & Management College, Harbin University of Science and Technology, Harbin 150040,China; Institute of Systems Engineering, Dalian University of Technology,Dalian 116023,China);An algorithm for the global optimization of bilevel multi-objective programming problems[J];Electric Machines and Control;2005-05
10 ZHANG Li-li~1,LIANG Hong-jie~2,GUO Fu-sheng~3 (1.Shenyang University,Shenyang 110044,China;2.Shenyang Guohua Tendering Co.,Ltd.,Shenyang 110031,China;3.Dalian Corp.,China Construction Eight Division Group,Liaoning Dalian 116000,China);OPTIMAL ALLOCATION OF WATER SUPPLY FOR ARCHITECTURE BASED ON THE WATER-SAVING[J];Low Temperature Architecture Technology;2006-03
China Proceedings of conference Full-text Database 2 Hits
1 REN Wei-jian~1 CHEN Jian-ling~1 HAN Dong~2 WANG Feng-yu~3 1.Daqing Petroleum Institute,Faculty of Electric and Information Engineering,Daqing 163318,China; 2.Tengfei Construction Project Ltd,CNPC Daqing Petroleum Founders Corporation,Daqing 163000,China; 3.Fuel Enginery Power Plant,CNPC Daqing Petroleum Power Corporation,Daqing 163000,China.;Survey of ant colony algorithm[A];[C];2007
2 Pan Yongxiang Yang Rui (Xi'an University of Technology, Xi'an P.R.China 710048);Hybrid Adaptive Ant System Algorithm[A];[C];2004
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 ZHANG Su bing, LIU Ze min (Telecommunication Engineering School, Beijing University of Posts and Telecommunications, Beijing 100876,China);A Novel Neural Network Method in ATM Traffic Control[J];Journal of Beijing University of Posts and Telecommunications;2001-02
2 YAO Jun-feng,MEI Chi,PENG Xiao-qi,HU Zhi-kun,HU Jun (Institute on Simulation and Optimization of Pyro-installation,Central South Universuty,Changsha410083,China);A New Optimization Approach-Chaos Genetic Algorithm[J];Systems Engineering;2001-01
3 QIU Mo-jie, MA Liang (College of Management, University of Shanghai for Science and Technology, Shanghai 200093, China);Ant algorithm for constrained location problem[J];Journal of University of Shanghai For Science and Technology;2000-03
4 Ma Liang (College of Systems Science and Systems Engineering,University of Shanghai for Science and Technology, Shanghai 200093);Hybrid heuristic algorithm for the TSP and its extended problems[J];JOURNAL OF UNIVERSITY OF SHANGHAI FOR SCIENCE AND TECHNOLOGY;1999-01
5 XU Hong-fu,YUANYi-xing,ZHAOHong-bin (Schoolof Municipal&EnvironmentalEngineering,Harbin Instituteof Technology,Harbin150090,China);Use of gray model GM(1,1) for forecasting annual water demand[J];Journal of Harbin University of Civil Engineering and Architecture;2001-04
6 MA Liang, XIANG Pei Jun College of Management, University of Shanghai for Science and Technology, Shanghai 200093, China;Applications of the ant algorithm to combinatorial optimization[J];Journal of Manegement Sciences In China;2001-02
7 MA Liang (College of Management, University of Shanghai for Science and Technology, Shanghai 200093);Ant Colony Optimization for Bottleneck TSP[J];Computer Engineering;2001-09
8 MA Liang, WANG Long-de (College of Management, University of Shanghai for Science and Technology, Shanghai 200093, China);ANT OPTIMIZATION ALGORITHM FOR KNAPSACK PROBLEM[J];Computer Applications;2001-08
9 Lu Mou et al;COMBINED DYNAMIC ALGORITHM OF DAILY URBAN WATER CONSUMPTION[J];WATER & WASTEWATER ENGINEERING;1997-11
10 ZHANG Jihui (Control & Simulation Center, Northeastern University · Shenyang, 110006, P.R.China) GAO Qisheng (Department of Computer, Qingdao Institute of Chemical Technology· Qingdao, 266042, P.R.China) XU Xinhe (Control & Simulation Center, North;A Self-Adaptive Ant Colony Algorithm[J];CONTROL THEORY & APPLICATIONS;2000-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved