Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Hefei University of Technology(Natural Science)》 2007-06
Add to Favorite Get Latest Update

Study of the production planning and scheduling system based on the MAS

WANG Jing-hua1,XU Juan1,2,WU Zong-yan1,ZHANG Li2(1.School of Computer and Information,Heifei University of Technology,Hefei 230009,China;2.School of Machinery and Automobile Engineering,Hefei University of Technology,Hefei 230009,China)  
The production planning and scheduling problem is the core problem in manufacturing enterprises.In view of the characteristics of make-to-order production planning and scheduling for small and medium-sized enterprises,a multi-agent based production planning and scheduling model is put forward in this paper.The running mode of the production planning and scheduling system is analyzed,the application framework of the multi-agent system(MAS) and the implementation method of the agents in the system are discussed,thereby the unfeasible problem of production planning is solved.
【Fund】: 安徽省自然科学基金资助项目(070416250)
【CateGory Index】: TP399
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 Han Feng,Zhang Zhen-ming,Tian Xi-tian,Huang Li-jiang(Institute of CAPP & Manufacturing Engineering Software,Northwestern Polytechnical University,Xi'an 710072,CHN);Production task management model based on Holon and Agent[J];Modern Manufacturing Engineering;2008-05
【Citations】
Chinese Journal Full-text Database 4 Hits
1 Zhao Yanhong 1 Yin Zhaolin 21 (Information College,Nanjing University of Technology,Nanjing210009) 2 (Department of Computer Science and Technology,China University of Mining and Technology,Xuzhou221008);The Design and Implementation of Agent Database Integration[J];Computer Engineering and Applications;2003-02
2 YUAN Hong-bing, LI Xiao-ning, DONG Zhi-lin (School of Manufacturing Engineering, Nanjing University of Science&Technology, Nanjing 210094,China);Application and Research of Agent Technology in the Job-Shop Scheduling Problem[J];Computer Integrated Manufacturing Systems;2001-05
3 XIE Gui-liang, SI Shu-bin, SUN Shu-dong (Institute of System Integration and Engineering Management, Northwestern Polytechnical University, Xi′an 710072);On Hierarchical Production Planning and Scheduling Based on Agent Technology[J];Mechanical Science and Technology;2003-04
4 LING Xing-hong,DING Qiu-lin,WU Bei-ni (Computer Application Institute, Nanjing University of Aeronautics & Astronautics, Nanjing 210016);Negotiation-based Multi-Agent System for Production Planning and Scheduling[J];Mechanical Science and Technology;2004-02
China Proceedings of conference Full-text Database 1 Hits
1 Han Songqiao Zhao Ji Wang Maohua (Jilin University);STUDY ON THE AGILE SHOP-FLOOR CONTROL SYSTEM BASED ON MULTI-AGENT[A];[C];2000
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Wang Yong1,2 Xiong Qianxing21(School of Management,Wuhan University of Science and Technology,Wuhan 430081)2(School of Computer Science and Technology,Wuhan University of Technology,Wuhan 430064);Multi-Issues and Parallel Genetic Negotiating Model Based on Agent[J];Computer Engineering and Applications;2006-24
2 WANG Jun-qiang,SUN Shu-dong,SI Shu-bin,CHU Wei,YU Xiao-yi(Sch.of Mechatronic Eng.,Northwestern Polytechnical Univ.,Xi'an 710072,China);Research & implementation of workshop production management based on component and integration[J];Computer Integrated Manufacturing Systems;2006-02
3 ZHAO Yan-hong~1,CHEN Fa-ming~2 (1.College of Information Science & Engineering,Nanjing University of Technology,Nanjing Jiangsu 210009,China;2.College of Urban Construction and Safety & Environmental Engineering,Nanjing University of Technology,Nanjing Jiangsu 210009,China);Design of Agent-based Virtual Enterprise Architecture[J];Application Research of Computers;2004-03
4 XIE Gui-liang, SI Shu-bin, SUN Shu-dong (Institute of System Integration and Engineering Management, Northwestern Polytechnical University, Xi′an 710072);On Hierarchical Production Planning and Scheduling Based on Agent Technology[J];Mechanical Science and Technology;2003-04
5 FAN Lu-qiao1 , CHANG Hui-you2 , ZHU Xu-dong3(1. The Software Engineering Dept. of Guangdong Technology Insitute of Science and Technology, Zhuhai 519090 China;2.School of Information Science and Technology, Sun Yaf-sen University, Guanzhou 510275 China;3.Zhangjiang Ocean University, Zhanjiang 524005 China);An Overview of Scheduling Problem[J];Modern Computer;2004-05
6 ZHAO Ji(Jilin University,Changchun,China)HAN Songqiao WANG Maohua p 1756 1759;Research on Agent-based Workshop Resource Scheduling System under Agile Manufacturing Environment[J];China Mechanical Engineering;2002-20
7 Yang Hong'an Sun Shudong Xu Yaping Si ShubinNorthwestern Polytechnical University,Xi'an,710072;Research and Implement of Reconfigurable Shop Floor Management System[J];China Mechanical Engineering;2006-17
8 ZHANG Zhiying TANG Chengtong ZHANG Jianmin SUN Liansheng WANG Xinyong;Study of manufacturing execution system based on multi-agent architecture[J];Modular Machine Tool & Automatic Manufacturing Technique;2002-07
9 ZHANG Lia,XU Juana,ZHANG Jian-Juna,WU Zong-Yanb,WANG Jin-Huab(a.School of Mechanical and Automotive Engineering of Hefei University of Technology;b.The Computer & Information College,HeFei University of Technology,Hefei 230009,China);The Integration Research of Production Planning and Scheduling in MID-BOT Hierarchy Based on MAS[J];Modular Machine Tool & Automatic Manufacturing Technique;2007-03
10 LI Bin1, LIN Fei- long2 (1.Xiaoshan College, Zhejiang University of Broadcasting & TV, Hangzhou 311201; 2.School of City Management, Zhejiang University, Hangzhou 311000, China);On Modeling, Analysis and Optimization of Multi-item, Multi-technical Shop Management[J];Logistics Technology;2009-08
China Proceedings of conference Full-text Database 1 Hits
1 CHEN Yong WANG Xiao LIN Feilong (College of Mechanical & Electrical Engineering,Zhejiang University of Technology,Hangzhou 310032,China);Research of logistics scheduling of multi-variety and multi-technology shop based on multi-agent[A];[C];2008
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 ZHANG Kang,SU Chun,XU Ying-qiu (Department of Mechanical Engineering,Southeast University,Nanjing 210096,China);Research on Production Planning and Controlling Model for Cellular Manufacturing[J];Group Technology & Production Modernization;2006-01
2 YANG Hong hong,Wu Zhi ming,Wang Xiao qian (Institute of Automation,Shanghai Jiaotong University,Shanghai 200030,China);The Research on GA Approach to Capacitated Lot Sizing Planning Problem[J];Systems Engineering;2001-06
3 HAO Yan hui,HAO Yong jing,WANG Mo,ZHANG Xue min (Management School of Hebei University of Technology,Tianjin 300130,China);Comparing and Integrating Between MRPⅡ and JIT[J];INDUSTRIAL ENGINEERING JOURNAL;2000-03
4 CHEN Jian-hua~1, PENG Hong-guang~2 (1.School of Management, Huazhong University of Science and Technology, Wuhan 430074, China; 2.Dept. of Economics and Management, Zhejiang University of Science and Technology, Hangzhou 310012, China);Integrated Production Planning and Controlling Model of MRPⅡ, JIT and TOC in Time-based Competition[J];Industrial Engineering Journal;2005-02
5 ;Management Mechanism of Supply Chain ——Production Planning and Control[J];INDUSTRIAL ENGINEERING AND MANAGEMANT;2000-02
6 CHENG Jie,SONG Fu-gen,ZHAO Xiao-zhen(Glorious Sun School of Business & Management,Donghua University,Shanghai 200051,China);Shortcoming Analysis and Improvement for Production Planning and Control in MRPⅡ[J];Industrial Engineering and Management;2006-04
7 Dai Qingyu Luo Tianyou (Guangdong University of Technology, Guangzhou 510090, Guangdong; Huaiji Auto -accessories Mfg. , Inc. Ltd, Huaiji 526400, Guangdong);Produce Pursuing and Management System Based on RFID[J];Computer & Telecommunication;2006-07
8 ;Development Status of Flexible Circuit Boards[J];Aviation Precision Manufacturing Technology;1990-05
9 ;Collaborative Manufacturing-Oriented WIP Tracking and Management System[J];Aeronautical Manufacturing Technology;2006-08
10 SHUAI Qi,CHEN Yao-jun,YANG Ying(College of Mechanical & Electrical Engineering,Guangdong Institute of Science and Technology,Zhuhai 519090,China);Review on the status about modeling and optimization of agile manufacturing cell[J];Mechanical & Electrical Engineering Magazine;2008-05
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 Huang Haijun\ Xu Gang (Beijing University of Aeronautics and Astronautics,School of Management);Scheduling Model and Resource Pricing in Multi Stage Manufacturing Systems[J];JOURNAL OF BEIJING UNIVERSITY OF AERONAUTICS AND ASTRONAUTICS;1998-05
2 Chen Yuan Wu Xiao-bing;Research of Strategies for Dynamic Task Allocation and Scheduling[J];;1999-01
3 Duan Liming Chen Jin (Department of Mechanical Engineering Ⅰ,Chongqing University);The Algorithms of Constraint—Based Job Shop Scheduling[J];JOURNAL OF CHONGQING UNIVERSITY(NATURAL SCIENCE EDITION);1998-01
4 Peng Guan Chen Tongjian Ouyang Huifang (Department of Mechatronic Engineering, South China Univ. of Tech.);DECISION MAKING FOR FMS DYNAMIC SCHEDULING BASED ON NEURAL NETWORKS[J];JOURNAL OF SOUTH CHINA UNIVERSITY OF TECHNOLOGY(NATURAL SCIENCE);1998-06
5 Rao Yunqing Doctoral Candidate; College of Mech. Sci. & Eng., HUST, Wuhan 430074, China. Zhao Tianqi Tong Guofan Li Peigen;An Object Oriented Unified Model for FMS Simulation, Scheduling and Control[J];JOURNAL OF HUAZHONG UNIVERSITY OF SCIENCE AND TECHNOLOGY;1997-09
6 WANG Yan-hong, YIN Chao-wan, ZHANG Yu (Shenyang Institute of Automation, C.A.S. Shenyang 110015,China);Multi-Agent and Rule Based Dynamic Scheduling System for Agile Manufacturing Job Shop[J];COMPUTER INTEGRATED MANUFACTURING SYSTEMS;2000-04
7 YUAN Hong-bing, LI Xiao-ning, DONG Zhi-lin (School of Manufacturing Engineering, Nanjing University of Science&Technology, Nanjing 210094,China);Application and Research of Agent Technology in the Job-Shop Scheduling Problem[J];Computer Integrated Manufacturing Systems;2001-05
8 Liao Qiang Zhou Kai (Tsinghua University ,100084);Multi agent Based Scheduling Simulation System for FMS[J];COMPUTER SIMULATION;1998-04
9 Xu Yuefei et al;Contents in brief Intelligent Dynamic Scheduling in Advanced Manufacturing System[J];;1998-02
10 LI Sa,WANG Yun li, DUAN Guang hong, WANG Jun ying (Tsinghua Uinversity, Beijing 100084);A Shop Scheduling System Based on Multi agent Architecture[J];MECHANICAL SCIENCE AND TECHNOLOGY;2000-06
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved