Research on Risk-sharing Principle of International EPC Project

LOU Hai-jun  
From a point of international gengeral contract project risk management ,combined with the FIDIC’s conditions of contract for EPC / turnkey project,the international EPC / turnkey project parties’ risk-sharing mechanisms and principles are discussed.According to contract pricing mode,field data,design responsibility,unforeseen difficulties and owner’s risks,the new risk-sharing principles of EPC project are summarized that based on the research of traditional risk-sharing principles,namely,the principle of owners’ fault without duty and the principle of contractors’ unlimited risk duty.In the EPC project engineering practice,the contractor should attach great importance to special risk-sharing mechanism and risk costs of EPC project,establish a correct risk attitude,and take attention to the response of major risk factors.
【CateGory Index】: F284
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Zhang Shuibo (School of Management of Tianjin University, Tianjin 300072);A New Contract Mode of International Project——EPC Contract[J];CHINA HARBOUR ENGINEERING;1999-04
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 ZHANG Hua,LIU Ying-zong (School of Management,Tianjin University,Tianjin 300092,China);On the Dynamic Forecast of Engineering Projects' Cash Flow[J];Journal of Chongqing Jiaotong University(Social Sciences Edition);2006-03
2 Yang Minglong;Brief Talk about Project Change and Its Working Program[J];Urban Roads Bridges & Flood Control;2006-01
3 ZHANG Li-jin(Jinzhong Electric Power Bureau,Jinzhong,Shanxi030600,China);Quoted Price and Counterclaimer-Two Important Strategies of Dealing with Effect of Entering WTO and System Reformation for Electric Power Construction Corporations[J];Shanxi Electric Power;2003-S2
4 Yu Su-ping;Claim to the Mode of the General Contracting for Constructional Engineering[J];Fujian Construction Science & Technology;2004-02
5 Shi Min-shan;Discussion on the contract condition under the platform of the valuation with Bill of Quantities[J];Fujian Construction Science & Technology;2007-01
6 Chen Shi Zhong (Zhangzhou City Comp Rehensiue Deuelop Co.Ltd Zhangzhou,Fujian 363000,China);FIDIC conditions of the construction contract change control works[J];Fujian Architecture & Construction;2007-02
7 XIE Dong-sheng,LIU Er-lie(School of Management, Tianjin University, Tianjin 300072, China);The Analysis of Force Majeure Clause in the Conditions of Contract Published by FIDIC in 1999[J];Port Engineering Technology;2004-02
8 WAMG Gao-peng,ZHANG Yun-biao,SHI Jian-hu(Guangdong Provincial Changda Highway Engineering Co.,Ltd Guang Zhou 510620,China);On early-stage management and key control of overseas project[J];Guangdong Highway Communications;2008-01
9 Ding Xiao-xin,Su hui(School of Management,Jilin Architectural and Civil Engineering Institute,Changchun 130021);Legal Charater of the Project Advanced Payment[J];Journal of Jilin Architectural and Civil Engineering Institute;2006-02
10 CHEN Jun (Department of Construction Engineering, Jiangxi Blue Sky University, Nanchang, 330029,China);Comparative Analysis of Project Contract and Project Management[J];Journal of Jiangxi Blue Sky University;2007-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved