Risk control in engineering procurement construction contracting

YAN Rui-ming(Shenyang Railway Survey and Design Institute Ltd.,Shenyang 110013,China)  
On the analysis of risk reasons and circumvention measures in each stage of engineering procurement construction contracting(EPC),the effective control methods for risk in contracting were proposed in two aspects,including reasonable allocation of the managers and improvement of management system and operation mechanism in each stage,making clear that the identification of engineering risk responsibility is an effective means for decreasing the risk loss,such as joint hearing system and dynamic management for contract and design,intervene in key points in design stage for procurement and construction sector,joint hearing of plans and working drawings,sunshine procurement in procurement stage,expert system in construction period,and accountability system for identifying the responsibilities in the accidents.
【CateGory Index】: F284
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 WU Heng-jie (International Business School, Hehai University);The risk analysis and resolving of construction contract[J];Construction Management Modernization;2000-04
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Zhang Chong (Anhui Construction Engineering Group, Hefei 230001, China);Use of BT Contractual Arrangement in Construction Project[J];Anhui Architecture;2009-03
2 ZHANG Xi-rong(Wuhan Univeristy of Science and Technology,Wuhan 430070,China);International Contract Power Construction Project Risk Analysis[J];Electric Power Construction;2009-06
3 ZHANG Jie(CIPPREC,Beijing 100089,China);Study on Dust Emission Control on the Construction Sites[J];Construction & Design for Project;2006-02
4 DING Tao(Beijing Electronic Science Technology Training College, Beijing China 100176);Practice and Thoughts on Construction Contract Management[J];Construction Quality;2009-08
5 Gao Hong Li Ke(China Jinye Engineering Co.,Ltd.,Beijing 100088,China);THE EPC GENERAL CONTRACT MANAGEMENT PRACTICE OF BAYUQUAN PROJECT OF STEEL SLAG HEAT-STUFFING TREATMENT UNDER ANSHAN IRON AND STEEL COMPANY[J];Environmental Engineering;2009-02
6 YANG Ying1,WANG Xiaowu2(1.Beijing University of Civil Engineering and Architecture,100044,Beijing,China;2.Beijing Institute of Architectural Design,100045,Beijing,China);ANALYSE ABOUT ENGINEERING CONTRACTION IN ENTERPRISE OF ARCHITECTURAL DESIGN[J];Architecture Technology;2009-06
7 ZHANG Shi- lian PAN Cheng- shi;Research on Safety Design and Construction Safety on Engineering Project Design Stage[J];Construction Economy;2006-01
8 WANG Rulun, WANG Daopeng;Implementation and Control of the World's First 200,000 Tons Copper Synthesis Furnace Project[J];Construction Economy;2007-12
9 WANG Zeng-yu;On management of the general contract for construction project[J];Shanxi Architecture;2009-35
10 LIU Ke-fei(Shenyang Aluminum and Magnesium Engineering and Research Institute,Shenyang 110001,China);Thinking over the engineering in the management to EPC project[J];Light Metals;2008-08
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved