Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Chongqing Jianzhu University》 2002-02
Add to Favorite Get Latest Update

Inspection and Monitoring of Prestressed Anchoring System

SHI Nan xiang (Guizhou Design and Research Institute of Architecture, Guiyang 550003, China)  
Through concrete project examples, the technological methods and means for inspecting and monitoring the quality of the prestressed anchoring system in geotechnical engineering were expounded. The concrete inspection data have provided reliable evidence for evaluating qualities of geotechnical engineering.
【CateGory Index】: U416.1
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 LUO Bin1,TANG Shuming1,CHENG Xiaohui2,Guo Hongxian2;Techniques of Reverse Drawing Detection for of Prestress under Anchor[J];Technology of Highway and Transport;2012-01
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 Ye Xiaomin;Calculation of Soil Pressure on Column-panel Structure Type Retaining Wall[J];UNDERGROUND SPACE;1999-02
2 ZHANG Jinmin et al;Experimental Study on Soil Stress of Holding Sheet for Supporting System of Pile[J];Underground Space;2002-01
3 XU Ming et al.;Forecast of Bolt Bearing Capacity Using Gray System[J];Underground Space;2003-04
4 GAO Yongtao, ZHANG Youpa, WU Shunchuan Civil and Environmental Engineering School, University of Science and Technology Beijing, Beijing 100083, China;Mechanism Analysis of Anti-sliding Piles in Soil Slope[J];Journal of University of Science and Technology Beijing;2003-02
5 WANG Qing ping (The Three Gorges Project Command of Hydropower Troop of Armed Police, YIchag 4N43124);Some Technological Problems in Blasting Excavation for Permaent Shiplock of Three Gorges Project[J];BLASTING;2000-S1
6 LU Xia ling (China Conservancy and Hydropower Scientific Academy);Influence of Rock High Slope Explosive Excavation on Anchored Installations[J];BLASTING;2000-S1
7 PAN Jian ping, HUANG Run qiu, XU Qiang (Chengdu University of Technology, China);RESEARCH ON THREE-DIMENSION SIMULATION OF OPENPIT MINE TAILING DAM SLOPE STABILITY IN PANZHIHUA[J];Journal of Chengdu University of Technology;2002-03
8 Liu Baoyiu(Institute of Railway Construction of Academy of Ministry of Railway);Calibration Methods for Soil-pressure Sensors[J];Journal of Transducer Technology;1990-03
9 LI Duan you, TANG Ping, LI Yi ming (Yangtze River Scientific Research Institute, Wuhan 430010,China);Safety monitoring of rock anchor prestress during 1st stage construction of TGP's permanent lock[J];JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTITUTE;2000-01
10 YING Xiang dong (Yangtze River Scientific Research Institute, Wuhan 430010,China);Monitoring and analysis of deep-lying displacement of Huanglashi landslide[J];JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTITUTE;2000-02
【Secondary References】
Chinese Journal Full-text Database 2 Hits
1 Liu Xiaochun,Zhang Jintao;Distribution Rule of Soil Pressure at Back of Column Plate Anchor Retaining Wall[J];Urban Roads Bridges & Flood Control;2012-01
2 TANG Ren-hua CHEN Chang-fu(Institute of Geotechnical Engineering,Hunan University,Changsha 410082,China);An analysis of reliability of anchor retaining wall based on unified strength theory[J];Hydrogeology & Engineering Geology;2011-04
China Proceedings of conference Full-text Database 1 Hits
1 LUO Xingwen,YAO Hailin,YANG Mingliang (State key laboratory Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics,Chinese Academy of Sciences Wuhan,Hubei 430071,China);CALCULATION METHOD AND CONSTRUCTION CONTROL OF ANCHOR PILE PLATE WALL IN HIGH SUBGRADE[A];[C];2010
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved