Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《On Economic Problems》 2012-01
Add to Favorite Get Latest Update

Research on Evaluation of M&A Financing Risk in the Preliminary Planning Stage for Listed Company

XIAO Zhen-hong,SUN Feng-ling (School of Economic and Management,Harbin Engineering University,Harbin 150001,China)  
With the combination of AHP、GEM and Fuzzy synthesis evaluation method,this paper constructed the evaluation system and evaluation model of MA financial risk in the preliminary planning stage for listed company,and given an example that selection of a listed company MA financing project,then introduced the apply of evaluation system and evaluation model been constructed in the field of MA financing risk evaluation.Finally,the paper supplied the theoretical basis for selection of MA financing project and control of MA financing risk.
【Fund】: 黑龙江自然科学基金项目“黑龙江省国有企业并购融资管理研究”(G201026);; 黑龙江博士后基金项目“企业并购过程中的财务风险控制研究”(LBH-Z08222)
【CateGory Index】: F224;F276.6;F832.51
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 3 Hits
1 TANG Wen-bin1,2,ZHANG Fei-lian1 (1.School of Civil Engineering and Architecture,Central South University,Changsha 410075;2.School of Economy and Management,Changsha University of Science and Technology,Changsha 410114,China);The Risk of Evaluation Methodology of Urban Rail Transit Investment and Financing[J];Systems Engineering;2011-01
2 Tian Delu; Lu Fengjun (College of Management Engineering,CAU);Factor Analysis of Risk Management[J];JOURNAL OF CHINA AGRICULTURAL UNIVERSITY;1998-06
3 FAN Xiao-jun,WANG Fang-hua,ZHONG Gen-yuan (Aetna School of Management, Shanghai Jiaotong Univ., Shanghai 200052, China);A Dynamic Fuzzy Evaluation Method of Project Financing Risk on Large Scale Infrastructure[J];Journal of Shanghai Jiaotong University;2004-03
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 SHANG Yan-qi et al(Liaoning Water Conservancy Economic Ration Station,Shenyang,Liaoning 110003);Research on Financing Risk and Risk-controlling Method of Water-transporting Project[J];Journal of Anhui Agricultural Sciences;2006-05
2 LI Chao-hui,ZHANG Xiao-wei,LI Dai-song College of Economics and Management,Beijing University of Technology,Beijing 100124,China;Enterprise Trust Degree Appraisal Based on Risk Management of the Technical Project[J];Journal of Beijing University of Technology(Social Sciences Edition);2010-06
3 XIE Jian-an1 ZENG Shun-peng2 YONG Qi-dong1 (1.University of Logistical Engineering, PLA, Chongqing 400016; 2.Chongqing University of Science and Technology,Chongqing 400042);Safe Management of Oil Deposit Based on Risk Concept[J];;2005-01
4 SONG Jie-kun,ZHANG Xiao-hui, ZHANG Zai-xu(China University of Petroleum,Dongying 257061,China);The Method of Fuzzy Comprehensive Evaluation on Technologic Innovative Ability of Oil Field Enterprise[J];Contemporary Economy & Management;2007-03
5 XU Xue-rong, LIN Shao-wei (College of Economics and Management, Fujian Agriculture and Forestry University, Fuzhou, Fujian 350002,China);An early warning system of the risk of Fujian annual yield of grain per hectare built by Markov forecasting method[J];Journal of Fujian Agriculture and Forestry University (philosophy and Science);2005-01
6 Chen Shouke Wei Zhuobin(1.Navy Engineering University,Tianjin 300450,China;2.Civil Engineering Department,Tianjin University,Tianjin 300072,China);Research on Financing Risk and Its Control in Large-scale Public Project[J];Engineering Sciences;2007-12
7 Gao Qi-xun1,Quan Cong-na2,Li Bo3,Ma Li1(1.School of Economics and Management,Yanshan University,Qinhuangdao 066004,China;2.Agricultural University of Hebei,Baoding 071000,China;3.Beijing University of Aeronautics and Astronautics,Beijing 100083,China);Financing Risk Assessment of Power Plant Construction by Using Grey Fuzzy CIM Model[J];Industrial Engineering Journal;2010-04
8 HE Jian(State Key Laboratory of Water Resources and HydropowerEngineering Science,Wuhan University,Wuhan 430072,China);Hydropower project financing risk appraisal model based on multi-level dynamic fuzzy assessment[J];Guangxi Water Resources & Hydropower Engineering;2008-02
9 TANG Wen-bin1,2,ZHANG Fei-lian1,LI Jing-jing1,3(1.School of Civil Engineering,Central South University,Changsha 410075,China; 2.School of Economy and Management,Changsha University of Science and Technology,Changsha 410004,China; 3.School of Traffic and Transportation Engineering,Changsha University of Science and Technology,Changsha 410004,China);Research on risk evaluation in inter-city railway construction project based on fuzzy analytic network process[J];Journal of Railway Science and Engineering;2011-04
10 Zhou Jun;How To Keep Away from Project Risk[J];Hunan Agricultural Machinery;2007-07
China Proceedings of conference Full-text Database 1 Hits
1 HU Dong-bin1,XU Li-hua1(School of Business,Central South University,Changsha 410018,China);Dynamic Risk Assessment of Overseas Mining Investment Projects Based on Multi-dimensional Text Categorization[A];[C];2011
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 Wang Haisheng,He Dehong,Huang YuxiangFirst-author′s address College of Economic & Management,Tongji Univ., 200092,Shanghai,China;Risk Analysis of Urban Mass Transit Investment PPP Mode[J];Urban Mass Transit;2005-03
2 Xie Weidong,He WenChina Development Bank,100037,Beijing,China;PPP Pattern Financing in Urban Mass Transit Realm of China[J];Urban Mass Transit;2006-03
3 LI Jinghua LI Qiming;Economic Risk Factor Analysis of Urban Rail Transport under PPP—Taking Beijing Metro Line 4 as an- Example[J];Construction Economy;2007-10
4 XIE Lei,WANG Shu,DONG Jianjun;Economic Risks and Evading Countermeasures of Urban Rail Transit under PPP Financing Mode[J];Construction Economy;2008-10
5 Zhang Ran & Zhang Huili;Economic Consequences of the Change on Consolidated Financial Statement Theory in the New Accounting Standards[J];Accounting Research;2008-12
6 Tian Delu; Lu Fengjun (College of Management Engineering,CAU);Factor Analysis of Risk Management[J];JOURNAL OF CHINA AGRICULTURAL UNIVERSITY;1998-06
7 WANG Yue,BAI Shuo,CHEN Li-na(College of Economy and Management,Southwest Agricultural University,Beibei Chongqing 400716,China);PROBLEMS EXISTING IN THE "COMPANY + FARMER HOUSEHOLD" PATTERN IN MILK INDUSTRY AND MEASURES FOR THEIR SOLUTION[J];Journal of Sichuan Institute of Animal Husbandry and Veterinary Medicine;2005-03
8 ZHOU Hong-bo~(1,2)(1.Shanghai Research Institute of Building Sciences,Shanghai 200032,China;2.Shanghai Jianke Project Management Co.,Ltd.,Shanghai 200032,China);Risk Assessment of Deep Foundation Pit by Using Fuzzy Comprehensive Evaluation Method Based on Bayesian Networks[J];Journal of Shanghai Jiaotong University;2009-09
9 FANG Jie(Department of Economy and Trade,Chengdu University of Information and Engineering Technology,Chengdu 610103,China);Agriculture Circular Economy:a Necessary Choice for Building Agricultural Ecological Civilization[J];Journal of Southwest University(Social Sciences Edition);2008-06
10 QIU Dao-chi FENG Ling-ling SHI Yong-ming ZHAO Ya-ping School of Geographical Sciences,Southwest University,Chongqing 400715,China;Exploration on Rural Land Shifting and Scale Management in Chongqing[J];Journal of Southwest China Normal University(Natural Science Edition);2008-05
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved