《Optimization of Capital Construction》 2004-01
Add to Favorite Get Latest Update

The Whole Course Control on Cost of Construction Project

QIU Xun-bing~(1,2),WANG Xiao-hong~1 (1.The Civil Engineering College of South center University,Changsha,410083,China; 2.The 2nd Engineering Company of China Zhongtie Major Bridge Engineering Group Co.,Ltd;Nanjing 210015)  
This paper points out some problems on the cost control of the present domestic projects, and respectively introduces the measures that should be adopted at the different stages of project for cost control.