Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Optimization of Capital Construction》 2004-02
Add to Favorite Get Latest Update

Establishing Earned Value Management System Assembly Managing Project Time and Cost

YAN Yong-zhen,BAI Ming (College of Econ. and Man., Liaoning University of Petro-chemical and Technology,Fushun,113001, China)  
Earned Value Management is a efficient method of the contemporary project management,this paper expounds the superiority of Earned Value Management on project time and cost,through the comparison between traditional single factor deflection analysis and the Earned Value Management, and point out the preliminary assumption of establishing Earned Value Management system in China.
【CateGory Index】: F2753
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 9 Hits
1 SHI Ming-xi1,JIANG Li2,WANG Xi-ping1(1.Department of Economy and Management,North China Electric Power University,Baoding Hebei 071003,China; 2.Economic Consulting Research Center of Liaoning Electric Power Company,Shenyang 110015,China);The Research of Cost and Schedule Management Based on the Analysis of Multi-level Earned Value[J];Science Technology and Industry;2011-11
2 WANG Junmin LIAO Liangcai ZHANG Kunlun (School of Information System and Management,National University of Defense Technology,Changsha, 410073);Research on Progress Management of Railway Construction Project[J];Journal of Industrial Engineering and Engineering Management;2005-S1
3 Ji Ge-di1,2,Chang Qing2,WEN Zong-chuang2(1.Shcool of Business and Administration,North China Electric Power University,Beijing 102206,China;2.School of Management,Inner Mongolia University of Technology,Huhehaote 010051,China);A Study on Earned Value Method for Uncertain Parameters in Project Integration Control[J];East China Economic Management;2011-05
4 LI Rui,LIU Yu-jun,ZHANG Fan(Department of Naval Architecture,Dalian University of Technology,Dalian 116024,China);A performance evaluation in shipbuilding based on earned value theory[J];Journal of Harbin Engineering University;2009-03
5 Yang Xiaoping;Han Jinwei(School of Management,University of Science and Technology of China,Hefei 230026,China);To Study on Dynamic Analying and Prediction of Earned Value Management[J];Value Engineering;2009-07
6 WANG Zhenjun;Schedule Management Practice of Project PhaseⅡof Pudong International Airport Based on P3 Project Management Software[J];Construction Economy;2007-07
7 TIAN Hua-fei;The application of earned value method in process monitoring of highway construction items[J];Shanxi Architecture;2010-21
8 CHEN Jing-wu,YUAN Peng-wu(Hebei University of Technology,Tianjin\ 300401,China);Study on Integrated Management Model of Construction Project Objective[J];Construction Technology;2008-02
9 ZHANG Li,JI Shengliang,HOU Wei,TANG Junyong(Xi'an Institute of Technical,Xi'an 710032,China);Application Research of Earned Value Measure in Project Progress Control Management[J];Journal of Shenyang University;2006-01
China Proceedings of conference Full-text Database 2 Hits
1 CUI Dong-hong, TIAN Yue Management Institute,Shenyang University of Technology,Shenyang 110023,China.;Research and development on the robust control system of project three targets[A];[C];2005
2 CUI Dong-hong, ZHAO Hong, MENG Na (Management Institute, Shenyang University of Technology, Shenyang 110023, China.;The Research and Development of Large Project Integration Control System Basing on TOC[A];[C];2006
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Qi Anbang;On the Multi-factors Integration Management Method for Project Management[J];Nankai Business Review;2002-06
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 ZHAO Hui,WANG Xue-qing(School of Management,Tianjin University,Tianjin 300072);Information System Construction of Compositive Project Management[J];Journal of Beijing Institute of Technology(Social Sciences Edition);2008-06
2 WU Xiao-hong(Civil Engineering Department of Tangshan College,Hebei Tangshan 063000,China);A research on integrated management in large-scale topographic mapping[J];Science of Surveying and Mapping;2011-03
3 ZHANG Xiao-fang (Henan University of Urban Construction,Pingdingshan 467036,China);Contrastive analysis of Chinese and foreign construction contract management[J];Journal of Henan University of Urban Construction;2011-06
4 LI Rui*1,2,LIU Yu-jun1,2,ZHANG Fan1,2,WANG Ji1,2,DENG Yan-ping1,21.State Key Laboratory of Structural Analysis for Industrial Equipment, Dalian University of Technology,Dalian 116024,China;2.Department of Naval Architecture,Dalian University of Technology,Dalian 116024,China;Research on project cost performance evaluation method using earned value of risk[J];Journal of Dalian University of Technology;2011-02
5 CHEN Xi,XU Rong,XU Wei,WANG Xu-feng(College of Civil Engineering,Tongji University,Shanghai 200092,China);STUDY ON ORGANIZATION DESIGN IN LIFE-CYCLE MANAGEMENT OF EXPO VILLAGE PROJECT[J];Low Temperature Architecture Technology;2010-09
6 GUO Shi-hong,HU Zhi-yuan,LIU Pei-feng(Xi'an University of Architecture and Technology,Xi'an,Shaanxi 710055,China);Quality Earned Value Method Based on Delghi Method[J];Journal of Water Resources and Architectural Engineering;2011-02
7 LU Ning,FENG Yangping,WANG Fang,ZHOU Xuan,WANG Wei(College of Architectural,Chang’an University,Xi’an 710061,China);Quality earned value for integrated management[J];Journal of Liaoning Technical University(Natural Science);2009-01
8 GAO Ming~1,CHEN Yong-qiang~1,QIAO Yue~2(1.School of Management,Tianjin University,Tianjin 300072;2.CCC First Harbor Consultants Co.,Ltd.,Tianjin 300222,China);Analysis of Time-cost-quality Trade-off in Engineering Project Management[J];Port Engineering Technology;2007-01
9 GAO Peng1,FENG Jun-wen1,WANG Hua-ting2(1.School of Economics and Management,Nanjing University of Science & Technology,Nanjing 210094,China;2.The State Key Laboratory of Intelligent Technology and System,Tsinghua University,Beijing 100084,China);Method for Scheduling Forecasting with Time-based Earned Value Technology[J];Systems Engineering;2009-12
10 ZHANG Lian-ying,LUAN Yan,ZOU Xu-qing(School of Management,Tianjin University,Tianjin 300072,China);Time-cost-quality Trade-off Optimization Model of Construction Project[J];Systems Engineering;2012-03
China Proceedings of conference Full-text Database 1 Hits
1 XU Yuan1, QI Anbang2 , ZHANG Jie2 (1. Tianjin Chengtou Constructing Ltd.) (2. Project Management Research center of Nankai University);The research on the Total Element Integration Management Method of the Government Investment Project Constructing Agent Enterprise[A];[C];2008
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 WANG Yueming~1,LIN Qunxian~2,WU Fang~3(1.Southwest University of Science and Technology,Mianyang 621010,China;2.Zhejiang College of Industrial Technology,Shaoxing 312000,China;3.Southwest University of Science and Technology,Mianyang 621010,China);The dynamic state control method of the price on the construction engineering construction stage——The application of the win-value principle and the MATLAB software[J];Sichuan Building Science;2006-05
2 HOU Yong-gang,YANG Cun-jie,LI Ping (Institute of Industrial Process Control,Zhejiang University, Hangzhou 310027,China);Application for network optimization technique in intelligent process mangement system[J];Journal of Anhui University(Natural Sciences);2001-04
3 Xia Guang(Anhui Engineering Consulting Institute,Hefei 230001);PROBING INTO THE METHOD OF THE MANAGEMENT IN ALL PROCESS OF A PROJECT[J];Journal of Anhui Institute of Architecture;2002-01
4 CHENG Fen-fen(Department of Management Engineering, Anhui Institute of Architecture & Industry, Hefei 230022, China);The control of construction Item cost[J];Journal of Anhui Institute of Architecture;2005-04
5 Chen Huali (Anhui Nanfeng Jiahe Properties Development Co,Ltd,Chaohu 238000,China);Effective Control of Building Cost in Management of Building Project[J];Anhui Architecture;2007-04
6 Wu Huili(Anhui Xingye Engineering Consulting Co.,Ltd,Hefei 230001,China);On Bidder′s Bid Price Offering and Project Cost Management under Price in Bill of Quantities[J];Anhui Architecture;2007-05
7 JI Liang zhong (Capital Construction Office,AHUT,Ma'anshan 243002,Anhui,China);On the Control of Capital Construction Project Cost[J];Journal of Anhui University of Technology(Sociel Sciences);2004-04
8 WANG Wei-min(Tianchang Water and Electricity Engineering Construction and Installation Company,Tianchang 239300,China);Quality cost control of construction company[J];Journal of Anhui Technical College of Water Resources and Hydroelectric Power;2005-03
9 GUO Jing_juan (School of Economics and Management,Northern Jiaotong University, Beijing 100044, China);Comparative Analysis of Management System on Construction Cost between China and Advanced Countries[J];Journal of Northern Jiaotong University(Social Sciences Edition);2003-01
10 ZHANG Lai-wang (Industry Trade Company of Baotou Steel (Group) Corporation, Baotou 014010, China);Cost forecast and control of project management of construction[J];Science & Technology of Baotou Steel(Group) Corporation;2002-04
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 Peng Jun;Strengthening the Water Conservancy Project Cost Management and Effective Measures[J];Beijing Agriculture;2011-12
2 Ge Qi-ju;Application of EVC in Cost and Schedule Control of the Engineering Project[J];Chongqing Architecture;2008-10
3 LI Chenyang 1,LV Fucai 2,LI Xiaodan 3 (1.Research Station on Civil Engineering for Postdoctoral Fellows,Harbin Institute of Technology,Harbin 150001,China;2.Water Authority of Muling,Muling Heilongjiang 157500,China;3.College of Water Conservancy and Civil Engineering,Northeast Agricultural University,Harbin 150030,China);Economic study on sewage treatment engineering based on LCC[J];Journal of Northeast Agricultural University;2011-05
4 ;Brief analysis of schedule control methods of large and complex projects based on general schedule plan[J];Fujian Building Materials;2008-06
5 GUO Shu-hua,ZHA Jing-min,ZHUANG Zeng(School of Management and Economics,Tianjin University,Tianjin 300072,China);Application of Earned Value Concept in Port and Waterway Engineering with Quality Factor under Consideration[J];China Harbour Engineering;2011-04
6 Gao Guangjun,Dai Tian;The Application of EVM in the Process of Large and Medium-sized Development Project[J];Journal of Hebei University of Economics and Business(Comprehensive Edition);2011-02
7 MI Yu1,2,HE Bo3,HAO Jing4,WANG Hong-wei1(1.Telecommunication Engineering College,Air Force University of Engineering,Xi'an 710038,China,2.Martial Deputyof PLA on Factory,Xi'an 710043,China,3.The Maintenance Depot of the Air Craft Center,Xi'an 710077,China,4.The Chinese People's Liberation Army of 934277,Shenyang 110000,China);Application of Earned Value Management in Material Life Cycle Cost Control[J];Fire Control & Command Control;2011-10
8 MA Rong,XU Li,ZHAO Shuang (Economic & Management School,Wuhan University,Wuhan 430072,China);Discuss on the Progress Forecast of Projects based on Earned Value Method[J];Technology Economics;2007-09
9 Liu Jinglin; Lv Zhenfei;Su Xiang (School of Economics and Management,Jiangsu University of Science and Technology,Zhenjiang 212003,China);To Study on the Improveing of Earned Value Method Based on Contractors[J];Value Engineering;2009-10
10 FANG Zhi-liang CHEN Xiang-dong;The earned value analysis in project schedule based on critical path[J];Shanxi Architecture;2008-06
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved