The Application of Earned Value Method in Project Investment and Schedule Control

ZHOU Yan,CUI Xin-yuan(Department of Management,Chongqing Jiaotong University,Chongqing 400074)  
As a method of modern project management,earned value method plays important role in project investment/schedule management.This paper introduces the basic concept and specific theory,and systematically demonstrates the basic work and operation step of this method in project investment/schedule comprehensive control,finally combined with project practical case discusses the application of earned value method in project investment/schedule comprehensive control.
【CateGory Index】: F283
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Qi Anbang;On the Multi-factors Integration Management Method for Project Management[J];Nankai Business Review;2002-06
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 WANG Yueming~1,LIN Qunxian~2,WU Fang~3(1.Southwest University of Science and Technology,Mianyang 621010,China;2.Zhejiang College of Industrial Technology,Shaoxing 312000,China;3.Southwest University of Science and Technology,Mianyang 621010,China);The dynamic state control method of the price on the construction engineering construction stage——The application of the win-value principle and the MATLAB software[J];Sichuan Building Science;2006-05
2 Deng Mingjun Luo Wenbing(The University of Science and Technology of Hunan, Xiangtan, Hunan 411201);Research on the Basic Theory of Integrated Cost Management[J];Communication of Finance and Accounting(Academy Version);2006-05
3 Gan Hongmei;My Opinion of Cost Control of Building Construction Enterprises[J];Urban Roads Bridges & Flood Control;2006-02
4 Lou Jing,Liu Chen,Wang Hui et al.;Approach to Cost Control of Construction Project[J];Urban Roads Bridges & Flood Control;2006-02
5 FU Hong-yuan,HUANG Chuang-bin,ZHAO Lang(College of Construction Management and Real Estate,Chongqing University,Chongqing 400030,China);Quality Earned Value Method Based on Quality Evaluation[J];Journal of Chongqing University(Natural Science Edition);2007-03
6 LI Chun-yang1;ZHOU Guo-hua ;LI Chun-guang(1.School of Economic and Management Southwest Jiaotong University,Chengdu 610031,Chian; 2.Key lab of Geomechanics,Chinese Academy of Science ,Wuhan 430071,China);Synthesis on development of fuzzy network planning technique[J];Construction & Design for Project;2004-02
7 LIU Qing;Application of Program Evaluation Review Technique on Project Management of Enginering[J];Construction & Design for Project;2005-02
8 CHENG Yan-jia,SUN Tao(Nanjing university of aeronautics and astronautics,Nanjing 210016,China);The Research of Integrated Control to Project Cost and Progress Base on Earned Value Theory[J];Construction & Design for Project;2006-12
9 ZHAO Dao-zhi, LIAO Hua (Management School, Tianjin University, Tianjin 300072, China);Some Misunderstandings on Critical Chain Method[J];Industrial Engineering Journal;2005-02
10 GUO Zhen-ning(School of Mechanic & Electronic Engineering Soochow University,Suzhou 215005,China);Study on Acceleration of the Construction Time for Engineering Network Plan[J];Industrial Engineering Journal;2007-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved