Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Computer Integrated Manufacturing Systems》 2001-01
Add to Favorite Get Latest Update

A Class of Job Shop Scheduling Based on the Evolutionary Algorithm

HE Ting1,LIU Wen-huang1,LIANG Li-ping2 (1.Dept. of Automation,Tsinghua University, Beijing 100084, China; 2.Fenghua Advanced Technology Group Ltd. Co., Zhaoqing 526020, China)  
At first, a new Hybrid evolutionary algorithm has been proposed based on analyzing several typical search algorithms. Finally some practical examples of simulation results show that the algorithm has good validity and potential to practical application.
【CateGory Index】: TH166
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 4 Hits
1 YANG Jingsong, LIU Zhe, CUI Guangcai (School of Computer Science and Technology, Changchun University of Science and Technology);The Method of Job-shop Planning and Scheduling Based On a Hybrid Genetic Algorithm[J];Journal of Changchun Institute of Optics and Fine Mechanics;2003-03
2 WANG Jie-nan(Department of Electronic Engineering, Ezhou University, Ezhou, Hubei 436000, China);The Genetic Algorithm Which Mixes Flow Shop Dispatcher's Question is Asked and Solved[J];Journal of Ezhou University;2005-03
3 YANG Xing-lin 1,2 , YANG Ai-min 2 (1.College of Mechanical and Electrical Engineering, Nanjing University of Aeronautics & Astronautics, Nanjing, 210016,China; 2.Department of Mechanical Engineering, East China Shopbuild Institute, Zhenjian g,212003);Application of Genetic Algorithm Based on Gene Expression to Workpiece for JSSP[J];Journal of Nanjing University of Aeronautics & Astronautics;2004-01
4 DUAN Ya-nan, HE Ting, CHU Bin-sheng (Department of Computer Science and Engineering, Harbin Institute of Technology, Harbin 150006, China);Solution of job shop problem based on self-adaptive heuristic algorithm[J];Computer Engineering and Design;2004-07
【Citations】
Chinese Journal Full-text Database 3 Hits
1 Wang Ling,Zheng Dazhong(Tsinghua University);The Comparetive Research on Several Sub-optimization Methods to Solve TSP Problem[J];Control and Decision;1998-01
2 Gu Qingming, Cao Lijuan, Song Wenzhong (Southeast Uniersity);Adaptive Genetic Algorithm of Solving Job-shop Scheduling Problem[J];CONTROL AND DECISION;1998-05
3 LIU Min, WU Cheng, JIANG Xinsong Department of Automation, Tsinghua University, Beijing 100084, China;Application of evolutionary programming method in identical parallel machine scheduling problem[J];JOURNAL OF TSINGHUA UNIVERSITY(SCIENCE AND TECHNOLOGY);1998-08
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 YANG Jingsong, LIU Zhe, CUI Guangcai (School of Computer Science and Technology, Changchun University of Science and Technology);The Method of Job-shop Planning and Scheduling Based On a Hybrid Genetic Algorithm[J];Journal of Changchun Institute of Optics and Fine Mechanics;2003-03
2 Liu Min,Wu Cheng (Department of Automation,Tsinghua University,Beijing 100084);Application of Evolutionary Programming Method in Parallel\=Machine Scheduling Problem of Minimizing the Number of Tardy Jobs[J];ACTA ELECTRONICA SINICA;1999-07
3 WANG Jie-nan(Department of Electronic Engineering, Ezhou University, Ezhou, Hubei 436000, China);The Genetic Algorithm Which Mixes Flow Shop Dispatcher's Question is Asked and Solved[J];Journal of Ezhou University;2005-03
4 LIN Keng, HUANG Yuan-shi (Department of mathematics, Fuzhou University, Fuzhou, Fujian 350002, China);A model of the schedule for MPS in ERP based on adopting adaptive genetic algorithms[J];Journal of Fuzhou University(Natural Sciences Edtion);2002-04
5 ZHAO Bo, LIU Xiao bing, WANG Qian (CIMS Center of Dalian University of Technology,Dalian 116023,China);Research of Application of Evolutionary Computation for Production Scheduling[J];INDUSTRIAL ENGINEERING JOURNAL;1999-02
6 CHEN Wei-da, DA Qing-li (College of Economics and Management, Southeast University,Nanjing 210096,China);The Study of Job-Shop Scheduling with Alterable Craft for Minimizing the Earliness and Tardiness Penalties[J];Journal of Industrial Engineering and Engineering Management;2003-01
7 Zou Yan-biao Zhang Tie Chen Wei-hua(School of Mechanical and Automotive Engineering,South China University of Technology,Guangzhou 510640,Guangdong,China);Motion Planning and Path Optimization of Manipulator for Holes Machining[J];Journal of South China University of Technology(Natural Science Edition);2010-08
8 XIONG Yan (Science College, Anshan University of Science and Technology, Anshan ,Liaoning 114002,China);Actuality and Developmental Trend of the Evolutionary Programming[J];Journal of Heze Teachers College;2003-04
9 ZHAO Jie,LIU Zhanqiang,ZHOU Jun(School of Mechanical Engineering,Shandong University,Ji'nan 250061,China);Improved Genetic Algorithm for Solving Job-Shop Scheduling Problem[J];Machine Tool & Hydraulics;2007-01
10 Wang Ling Zhang Liang Zheng Dazhong(Dept.of Automation,Tsinghua University,Beijing100084);Generalized TSP-Type Traffic Model and Optimization[J];Computer Engineering and Applications;2002-02
China Proceedings of conference Full-text Database 3 Hits
1 HUANG Zhi-hui KAN Shu-lin;Research on Auto Electronic Parts Production' Planning & Scheduling Optimal[A];[C];2007
2 Jin Bingyao Department of Computer Science, Zhejiang Normal University, Jinhua 321004 Wei Chengjian He Zhenya Department of Radio Engineering, Southeast University, Nanjing 210096;A Genetics and Local Search Based Probability Learning Algorithm[A];[C];1999
3 Zeng Jianchao Xu Yubin Wang Honggang Taiyuan Heavy Machinery Institute,030024;An Excellent Scheme Self-Learning Genetic Algorithm for Job-shop Scheduling Problems[A];[C];1999
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 LI Qi 1,LIANG Bin 2,WANG Rui_zhi 3,LIU Hong-yan 4 (1.School of Electronic and Information Engineering,Anshan Institute of I.& S.Technology,Anshan 114002,China; 2.Lingshan Machinery Factory,Angang Group Mahinery Manufacture Company,Anshan 114002,Chin;A Reverse Algorithm of Job-Shop Scheduling Problem Subject to Sequence Constraints[J];Journal of Anshan Institute of Iron and Steel Technology;2001-06
2 LI Ying na, LI Jian yong,LI Zhi hui (College of Mechanical, Electronic and Control Engineering, Northern Jiaotong University, Beijing 100044,China);Research on the Robust Facility Layout Design of Flexible Manufacturing System[J];Journal of Northern Jiaotong University;2001-04
3 Liu Zhihong; Ma Yunfu (No.58 Research Institute of China Ordnance Industries Mianyang 62 1000);Application of WJMS Based On OPT In SAFMS[J];ORDNACE INDUSTRY AUTOMATION;2000-01
4 CHEN Hao, CHEN Tie-ying (Dept. of Automatic Control, Huazhong University of Science and Technology, Wuhan 430074, China);Solving Scheduling Problem of Flexible Job in Shop by Genetic Algorithm[J];Ordnance Industry Automation;2004-04
5 Zhou Hong Cai Miaofeng\ Feng Yuncheng (Beijing University of Aeronautics and Astronautics,School of Management);KIND OF GENETIC ALGORITHM FOR SOLVING FlOW SHOP SEQUENCING PROBLEMS[J];JOURNAL OF BEIJING UNIVERSITY OF AERONAUTICS AND ASTRONAUTICS;1997-04
6 Han Limin\ Huang Hongxuan\ Feng Yuncheng (Beijing University of Aeronautics and Astronautics,School of Management);Job Shop Scheduling by Simulated Annealing Algorithm Combined with Tabu Search[J];JOURNAL OF BEIJING UNIVERSITY OF AERONAUTICS AND ASTRONAUTICS;1998-01
7 CUI Guangcai 1, TAO Lihua 2, YANG Jingsong 1(1.College of Electronics and Information Engineering of Changchun University of Science and Technology; 2.Changchun FMS Lab of National Defence Science and Technology);The Method of FMS of Planning and Scheduling Based on a Hybrid Genetic Algorithm[J];Journal of Changchun Institute of Optics and Fine Mechanics;2002-02
8 JIA Yan\|hui,YANG Zhi\|gang,WANG Xiu\|lun,SUN Li ( Dept. of Mechanical Engineering,Dalian Railway Institute,Dalian 116028, China);The Web-based Process Knowledge Service and Management System[J];Group Technology & Production Modernization;2002-04
9 YU Yong\|hai, ZHANG Zheng\|xiang(Xi'an Jiaotong University, Xi'an 710049,China);Supply Chain Management Based Multi-periodic Cooperative Inventory Control Model and Simulation[J];Group Technology & Production Modernization;2003-01
10 PENG Zhi gang,WU Guang yu,YANG Yan li,XU Xin he (School of Information Science and Engineering, Northeastern University, Shenyang 110006,China);Hybriding Genetic Algotithms With Tabu Search for the Continuous Casting Planning[J];JOURNAL OF NORTHEASTERN UNIVERSITY;2000-03
China Proceedings of conference Full-text Database 1 Hits
1 LI Gui-fen, JU Yan-bing (School of Management and Economics, Beijing Institute of Technology, Beijing 100081,China.;Method of JSP Optimization Based on Simulation and GA[A];[C];2006
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 YIN Yong1,2,ZHOU Zude1,LIU Quan1,LONG Yihong1(1.School of Information Engineering,Wuhan University of Technology,Wuhan Hubei 430070,China; 2.State Key Laboratory for Manufacturing Systems Engineering,Xi'an Jiaotong University, Xi'an Shaanxi 710000,China);Resource Node Selection in Manufacturing Grid Based on Complex Network Theory[J];Machine Tool & Hydraulics;2011-15
2 Liang Hao Chen Xiai Liu Bin Chen Jinjie;Study on the Model of Mass Customization Oriented Supply Chain Plan[J];Mechanical Management and Development;2006-06
3 CHEN Xue-feng , JI Wei-xi (School of Mechanical Engineering, Southern Yangtze University, Wuxi 214122,China);A realize of genetic algorithm applied to job shop scheduling[J];Machinery Design & Manufacture;2007-04
4 LIU Hong-jun,ZHAO Shuai;Study on job-shop scheduling based on hybrid genetic algorithm[J];Manufacturing Automation;2011-17
5 LI Wen-fei,GUO Shun-sheng(School of Mechanical and Electronic Engineering in Wuhan University of Technology.Wuhan430070,China; Hubei Digital Manufacturing Key Laboratory,Wuhan430070,China);Study and Application of the Design and Management System of the Digital Workshop Layout[J];Mechanical & Electrical Engineering Technology;2007-10
6 FANG Hui,LUO Yang (College of Manufacturing Sci.and Eng.,Sichuan Univ.,Chengdu 610065,China);A model for optimizing large scale blank nesting plan based on distributed parallel genetic algorithm[J];Machinery;2002-05
7 Liu Mingzhou Wu Junfeng Guo Jia Chen Chenghe (Hefei University of Technology);Study on Matching Method of Mechanical Products with Multi-parameters Based on Genetic Algorithm[J];Transactions of the Chinese Society for Agricultural Machinery;2006-01
8 JIANG Guisong,SU Dan,FU Xinyue,LI Bing School of Information Technology & Management,University of International Business and Economics,Beijing 100029,China;Research for non-identical parallel machine schedule problem based on ant colony algorithm[J];Computer Engineering and Applications;2012-29
9 CHAO Yi-fei(China Guodian Corporation Education and Training Center of Jianbi Power Plant,Zhenjiang 212006,China);Particle Swarm Optimization Applied into Equipment Manufacturing Industry[J];Value Engineering;2012-30
10 LIU Jun,CHEN Rui-sheng,WANG Ye-nan(School of Mechanical & Electronical,Lanzhou University of Technology,Gansu Lanzhou 730000,China);Large Scale Workshop Scheduling Problem Optimization Method Research and Simulation[J];Computer Simulation;2013-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved