Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Computer Integrated Manufacturing Systems》 2005-10
Add to Favorite Get Latest Update

Research on sequential preventive maintenance policy in finite time horizon

XI Li-feng~1,ZHOU Xiao-jun~1,LEE Jay~2(1.Sch.of Mechanical Eng.,Shanghai Jiaotong Univ.,Shanghai 200030,China;2.Univ.of Wisconsin,Milwaukee WI 53211,Wisconsin,USA)  
System reliability was always neglected by Equal interval Preventive Maintenance(PM) models,meanwhile long-time expected interval PM models usually couldn't satisfy the system maintenance need in a finite time horizon.From this perspective,a sequential imperfect PM model was proposed with the consideration of optimized maintenance schedule in a finite time horizon.A hybrid hazard rate recursion rule was developed based on the concept of age reduction factor and hazard rate increase factor to predict the evolution of the system reliability in different maintenance phases.The optimized PM schedule was deduced by minimizing the maintenance cost in the finite time horizon with the assumption that the mean cost per unit time for PM was a function of the reliability threshold R and the improvement factors.Simulation results showed that this reliability centered PM model made a decrease of the PM interval and it could provide maintenance decision support for job shop scheduling.
【Fund】: 国家863/CIMS主题资助项目(2003AA414120);; 国家自然科学基金资助项目(50128504)~~
【CateGory Index】: TH17;
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 2 Hits
1 ZHOU Xiao-jun~1,SHEN Wei-bing~(1,2),XI Li-feng~1,LEE Jay~3(1.School of Mechanical Eng.,Shanghai Jiaotong Univ.,Shanghai 200240,China;2.Sewerage Management Office of Shanghai,Shanghai 200231,China;3.School of Eng.,Univ.of Cincinnati,Cincinnati OH 45221-0072,Ohio,USA);A Dynamic Opportunistic Preventive Maintenance Model for a Multi-unit Series System with Consideration of Imperfect Maintenance Effect[J];Journal of Shanghai Jiaotong University;2007-05
2 CHEN Qi1,2,ZHAO Tao1(1.School of Management,Tianjin University,Tianjin 300072,China;2.Tianjin University of Commerce,Tianjin 300134,China);Study On Optimization Model for Equipment Maintenances[J];Modular Machine Tool & Automatic Manufacturing Technique;2008-05
【Citations】
Chinese Journal Full-text Database 1 Hits
1 HAN Bang -jun , FAN Xiu - min, MADeng - zhe, J IN Ye (CIM Institute, Shanghai Jiaotong Univ. , Shanghai 200030, China);Optimization of Equipment Preventive Maintenance Cycle in Production System Based on Genetic Algorithm[J];Computer Integrated Manufacturing Systems;2003-03
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 WU Qiong(Electric Power College, South China Univ. of Technology, Guangzhou 510640, China);Optimized model for maintenance scheduling of electric equipments[J];Guangdong Electric Power;2004-05
2 WANG Xian-lin,ZHANG Hua(College of Machinery and Automation,Wuhan University of Science and Technology,Wuhan 430081,China);Availability-model for electromechanical equipment based on Markov process[J];Mechanical & Electrical Engineering Magazine;2008-06
3 HAN Bang-jun, FAN Xiu-min, MA Deng-zhe (CIM Inst., Shanghai Jiaotong Univ., Shanghai200030, China);Optimization of preventive maintenance policy of manufacturing equipment based on simulation[J];Computer Integrated Manufacturing Systems;2004-07
4 WANG Zheng-yuan,CHEN Zhi-xiong,CAO Ji-ping,SONG Jian-she (Teaching & Research Section of Mathematics & Military Operations,The Second Artillery Institute,Xi'an 710025,China);Optimal solution to condition-based maintenance strategy of single parts[J];Computer Integrated Manufacturing Systems;2008-01
5 L Wen-yuan1,ZHENG Rui2,ZHANG Le1(1.School of Management,University of Shanghai for Science & Technology,Shanghai 200093,China;2.School of Public Economy and Management,Shanghai University of Finance & Economics,Shanghai 200433,China);Comparative research on delay-time-based models in case of non-homogeneous defect arrival rate[J];Computer Integrated Manufacturing Systems;2008-08
6 WANG Ling-zhi,XU Yu-gong,ZHANG Jia-dong(School of Mechanical,Electronic & Control Engineering,Beijing Jiaotong University,Beijing 100044,China);Optimization of reliability-centered preventive maintenance for multi-component systems[J];Computer Integrated Manufacturing Systems;2008-10
7 LI Hong,QIAN Seng-san(School of Management,University of Shanghai for Science &Technology,Shanghai 200093,China);Research on calculating the rational preventive maintenance interval period of equipment[J];Machinery Design & Manufacture;2006-09
8 NI Ai-wei1,WENG Gang2,WU Ke-qin1,XIE Li-yang1(School of Mechanical Engineering and Automation,Northeast University,Shenyang 110004,China;2.Liaoyang Branch Company of China Petroleum and Natural Gas Joint-stock Company Ltd.,Shenyang 111003,China);Determining the adaptable conditions for the mathematical model of optimal maintenance interval period in RCM II[J];Journal of Machine Design;2007-02
9 WANG Zhengyuan ZHU Yu SONG Jianshe LIU Wei (Xi’an Hi-Technology Institute, Xi’an 710025);Optimal Method on Dynamic Maintenance Task Scheduling[J];Chinese Journal of Mechanical Engineering;2008-01
10 WANG Lingzhi XU Yugong ZHANG Jiadong(School of Mechanical,Electronic and Control Engineering,Beijing Jiaotong University,Beijing 100044);Preventive Maintenance Economic Optimization Model Based on Equipment Availability and Reliability[J];Journal of Mechanical Engineering;2010-04
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 ZHANG Jian-qiang, ZHANG Tao, GUO Bo (System Engineering Institute, National University of Defence Technology, Changsha 410073, China);Research on Multi-Leveled Simulation Model of Maintenance Support Process Based on Petri Net[J];Ordnance Industry Automation;2003-04
2 Xiao Gang (Second Artillery Engineering College);A MONTE CARLO METHOD FOR OBTAINING RELIABILITY AND AVAILABILITY CONFIDENCE LIMITS OF COMPLEX MAINTENANCE SYSTEM[J];Acta Armamentarii;2002-02
3 Zhao Tingdi Tian Jin(Dept.of System Engineering of Engineering Technology,Beijing University of Aeronautics and Astronautics,Beijing 100083,China);Integrated flexible reliability and fault diagnosis design technique[J];Journal of Beijing University of Aeronautics and Astronautics;2006-10
4 QIAN Cai-fu1 JIANG Zhong-jun1 SHEN Jun1 MENG Zou-qing1 ZHANG Huan-xiu2 ZHAO Xiao-bin2 (1.College of Mechanical and Electrical Engineering, Beijing University of Chemical Technology, Beijing 100029, China; 2. Jilin Chemical Industry Co., Ltd., Jilin Jinlin 132022, China);Rational stock of spare parts for a large continuous operation plant[J];Journal of Beijing University of Chemical Technology;2005-04
5 GAO Shi-ze (College of Mathematics and Computer Science,Chongqing Normal University , Chongqing 400047,China);Analysis of Time Series of Transmission of SARS[J];Journal of Chongqing Teachers College(Natural Science Edition);2004-03
6 LU Ji-hua, PAN De-hui (School of Business Administration, Northeastern University, Shenyang 110004, China. Correspondent: LU Ji-hua, E-mail: jihual @ sohu.com);Dynamic Bargain Design for Virtual Enterprise Dealing in Consulting Service[J];JOURNAL OF NORTHEASTERN UNIVERSITY;2004-05
7 JI Shou-feng,DU Xiao-lu,HUANG Xiao-yuan (School of Business Administration,Northeastern University,Shenyang 110004,China.);Emergency Replenishment Model and Analysis of Distribution Systems in Collaborative Commerce[J];Journal of Northeastern University(Natural Science);2007-05
8 Dong Yan Sun Hexu (Hebei Institute of Technology);Reliability-centered State Supervision and Fault Diagnosis System of Rolling Mill Electrical Devices[J];Electrotechnical Journal;2001-10
9 Xu Yunzhi (China University of Mining &Technology );Decision-Making and Support Systemfor Transformer Electrical Equipments Based on State Maintenance[J];Electrotechnical Journal;2005-09
10 MENG Ke,ZHANG Heng-xi,DUAN Jing-wei,GUO Feng(Engineering college,Air Force Engineering University,Xi'an 710038,China);Qualitative estimation method of equipment life cycle cost based on unascertained number theory[J];Electronics Optics & Control;2005-06
【Secondary References】
Chinese Journal Full-text Database 3 Hits
1 HOU Wen-rui,JIANG Zu-hua,JIN Yu-lan(School of Mechanical Engineering,Shanghai Jiaotong University,Shanghai 200240,China);Reliability-Based Opportunistic Preventive Maintenance Model of Multi-units Serial-Parallel System[J];Journal of Shanghai Jiaotong University;2009-04
2 XIA Tang-bin,ZHOU Xiao-jun,XI Li-feng(School of Mechanical Engineering,Shanghai Jiaotong University,Shanghai 200240,China);Multi-attribute Model for Dynamic Preventive Maintenance Decision with Hybrid Evolution Factors[J];Journal of Shanghai Jiaotong University;2009-05
3 Liu Fanmao1,2 Zhu Haiping1 Shao Xinyu1 Rao Yunqing1 Gao Guibin11.State Key Laboratory of Digital Manufacturing Equipment & Technology,Huazhong University of Science & Technology,Wuhan,4300742.Hunan University of Science & Technology,Xiangtan,Hunan,411201;A Condition-based Opportunistic Maintenance Strategies for Multi-unit Series and Parallel System Based on Markov Chain[J];China Mechanical Engineering;2009-07
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved