Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Computer Applications》 2007-03
Add to Favorite Get Latest Update

Design of μC/OS-II multitask period based on rate monotonic scheduling algorithm

SHI Wei-ren, OU Guo-jian(College of Automation, Chongqing University, Chongqing 400044, China)  
When multitask is scheduled, the embedded real-time operation system μC/OS-II always runs the task that has highest priority in the ready table. This strategy may lead to that the task cannot be scheduled if the period of task is designed improperly. Depending on the rate monotonic (RM) scheduling algorithm, each task could be scheduled by the analysis of RM algorithm in the design of tasks period.
【Fund】: 重庆市科技攻关重点项目(CSTC2005BA2018)
【CateGory Index】: TP316
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 WANG Yong-Ji1+, CHEN Qiu-Ping1,2 1(Laboratory for Internet Software Technologies, Institute of Software, The Chinese Academy of Sciences, Beijing 100080, China) 2(Graduate School, The Chinese Academy of Sciences, Beijing 100039, China);On Schedulability Test of Rate Monotonic and Its Extendible Algorithms[J];Journal of Software;2004-06
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 WANG Juan,WU Xiu-wen,Zhang Zhong-shu(Dept.of Computer Science,CUIT,Chengdu 610225,China);Design of an integrated scheduling two-level scheme for real-time system[J];Journal of Chengdu University of Information Technology;2007-01
2 WANG Yan-gang1,PENG Dong-lin2,XU Jun2,LI Yan2 (1. Chongqing University,Chongqing 400044,China; 2. Chongqing Institute of Technology,Chongqing 400050,China);Applications of redundancy technique in signal processing circuit for incremental time grating displacement sensor[J];Electric Power Automation Equipment;2006-03
3 LI Ting1, WANG Hai-rui2, ZHANG Ji-yan1 (1.Faculty of Information Engineering and Automation, Kunming University of Science and Technology, Kunming 650051, China; 2. Faculty of Information Engineering and Automation, Kunming University of Science and Technology, Kunming 650051, China);The Level Scheduling Program of the Mixed Task[J];Computer Knowledge and Technology;2008-35
4 ZHAO Huai-jun, MA Peng, LIU Pu, FU Wei-ping (Northwestern Polytechnical University, Xi'an 710072, China; Xi'an University of Technology, Xi'an 710048, China; Xi'an High Voltage Apparatus Research Institute, Xi'an 710077, China);The Process Analysis of an Automatic Control System Based on RTOS and PLC for Delaying Arc Charge Circuit[J];High Voltage Apparatus;2006-01
5 WANG Tao,LIU Da-xin (College of Computer Science and Technology,Harbin Engineering University,Harbin 150001,China);Scheduling algorithm for AND/OR precedence constrained tasks based on solving the set-cover problem[J];Journal of Harbin Engineering University;2007-05
6 LIU Da-ming~(1,2) ZHAO Yan-ping~2 MAO Yu-zhou~2 WU Dong-sheng~2 (1.Shanghai University of Electric Power,Shanghai,200090;2.Institute of Plasma Physics,Chinese Academy of Sciences,Hefei 230031,China);Research and implementation of data acquisition and exchange system for ICRF in EAST based on embedded system[J];Nuclear Electronics & Detection Technology;2008-06
7 Hong Xue-yu Zhang Ling Yuan Hua(Information Network Engineering Research Center,South China University of Technology,Guangzhou 510640,Guangdong,China);Real-Time Scheduling Algorithm Based on Linux[J];Journal of South China University of Technology(Natural Science Edition);2008-04
8 ZHANG Hong-peng,CHEN Ming,XIE Shuan-qin,ZHAO Huai-jun,GONG Jian-ying(College of Automation,Northwestern Polytechnical University,Xi'an 710072,China);Analysis and Implementation of the ELMC's Software Real Time Scheduling[J];Measurement & Control Technology;2007-02
9 Xing Jiansheng~1,3, Liu Junxiang~1,3, and Wang Yongji~1,2~1(Laboratory for Internet Software Technologies, Institute of Software, Chinese Academy of Sciences, Beijing 100080)~2(Key Laboratory for Computer Science, Institute of Software, Chinese Academy of Sciences, Beijing 100080)~3(Graduate University, Chinese Academy of Sciences, Beijing 100049);Schedulability Test Performance Analysis of Rate Monotonic Algorithm and Its Extended Ones[J];Journal of Computer Research and Development;2005-11
10 CHEN Yin-li1,PENG Shi-li1,LIAO Chun-lan2 1.Guangdong University of Finance,Guangzhou 510520,China 2.Panyu Polytechnic,Guangzhou 511483,China;Priority inversion solution based on blocking scheduling[J];Computer Engineering and Applications;2007-22
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 LI Wei,DAI Sheng-hua(School of Electronics and Information Engineering,Beijing Jiaotong University,Beijing 100044,China);Testing and Analyzing the Real-Time Performance of Windows CE.NET[J];Journal of Northern Jiaotong University;2005-05
2 WANG Ji-yong,LIN Tao,WANG Jin-dong,HAN Guang-jie,ZHAO Hai (School of Information Science & Engineering,Northeastern University,Shenyang 110004,China);Research on Preemptions of Preemptive EDF and Improvement on Its Performance[J];Acta Electronica Sinica;2004-01
3 SHU Bing(Wuxi Sci-tech Vocational School,Wuxi 214028,China);New Electronic Clearers and the Performance Comparison thereof[J];Textile Accessories;2006-04
4 Duan Minxiang et al;Status Quo and Development Strategy of Industrial Control Computer[J];Industrial Contral Computer;2001-09
5 XING Yu-hong(Heilongjiang Yuanbao Textile Co.Ltd.,Shangzhi 150600);Yarn Quality Control by Use of its Monitoring of Electronic Yarn Cleaner[J];Heilongjiang Textile;2005-04
6 ;Today's Industrial Control Computers and Their Application Perspectives[J];MEASUREMENT & CONTROL TECHNOLOGY;1999-08
7 ;The Analysis of Windows CE's Real Time Performance[J];MEASUREMENT & CONTROL TECHNOLOGY;2000-01
8 REN Hong-Bo(Computer Science Institute,Zhejiang University,Hangzhou 310027);Communication Research and Reliability Testion for Emedded Software System[J];Computer Science;2007-03
9 JIANG Le-tian, XU Guo-zhi (Department of Electronics Engineering, Shanghai Jiaotong University, Shanghai 200030,China);Software Fault and Software Reliability[J];Computer Simulation;2004-02
10 LIU Zhong-shi, DAI Jin-hai, GUI Xian-zhou(College of Aerospace and Material Engineering, National Univ. of Defense Technology, Changsha Hunan 410073, China);Schedulability Analysis and Simulation for Rate-Monotonic Scheduling Algorithm[J];Computer Simulation;2006-03
【Secondary Citations】
Chinese Journal Full-text Database 2 Hits
1 ZOU Yong+, LI Ming-Shu, WANG Qing (Laboratory for Internet Software Technologies, Institute of Software, The Chinese Academy of Sciences, Beijing 100080, China);Analysis for Scheduling Theory and Approach of Open Real-Time System[J];Journal of Software;2003-01
2 JIN Hong+, WANG Hong-An, WANG Qiang, DAI Guo-Zhong (Human Computer Interaction and Intelligent Information Processing Laboratory, Institute of Software, The Chinese Academy of Sciences, Beijing 100080, China);An Integrated Design Method of Task Priority[J];Journal of Software;2003-03
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved