Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Tunnel Construction》 2013-02
Add to Favorite Get Latest Update

Analysis on Technical Difficulties in Construction of Yangtze River-crossing Tunnel on Weisan Road in Nanjing

ZHANG Shilong(CCCC Tunnel Engineering Company Limited,Beijing 100088,China)  
The difficulties in shield boring through complex sandy cobble ground with high permeability and high water pressure,including stability control of excavation face,filter membrane forming,wearing of cutter head and cutting tools and replacing of cutting tools under hyperbaric conditions,are analyzed.As a result,the topics to be studied,such as filter membrane forming in ground with high permeability,filter membrane forming mechanisms,stability of filter membrane and air tightness under hyperbaric conditions and cutting tool replacing under hyperbaric conditions,are presented.The paper can provide reference for the construction of extra-long river-crossing tunnels under high water pressure.
【CateGory Index】: U455.43
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 7 Hits
1 Chen Jian(China Railway 14th Bureau Group Co. Ltd., Jinan 250014);Integrated Technical Control of Tunneling with a Super-large Diameter Slurry Shield[J];Urban Rapid Rail Transit;2008-06
2 Zhang Gongshe(14th Bureau Group Co.,Ltd.,Railway Building Corporation of China,Jinan 250014,China);Study of Improving the Design of and Engineering Application of TBM Tools to the Nanjing Yangtze River Tunnel[J];Traffic Engineering and Technology for National Defence;2009-04
3 HONG Kai-rong (China Railway Tunnel Group Co.,Ltd.,Luoyang 471009,Henan,China);Analysis on Technical Difficulties of Super-long Underwater Shield-bored Tunnels with Large Cross-sections:Case Study on Shiziyang Tunnel on Guangzhou-Shenzhen-Hong Kong Passenger-dedicated Railway[J];Tunnel Construction;2007-06
4 SHI Xindong,WU Quanli(CCCC Tunnel Engineering Co.,Ltd.,Beijing 100088,China);Geological Conditions and Construction Countermeasures of Weisanlu River-crossing Shield-bored Tunnel in Nanjing[J];Tunnel Construction;2011-06
5 SUN Shanhui,CHEN Kui,WANG Zhufeng (State Key Laboratory of Shield Machine and Boring Technology,Zhengzhou 450003,China);Optimization of Large Diameter Slurry Shields:Aimed at Long-distance Tunneling[J];Tunnel Construction;2012-02
6 Xiao Mingqing (1 School of Civil Eng., Southwest Jiaotong University, Chengdu 610031; 2 China Railway Sichuan Survey and Design Group Co.,Ltd , Wuhan 430063);General Design of Nanjing Weisanlu Yangtze River Tunnel[J];Modern Tunnelling Technology;2009-05
7 HAN Xiao-rui1,ZHU Wei1,2,LIU Quan-wei3,ZHONG Xiao-chun4,MIN Fan-lu1(1.Research Institute of Geotechnical Engineering,Hohai University,Nanjing 210098,China;2.College of Environmental Science and Engineering,Hohai University,Nanjing 210098,China;3.Nanjing Yangtze River Tunnel Engineering Headquarters,China Railway Fourteenth Group Corporation,Nanjing 211800,China;4.College of Civil Engineering,Hohai University,Nanjing 210098,China);Influence of slurry property on filter-cake quality on working face of slurry shield[J];Rock and Soil Mechanics;2008-S1
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 HONG Kairong1,2,DU Chuangdong2,REN Chengguo2(1.School of Civil Engineering,Beijing Jiaotong University,Beijing 100044,China;2.China Railway Tunnel Group Co.,Ltd.,Luoyang 471009,Henan,China);Technology for simultaneous injection of rapid-setting grout in complex strata:case study on large-diameter slurry shield[J];Journal of Beijing Jiaotong University;2011-03
2 Yang Shujiang(China Railway Tunnel Stock Co.,Ltd.,Zhengzhou 450000);Adaptability of Slurry Shield to the Water-soaked Cobble Ground of Chengdu Metro[J];Urban Rapid Rail Transit;2009-05
3 Sun Mou,Tan Zhongsheng(Beijing Jiaotong University,Beijing 100044,China);Key technologic problems on underwater shield tunnel[J];Engineering Sciences;2009-07
4 Meng Haifeng,Su Qinggui,Zhai Zhiguo (Beijing Underground Diameter Project Department,China Railway Tunnel Group,Beijing 100045,China);Technology of strengthening soil and keeping pressure of large diameter slurry shield inside with high pressure[J];Engineering Sciences;2010-12
5 GAO Lin1,2,SHI Cheng-hua1,PENG Li-min1,3,LEI Ming-feng1,AN Yong-lin4(1.School of Civil Engineering,Central South University,Changsha 410075,China; 2.Hunan Urban Construction College,Department of Municipal and Road Bridge Engineering,Xiantan 411101,China; 3.National Engineering Laboratory of High-speed Railway Construction,Changsha 410075,China; 4.School of Civil Engineering,Hunan University of Science and Technology,Xiangtan 411201,China);Construction safety analysis on the Yingpan Road large-span tunnel under river[J];Journal of Railway Science and Engineering;2012-04
6 WEI Dai-wei1,ZHU Wei1,2,MIN Fan-lu1(1.Geotechnical Engineering Research Institute,Hohai University,Nanjing,Jiangsu 210098,China;2.National Engineering Research Center of Efficient Utilization and Engineering Safety of Water Resourses,Hohai University,Nanjing,Jiangsu 210098,China);Change Laws of Excess Pore Water Pressure during Forming of Filter Cake in Slurry Shield[J];Journal of Water Resources and Architectural Engineering;2013-03
7 Zhang Boyang(CCCC Tunnel Engineering Co.,Ltd.Beijing 100088,China);The Key Technology of Super Large Diameter Shield Tunnel[J];Chinese Journal of Underground Space and Engineering;2013-03
8 CHENG Zhenting(Engineering Consultation Co.,Ltd.,China Railway Fourth Survey and Design Group,Wuhan 430063,China);Preliminary Construction Plan for Tunnel on Qiongzhou Strait Crossing Railway Project[J];Tunnel Construction;2008-04
9 JIA Hang,DU Chuangdong,WANG Wenjie(China Railway Tunnel Stock Co.,Ltd.,Xinxiang 453000,Henan,China);Large-diameter Slurry Shield Boring Technology in Water-rich Soft Ground with Shallow Cover[J];Tunnel Construction;2009-03
10 DU Chuangdong,JIA Hang,WANG Kun(China Railway Tunnel Stock Co.,Ltd.,Xinxiang 453000,Henan,China);Comparison and Application of Chamber-entering Technology of Large-diameter Slurry Shield in Complex Strata[J];Tunnel Construction;2009-04
China Proceedings of conference Full-text Database 3 Hits
1 Ren Liwei,Zhao Haifeng,Zhao Yu,Ma Hanchun,Du Dachuan;Study on Status and Development Trend of Manufacturing Technology of Large Shield Machine for Long Distance Excavating under High Water Pressure[A];[C];2011
2 HAN Xiao-rui~1 ZHU Wei~(1,2) LIU Quan-wei~3 ZHONG Xiao-chun~4 MIN Fan-lu~1 (1.Research Institute of Geotechnical Engineering, Hohai University, Nanjing 210098, China; 2.College of Environmental Science and Engineering, Hohai University, Nanjing 210098, China; 3. Nanjing Yangtze River Tunnel Engineering Headquarters, China Railway Fourteenth Group Corporation, Nanjing 211800, China; 4. College of Civil Engineering, Hohai University, Nanjing 210098, China);Influence of slurry property on filter-cake quality on working face of slurry shield[A];[C];2008
3 ZHAO Lei~1,LU Hao~2,WANG Ming-yang~2,SHI Ye-hui~2,XIAO Jun-hua~3,YANG Bao-huai~4 (1.Logistics College of the CPLA,Beijing,100858 China;2.PLA University of Science and Technology,Nanjing.210007,China; 3.Transportation College,Nanjing University of Technology,Nanjing 210009,China;4.Kentop civil engineering,Nanjing 210007,China);Application Study of W.Kent Index Method on Risk Assessment in Subway Engineering Construction[A];[C];2012
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 WEI Liang-wen1,ZHANG Qing-he1,DENG Zhong-yi2(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.Bovis Lend Lease(Shanghai) Co.Ltd.,Shanghai 200031,China);Research on Mechanism and Application of Face Stability in Large Slurry Shield Tunneling[J];Chinese Journal of Underground Space and Engineering;2007-01
2 CHEN Zhan lin,WU Zhong ming,XU Yan yong (Yangtze River Scientific Research Institute,Wuhan 430010,China);Experimental study on stability of tunnel excavation surface in sand foundation by slurry shield method[J];Journal of Yangtze River Scientific Research Institute;2001-05
3 Peng Shaojie;Countermeasure to Enhance Durability of Driving Tool of Geostatic Shield in Sandy Gravel Stratum[J];Urban Roads Bridges & Flood Control;2006-06
4 Wang Zhenxin;Safety Analysis of Road Tunnels[J];Undergrourd Engineering and Tunmels;2003-01
5 Wang Xi;Utilization of Tunnel Space Review of River-crossing Tunnels in Shanghai[J];Undergrourd Engineering and Tunmels;2003-01
6 Yao Minghui(Guangzhou Branch, the 2~ nd Engineering Company, the 13~ th Bureau Group Corp.,C. R. C. C., Guangzhou 510600);Techniques for Relieving a Shield from Trapping and Corresponding Countermeasures[J];Urban Rapid Rail Transit;2006-05
7 Qu Tianxiang(China Railway Tunnel Joint Stock Co., Ltd., Xinxiang, Henan 453000);Shield Type Selection for the Water Diversion Tunnel Project across the Yellow River[J];Urban Rapid Rail Transit;2007-01
8 He Meide1 Le Guiping2 Liu Jun1(1.Beijing Municipal Engineering Research Institute,Beijing 100037;2.Beijing MRT Construction Administration Corporation,Beijing 100037);Stress Variation in Lining Segments Induced by the Construction of a Cross Passage in a Shield Tunnel[J];Urban Rapid Rail Transit;2007-03
9 Jin Shihe(14th Engineering Bureau Group Co.,Ltd.,C.R.C.C.,Jinan 250014);Strategies for EPB Shield Tunneling through Hard Rocks on Guangzhou Metro[J];Urban Rapid Rail Transit;2007-03
10 You Xinhua Wang LiangHuang Xiuyun Guo Xuhong(Beijing Urban Engineering GroupCorporation,Beijing 100044);Planning Principles and Analysis of Affecting Factors for Shied Tunneling[J];Urban Rapid Rail Transit;2007-03
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved