Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Construction Economy》 2007-03
Add to Favorite Get Latest Update

Differentiation of the Agent-construction Method and Other Project Management Methods

ZHANG Wei, ZHOU Guodong  
The Agent Construction Method (ACM) is similar with the General Contracting Method and Project Management Contracting Method in mechanism. However, it can be concluded through comparison that ACM is actually most similar with the traditional method. The primary innovation of ACM beyond the traditional method is the break and reallocation of owner's responsibility which is expatiated in the agreement among the buyer, the user and the agent contractor. So it is highly important to ensure the rights of the agent contractor as the owner in the construction phase, thus, some related laws and regulations need to be amended.
【Fund】: 北京市科学技术委员会博士生论文资助专项(ZZ0615)
【CateGory Index】: F283
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 6 Hits
1 ①② Wang Yan;① Zhang Feilian;① Yan Hongyan(①School of Civil Engineering,Central South University,Changsha 410075,China;②School of Science,Jiangshu University,Zhenjiang 410075,China);The Contractual Nature of Construction Agent System for Government-Funded projects——Based on the Perspective of Production Factors[J];Value Engineering;2009-09
2 WANG Shuwen , ZHANG Yunning , WANG Ling , WANG Xuehua;Application Pilot Analysis of Agent Construction System in China[J];Construction Economy;2008-05
3 YOU Yinglai;A Comparative Analysis of Agent-construction System and CM@R[J];Construction Economy;2009-02
4 Zhang Yu-ling Li Hui-min Ma Xin;APPLICATION RESEARCH ON AGENT CONSTRUCTION SYSTEM IN THE INFRASTRUCTURES CONSTRUCTION OF NEW COUNTRYSIDE[J];Building Technique Development;2010-01
5 SHI Wang(Jiangsu Education Development Co.,Ltd.,Nanjing 210024,China);Discussion on the Implementation of Agent System in the Education Construction Project[J];Value Engineering;2013-24
6 LI Gong-xiang1,YIN Yi-lin1,2,ZHOU Jin-e2(1.School of Management,Tianjin University,Tianjin 300072;2.School of Management,Tianjin University of Technology,Tianjin 300384);A Study on the Fast Construction Mechanism of Postearthquake Reconstruction Supportability Public Project[J];Soft Science;2009-12
China Proceedings of conference Full-text Database 1 Hits
1 MA Baiyu1, QI Anbang2,ZHAI Lei2 (1. Tianjin Infrastructure Construction Investment Group CO.,LTD ) (2. Project Management Research center of Nankai University);Research on Total Integration Management System of Construction Agent Corporation of Governmental Investment Project[A];[C];2008
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 DENG Zhong-mei Faculty of Construction Management and Real Estate,Chongqing University,Chongqing 400045,China;Construction-agent system project management pattern study based on principle-agent theory[J];Journal of Chongqing Jiaotong University;2006-02
2 JIA HuSchool Of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,china;;The application and research of construction agent system in project management[J];Journal of Chongqing Jiaotong University;2006-S1
3 Long Jiangying;Elementary Introduction to Application of Agent Construction System for Management of Engineering Projects[J];Urban Roads Bridges & Flood Control;2006-05
4 Liu Jiwei,Zhu Hongbo;Practice and Discussion on Construction Agent Mode for Investing Municipal Infrastructure Project[J];Urban Roads Bridges & Flood Control;2010-10
5 Xie Xiao hong,Hu Yu jin(School of Management,Xi'an University of Architecture & Technology, Xi'an 710055, China);A Research on New Project Management Model on the Present Stage[J];Fujian Architecture & Construction;2003-02
6 Xiao AiYu(XiaMen Gao Cheng Xin Construction Supervision Co.Ltd 361000);The emphase and countermeasure for the whole process that the cost of Project[J];Fujian Architecture & Construction;2008-09
7 Li Haoran (Dept. of Railway Eng., Tongji Univ., Shanghai 200331) Zhao Gang (Shanghai SHENTONG Holdings Group CO., LTD., Shanghai 200020);The Idea about the Application of Construction Management Approach in Mass Transit Project[J];Urban Mass Transit;2001-01
8 YAN Ling1,ZHAO Hua2,MENG Fan-li1(1.School of Management,Tianjin University of Technology,Tianjin 300384,China; 2.School of Management,Tianjin University,Tianjin 300072,China);Lump Sum Contract Price Control in Agent Construction Public Project Based on Risk Allocation[J];China Harbour Engineering;2010-06
9 YU Bai-yong (Transportation College,Southeast University,JiangsuNanjing210024,China);Application Of CM Mode In Urban Mass Transit Project Manegement[J];Journal of Highway and Transportation Research and Development;2004-01
10 Sun Zhixiao(Nanjing Environment Renewable Energy Co.,Ltd,Nanjing Jiangsu 210000);Application Prospect of CM Mode in Waste Incineration Plant Construction[J];Environmental Sanitation Engineering;2009-04
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 LI Ying1,ZHANG Guangzhong2,TAO Xueming1 (1.College of Architectural & Civil Engineering,Xihua University,Chengdu 610039,China;2.Sichuan JINGZHENG Build Consultation Manage Ltd.,Chengdu 610081,China);The practice and mode analysis for "deputize build system" in engineering project[J];Sichuan Building Science;2007-06
2 YU Teng,WANG Zhong-qun(Dept.of Comp.Sci.& Engn.,Anhui University of Technology and Science,Wuhu 241000,China);Knowledge management system framework based on Web[J];Journal of Anhui University of Technology and Science(Natural Science);2007-03
3 Li Yongchao,Lv Tianyu(PLA Military Economy College,Wuhan 430035,China);Construct the Substitutive Project Management Pattern for Government-invested Project under Checks and Balances[J];Anhui Architecture;2007-01
4 LI Zhen et al(School of Engineering & Technology,Chengdu University of Technology,Chengdu,Sichuan 614007);Modified Profit Allocation Algorithm among Enterprises in Supply Chain Based on the Shapley Value[J];Journal of Anhui Agricultural Sciences;2008-29
5 WANG Li(School of Civil and Transportation Engineering,Anshan University of Science and Technology,Anshan 114044,China);Study on self-organizing of construction enterprise and optimization industrial organization[J];Journal of Anshan University of Science and Technology;2005-Z1
6 Hu Yu Yan Jingfu (Beijing Institule of Civil Engineering and Architecture, Beijing 100083);New Model of Project Management for Government Investment——Entrust to a Company to Build and Manage System[J];Journal of Beijing Institute of Civil Engineering and Architecture;2003-03
7 Sun ZhenLuo Sihuai (Dept. of Civil Engineering, Beijing 100044);Fuzzy Maths Evaluation on Project Management of Construction Company[J];Journal of Beijing Institute of Civil Engineering and Architecture;2004-04
8 CAI Zhong-jian(College of Sports,Wenzhou University,Wenzhou 325035,Zhejiang China);On the Application of Deviation and Kurtosis in Descriptive Statistics[J];Journal of Beijing Sport University;2009-03
9 BAI Jun-feng1,2,YIN Yi-lin1,3(1.School of Management,Tianjin University,Tianjin 300072;2.Changchun University of Technology,Changchun 130012;3.School of Management,Tianjin University of Technology,Tianjin 300191);Study on Agent Fee Model of Agent Construction Project[J];Journal of Beijing Institute of Technology(Social Sciences Edition);2009-03
10 YAN Ling1,ZHOU Guo-dong2(1.Management School of Tianjin University of Technology,Tianjin 300384;2.Office of Key Project Inspectors,National Development and Reform Commission,Beijing 10082);The State and Problems of Agent Construction System of the Government Investment Projects in China[J];Journal of Beijing Institute of Technology(Social Sciences Edition);2009-05
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 DU Ya-ling,YIN Yi-lin(School of Management,Tianjin University of Technology,Tianjin 300384);Research on the Improvement of Agent Construction Project Management Performance Based on Project Governance[J];Journal of Beijing Institute of Technology(Social Sciences Edition);2010-06
2 ZHANG Ping1,YIN Peng2(1.Infrastructure Department,Shandong Jianzhu University,Jinan 250101,China; 2.College of Engineering and Engineering Management,Shandong Jianzhu University,Jinan 250101,China);Research on Management of Government Investment Construction Projects in Jinan[J];Construction & Design for Project;2013-01
3 GAO Hui-qin1,2,LIU Jing-ai3,FU Hong-yuan2 (1. School of Management,Shandong Jianzhu University,Jinan 250101,China 2. School of construction management and real estate Chongqing University,chongqing 450000,China; 3. Institute of Shangdong Construction and Development,Jinan 250001,China);Construction of project management companies based on overall process agency construction system[J];Construction Management Modernization;2009-03
4 ZHOU Hang,XU Wei;Discussion on the Change of University Basic Construction Management Work Focus[J];Construction Economy;2009-06
5 SUN Jinfeng;Local Important Project:Constructional Promotion and Regulatory Response[J];Construction Economy;2010-05
6 YIN Yilin, SU Yongqing, ZHONG Wei;Discussion on Investment Control System of Post-earthquake Reconstruction Supportability Public Projects[J];Construction Economy;2010-06
7 ZHENG Bianjiang;Design of Incentive Contract in Agent Construction System Based on Cost Reimbursement[J];Construction Economy;2010-11
8 TANG Ding;Practice and Inspiration of Government Investment Project Management[J];Construction Economy;2011-09
9 YOU Ying-lai(Department of Architecture Engineering,Xiamen University of Technology,Xiamen 361024,China);A Probe into the Construction-Agent Based Design of GMP[J];Journal of Xiamen University of Technology;2009-01
10 JIANG Ji-yao(Guocheng Real Estate Limited Liability Company,Longyan,Fujian,364000,China);The application of agent construction system in the management of projects invested by government ——A case study in Longyan city[J];Journal of Minxi Vocational and Technical College;2012-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved