Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Shanxi Architecture》 2009-07
Add to Favorite Get Latest Update

The construction technology of cutting pile plank wall

ZHAO Hu  
Combined with engineering general situation of Yu-Huai railway from DK318+807.25 to DK318+904.75 section,the pile plank wall construction process and construction points of anchor pile,bolt end member bar embedding,cutting excavation and pile plank wall were introduced,which decreased cubic metre of earth and stone and land consumption and guaranteed side slope stability and easy to hierarchical excavate mechanically and production circulation.
【CateGory Index】: U213.1
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 LIU Xu-feng WEI He;The analysis of stability of the supporting method of soil nailing wall and mini-pile[J];Shanxi Architecture;2007-29
【Secondary Citations】
Chinese Journal Full-text Database 1 Hits
1 ZHOU Yi 1 TIAN Hua 2 (1. Yangtze River Water Conservancy Committee Design Academy, Wuhan 4 30010, China; 2. Shanxi Architectural Scientific Research Academy, Taiyuan 0300 01, China);Design of limit sustained by nail and its application[J];Shanxi Architecture;2005-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved