Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Shanxi Architecture》 2009-19
Add to Favorite Get Latest Update

Construction technology of railway passenger dedicated line two-hole box full of prefabricated

LV Bai-jun  
Combining practical projects,the paper introduces prefabricating methods of brief box-beam,it discusses prefabricating technology and quality ensuring measures of brief box-beam,states protecting measures of finished beam,so as to accumulate experiences for construction of railway passenger dedicated line two-hole box full of prefabricated.
【CateGory Index】: U445.471
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 YAO Suo-ping;Prefabricated construction of 32m double-track whole span box girder by post-tensioning method in passenger dedicated line[J];Shanxi Architecture;2008-07
【Secondary Citations】
Chinese Journal Full-text Database 1 Hits
1 WANG Yong-juan;Quality control of 25 m post-tensioned prestressed box beam[J];Shanxi Architecture;2006-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved