Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Shanxi Architecture》 2009-31
Add to Favorite Get Latest Update

Double-wall steel boxed cofferdam construction technology of the Fuyang Lushan large bridge main tower pier

LI Hai-hong  
The author introduces the construction scheme of adopting double-wall steel boxed cofferdam construction of Fuyang city Lushan large bridge main pier bearing platform in the water,describes the construction control points of several important procedures,such as production of the double-wall steel cofferdam,the assembling situation of the ganglia cofferdam pile platform and upper cofferdam flow-levitation state,and the large cofferdam bottom sealing,so as to accumulate technology experiences for similar project.
【CateGory Index】: U445.556
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 ZHANG Shi-jun;Design and construction of bearing steel board pile around weir in shallow water[J];Shanxi Architecture;2007-17
【Secondary Citations】
Chinese Journal Full-text Database 2 Hits
1 QI Feng-jun;Steel sheet pile cofferdam construction[J];Shanxi Architecture;2006-19
2 SONG Jin-he ZHENG We-jiang;Construction of deep foundation steel sheet pile cofferdam in water[J];Shanxi Architecture;2006-21
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved