Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Shanxi Architecture》 2011-05
Add to Favorite Get Latest Update

On cohesion of urban underground track traffic,long-distance and railway passenger traffic

ZHANG Xu  
According to the summery of implemented projects of No.1 and No.2 lines of Xi'an subway,the paper analyzes the characteristics of the traffic hub stations and the comprehensive traffic hub in the passenger flow and the combination with surrounding planning,and the ways of how to do well in passenger transfer among these traffic ways,and points out the problems caused by the cohesion between subways and passenger traffic,so as to enhance the integration of the traffic system construction.
【CateGory Index】: U291.75
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 2 Hits
1 JIAN Fan (College of Traffic and Transport, Northern Jiaotong University, Beijing 100044,China);Analysis and Study of Joining and Cooperation Between Urban Rail Traffic and Other Modes[J];Journal of Northern Jiaotong University;2001-04
2 ZHAO Zan;On railway connection planning of No.1 track in Ningbo[J];Shanxi Architecture;2010-04
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 LUO Jian-hui,ZHOU Ming,XU Fang-chen(Shanghai Municipal Engineering Design and Research Institute,Shanghai 200092,China);Planning and Design of the Urban Underground Transit Hub——Based on the example of the transit hub at Shanghai bund[J];Chinese Journal of Underground Space and Engineering;2006-S1
2 CAO Shouhua,YUAN Zhenzhou,HAN Baoming,LI Dewei(School of Traffic and Transportation, Beijing Jiaotong University, Beijing 100044,China);Classification for Passenger Transport Integrative Hubs Based on SOFM Neural Network[J];Journal of Beijing Jiaotong University;2008-06
3 SUN Juan,NING Jian-guo (School of Mechatronics Engineering, Beijing Institute of Technology, Beijing100081, China);Agent-Oriented Urban Transit Automatic Train Supervision Simulation System[J];Journal of Beijing Institute of Technology;2004-08
4 SONG Xin-sheng(Pingdingshan Institute of Technology,Pingdingshan 467001,China);Link and coordination between green traffic ways in city[J];Journal of Pingdingshan Institute of Technology;2006-04
5 XU Wei-nan, WU Zheng(Department of Mechanics and Engineering Science, Fudan University, Shanghai 200433,China);Mathematical model for the passenger flow in subway station waiting rooms[J];;2005-02
6 HU Gui-lin (Zhuzhou Electric Locomotive Works,Zhuzhou412001,China);Development of new type independent drive system of wheel-motor inte gration[J];Technology For Electric Locomotives;2002-01
7 TAO Gong-an(CSR Zhuzhou Electric Locomotive Co.,Ltd.,Zhuzhou 412001,China);Outline calculation of metro vehicles[J];Electric Locomotives & Mass Transit Vehicles;2006-03
8 Tian Jiefang;Wei Qngchao School of Civil Engineering and Architecture, Beijing Jiaotong University Beijing 100044;A Study on the Method to Assess the Equipment Bidding of Urban Rail Transit Engineering[J];Urban Rapin Rail Transit;2004-03
9 Chen Guang( Nanjing Metro Construction Headquarter, Nanjing 210024);Research on the Application of Full Life - span Cycle Value in Urban Rail Transit Project[J];Urban Rapin Rail Transit;2004-S1
10 Tian Jiefang Wei Qingchao(School of Civil and Architecture Engineering, Beijing Jiaotong University, Beijing 100044);BOT Mode and Its Application in Urban Rail Transit Construction[J];Urban Rapin Rail Transit;2004-S1
China Proceedings of conference Full-text Database 5 Hits
1 Ren weiqiang Chen Yanyan Luo Ming;Study on TOD of Rail Transit[A];[C];2008
2 Ren Weiqiang Chen Yanyan Luo Ming;STUDY ON CONNECTIONS OF BEIJING RAIL TRANSIT WITH OTHER TRAFFIC MEANS[A];[C];2008
3 DAI Weisi CHEN Yi (Transportation College,Southeast University,Nanjing 210096);Research on transfer and feeder of rail transit and general bus[A];[C];2005
4 BAO Lixia,CHEN Hong (Shanghai Urban Construction Design and Research Institute,上海200125);Making Hongqiao Hub Lliving WIith Information——Management information system study of Hongqiao transportation hub based on multi-agent[A];[C];2010
5 Lu Mengchao Rail Transit Maintenance Support Centre of Shanghai Metro Co.,Ltd.,200233,Shanghai,China;Plan and Design of Connection with the Transport Hub of Convergence Longde Road Station of Shanghai Urban Rail Line13[A];[C];2010
【Secondary Citations】
Chinese Journal Full-text Database 7 Hits
1 Liu Bing;Considerations in the Turning Period of Urban Transportation Facilities in China[J];Urban Planning Forum;1996-02
2 Li Xiaoming;Thought of Sustainable Development for Solving Urban Traffic Problems[J];URBAN PLANNING REVIEW;1997-02
3 He Ning & Li Ling;Network Analysis and Planning of Urban Express Rail[J];URBAN PLANNING REVIEW;1997-03
4 Zhou Zhijun; Song Jiongjiong; Yang Dong-yuan;Forecasting of Stategic Transit Demand[J];URBAN PLANNING REVIEW;1997-05
5 XU Daofang;Planning and Enforcement of Shanghai Track Transportation Network[J];URBAN PLANNING REVIEW;1999-06
6 WANG Xuan; BAI Tinghui;The Integral Construction of Subway[J];URBAN PLANNING REVIEW;1999-06
7 GAN Yong-hua~1(1.Guangzhou Transport Planning & Research Inst.,Guangzhou 510030,China);Guangzhou Integration Planning of Urban Rail Transport and Other Transport Modes[J];Journal of Huazhong University of Science and Technology(Urban Science Edition);2006-S2
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved