Study on the differential settlement control technology in bidirectional synchronization construction

ZENG Shuang1 YANG Feng-liang2(1.Architecture Design & Research Institute Co.,Ltd of Tongji University,Shanghai 200000,China; 2.Shanghai Construction Group Co.,Ltd,Shanghai 200052,China)  
By using the finite element analyzing software,the study establishes the simulation formwork for the bidirectional synchronous construction of some mansion,considers the time changing characterization of the constrain of surrounding soil and the concrete,and analyzes the differential settlement among the components in the construction process,so it provides reliable data support for the engineering construction.
【CateGory Index】: TU753
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 3 Hits
1 Jiang Xianghong,Ding Yiping,Zhang Qingfu(Shanghai No.2 Construction Co.,Ltd,Shanghai 200090,China);Study of Bidirectional Synchronization Construction Design for High-Rise Buildings in Complex Geological Environment[J];Chinese Journal of Underground Space and Engineering;2011-05
2 Jiang Shu Jie;Application and Prospective Review on Reserved Construction Method for Urban Underground Space Development[J];Building Construction;2004-04
3 ;Construction Schedule and Progress Control for Super Tall Building[J];Building Construction;2008-08
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 WANG Jian-hua~1 , XU Zhong-hua~1 , CHEN Jin-jian~1 , WANG Wei-dong~2 (1. Department of Civil Engineering, Shanghai Jiao Tong University, Shanghai 200030, China; 2. East China Architectural Design & Research Institute Co.Ltd., Shanghai 200002, China);Deformation Properties of Diaphragm Wall Due to Deep Excavation in Shanghai Soft Soil[J];;2005-04
2 DENG Wen-long (Shanghai NO.2 Construction Co.Ltd, Shanghai 200080, China);The Top-down Construction Technique for Super Foundation of Changfeng Building[J];;2005-04
3 GAO Yan-bin1,ZHANG A-jin1,2(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Tongji University,Shanghai 200092,China);STUDY ON THE CHOICE OF SOIL PRESSURE IN THE TOP-DOWN CONSTRUCTION OF SOFT SOIL AREA[J];Low Temperature Architecture Technology;2010-03
4 SHEN Kai-peng1,WEI Xi-ling2,JIA Jian-hua2,XIANG Wei-ming1(1.School of Civil Engineering,Guangzhou University,Guangzhou 510006,China; 2.Guangzhou Air Defence Institute of Architectural Design Co.,Ltd.,Guangzhou 510500,China);Design and analysis of joint of slab-column of underground engineering by top-down method[J];Journal of Guangzhou University(Natural Science Edition);2012-06
5 ;Practice on Structural Construction of Ultra Deep Foundation Pit with Top-Down Construction Method for You-You International Plaza Project[J];Building Construction;2006-07
6 Hu Yuyin;The Third Lecture:Construction Organization for Super Tall Building-Part Ⅲ[J];Building Construction;2007-07
7 ;Relying on Enterprise's Core Technology,Improving Project Management Ability of General Contract[J];Building Construction;2007-09
8 ;Construction Schedule and Progress Control for Super Tall Building[J];Building Construction;2008-08
9 ;Construction Progress Control of Aerial Huaxi Village Project[J];Building Construction;2012-02
10 ;Study on Key Technology of Positive Top-Down and Double-Way Synchronous Construction for Super Tall Commercial Building[J];Building Construction;2012-03
China Proceedings of conference Full-text Database 4 Hits
1 WANG Jian-hua, XU Zhong-hua, CHEN Jin-jian, WANG Wei-dong (Department of Civil Engineering, Shanghai Jiao Tong University, Shanghai 200030, China; East China Architectural Design & Research Institute Co. Ltd., Shanghai 200002, China);Deformation Properties of Diaphragm Wall Due to Deep Excavation in Shanghai Soft Soil[A];[C];2005
2 DENG Wen-long (Shanghai NO.2 Construction Co. Ltd, Shanghai 200080, China);The Top-down Construction Technique for Super Foundation of Changfeng Building[A];[C];2005
3 WANG Jian-hua, XU Zhong-hua, CHEN Jin-jian, WANG Wei-dong ( Department of Civil Engineering, Shanghai Jiao Tong University, Shanghai 200030, China; East China Architectural Design & Research Institute Co.Ltd., Shanghai 200002, China);Deformation Properties of Diaphragm Wall Due to Deep Excavation in Shanghai Soft Soil[A];[C];2005
4 DENG Wen-long (Shanghai NO.2 Construction Co.Ltd, Shanghai 200080, China);The Top-down Construction Technique for Super Foundation of Changfeng Building[A];[C];2005
【Secondary Citations】
Chinese Journal Full-text Database 7 Hits
1 Shaw Shieh and Jong Jiunhong(Evergreen Consulting Engineering, Inc. Taiwan);Construction Technologies and Their Theoretical Backgrounds of the Taipei Financial Center[J];Progress in Steal Building Structures;2002-04
2 Jiang Shu Jie;Application and Prospective Review on Reserved Construction Method for Urban Underground Space Development[J];Building Construction;2004-04
3 ;Design of Semi- Reversed Construction Method of Row Pile Supporting System for Super Large Deep Foundation Pit[J];Building Construction;2006-04
4 ;Practice on Structural Construction of Ultra Deep Foundation Pit with Top-Down Construction Method for You-You International Plaza Project[J];Building Construction;2006-07
5 ;The Third Lecture:Construction Organization for Super Tall Building Part Ⅰ[J];Building Construction;2007-05
6 Ye Keming\ Fan Qingguo;Technology for Construction of Jinmao Tall Building in Shanghai[J];Construction Technology;1999-01
7 ZHU Xian-hui,WANG Gui-ping,GU Qian-yan(The Ninth Design & Research Institute,Shanghai 200063,China);Design and practices of deep foundation pits of towering buildings constructed by top-down method[J];Chinese Journal of Geotechnical Engineering;2006-S1
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved