Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Shanxi Architecture》 2012-21
Add to Favorite Get Latest Update

Research on pile-soil load-sharing ratio of top-down construction method

LIU Chao(Qingdao Branch Company,Shandong Real Estate Development Group,Qingdao 260042,China)  
Taking the civil air defense engineering as the example,the paper studies the load-sharing ratio of medium-column pile and un-excavation soil under that condition of mutual loading of the two in the construction with top-down method,carries out three-dimensional model establishment of typical engineering section with finite element software ANSYS.Thus,it not only simulates the engineering soil excavation process,but also effectively analyzes the soil pressure distribution and obtains the medium-column pile stress field,soil stress field and deformation field and other information,which has provided basis for the design and construction of top-down construction method.
【CateGory Index】: TU753.3
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Chen Liang,Chen Shou-gen;Simulation and analysis of the whole construction process of cover and cut-top down method in ShenZhen subway tunneling[J];Jilin Water Resources;2010-06
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 ZHAN Wei-guo~1,SUN Yang-bo~2(1.Corporation of Advanced Highway of Anhui Province,Hefei 230022,China;2.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China);Top-down construction method and application of it to deep pit[J];Journal of Anhui Technical College of Water Resources and Hydroelectric Power;2006-02
2 WANG Jian-hua~1 , XU Zhong-hua~1 , CHEN Jin-jian~1 , WANG Wei-dong~2 (1. Department of Civil Engineering, Shanghai Jiao Tong University, Shanghai 200030, China; 2. East China Architectural Design & Research Institute Co.Ltd., Shanghai 200002, China);Deformation Properties of Diaphragm Wall Due to Deep Excavation in Shanghai Soft Soil[J];;2005-04
3 SHEN Lei , LU Yu-nian , Yue Jian-yong (Shanghai Institute of Architectural Design & Research Co. Ltd, Shanghai, 200041 P.R.China);Deformation Characteristics of Oversized Deep Foundation Pit : Comparison of Numerical Simulation with the Instrumentation Results[J];;2005-04
4 DING Chang-guo,HE Shu-huan(No.5 Engineering Co.Ltd.,of China Railway 11 Bureau Group,Chongqing 400037,China);Excavation Method for Deep Foundation Pit and Top-down Construction Technique of Ribbed Plate Anchored Retaining Wall[J];Chinese Journal of Underground Space and Engineering;2006-02
5 SUN Yang-bo~(1,2),YUAN Ju-yun~(1,2),ZHAO Xi-hong~(1,2)(1.Key Laboratory of Geotechnical Engineering,Tongji University,Shanghai200092;2.Department of Geotechnical Engineering,Tongji University,Shanghai200092);A Study on Obligating Width of Soil Slope Shoulder in Basin Opening for Top-down Construction Method[J];Chinese Journal of Underground Space and Engineering;2006-05
6 QI Gan1,ZHU Rui-jun2(1.China University of Mining and Technology Beijing 100083,China;2.Beijing University of Science and Technology Beijing 100083,China);Analysis of Factors Affecting the Ground Settlement around Deep Foundation Pit Based on BP Neural Network[J];Chinese Journal of Underground Space and Engineering;2007-05
7 YAN Han-sheng, CUI Ping-yu (Department of Capital Construction ,Northwestern Polytechnical University ,Xi'an710072,China);Analysis of Deep Foundation Ditch under Railway used for Frame-Jacking Construction[J];Chinese Journal of Underground Space and Engineering;2007-S2
8 HUAI Wen-wei~1 SUN Yang-bo~2 (1.Jingxie Building Exploitation Co.in Kuashan,Kunshan 215300,China;2.Shanghai Harbor Enginerring Control & Testing Co.,Ltd,Shanghai 200032,China);Research on Ground Improvement in Passive Zone of Soft Clay Excavation with Top-down Construction Method[J];Chinese Journal of Underground Space and Engineering;2008-03
9 NI Bing-yu,WANG Ming-sheng(1.China Railway Tunnel Survey & Design Institute Co.,Ltd,Hongqiao,Tianjin 300133;2.China Railway Tunnel Group Co.,Ltd,Luoyang,Henan 471009,China);Study on Under-Cover-Reverse-Building Method for the Construction of Wide-span Metro Station[J];Chinese Journal of Underground Space and Engineering;2008-04
10 Zheng Jianguo1.2,Liu Tao1.2,Wang Xiuhai1.2(1.Key Lab of Marine Environmental Science and Ecology,Ministry of Education, Ocean University of China,Qingdao Shandong 266100,China; 2.School of Environmental Science and Engineering,Ocean University of China,Qingdao Shandong 266100,China);Analyses on Vertical Stress and Deformation Compatibility in Metro Station Constructed Top-down with Covered Excavation[J];Chinese Journal of Underground Space and Engineering;2011-S2
China Proceedings of conference Full-text Database 3 Hits
1 WANG Jian-hua, XU Zhong-hua, CHEN Jin-jian, WANG Wei-dong (Department of Civil Engineering, Shanghai Jiao Tong University, Shanghai 200030, China; East China Architectural Design & Research Institute Co. Ltd., Shanghai 200002, China);Deformation Properties of Diaphragm Wall Due to Deep Excavation in Shanghai Soft Soil[A];[C];2005
2 SHEN Lei , LU Yu-nian , Yue Jian-yong (Shanghai Institute of Architectural Design & Research Co. Ltd, Shanghai, 200041 P.R.China);Deformation Characteristics of Oversized Deep Foundation Pit : Comparison of Numerical Simulation with the Instrumentation Results[A];[C];2005
3 Li Jinbao.Pan Liushun,Zhao Qiming (Jiangsu Southeast Special Technology Project Co.,lid.,Nanjing,Jiangsu 200018,China);Deep Foundation Excavation Supporting Technology of Original Basement with New Fire Elevator[A];[C];2011
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 WANG Yuan zhan 1,WANG Hai long 1,ZHANG Wen zhong 2 (1 Tianjin University, Tianjin 300072;2 Tianjin Port Engineering Institute, Tinajin 300222);Distribution of Earth Pressure on Retaining Wall[J];CHINA HARBOUR ENGINEERING;2000-04
2 Liu Chang,Zhang Jian,Tan Chuanjiang,Li Boya;Cover and Cut Method and Finite Element Analysis of Comprehensive Transportation in Futian Subway Station[J];Building Structure;2009-S1
3 ZHAO Jie1,YU De-hu 1,ZHANG Tong-bo2 (1.School of Civil Engineering,Qingdao Technological University,Qingdao 266033,China; 2.Qingjian Group Co.,Ltd.,Qingdao 266071,China);An Analysis of Numerical Simulation of Middle Pillar Pile in Excavation of Cut and Cover Reverse Method[J];Journal of Qingdao Technological University;2011-05
4 Cao Keqing (Shangnai Museum of Natural History, Shanghai 200002, PRO;Varitional Solution to Active Pressure and Passive Pressure[J];Shanghai Geology;1996-02
5 Pel Qinfa Ma Hailong (Tongji University) (Suzhou Institute of Urban Construction & Environmental Protection);THE APPLICATION OF THE METHOD OF LAYERED SUMMATION TO NONLINEAR ANALYSES OF PILE GROUP[J];;1997-01
6 CHEN Mingzhong 1, GONG Xiaonan 1,YAN Ping 1 (1 Zhejiang University, Hangzhou\ 310027, China);An analytical solution for settlement of single pile[J];JOURNAL OF HYDRAULIC ENGINEERING;2000-08
7 XIAO Yan~1, WANG Bo~2, WANG Guang-ming~1(1. Beijing municipal engineering institute Beijing 100037, China; 2. Fourth construction division of Beijing municipal group, Beijing 100055, China);The Top-Down Method and Construction[J];Municipal Engineering Technology;2004-06
8 ChenHe Chen Yangxun (Beijing General Municipal Engineering Design and Research Institute,100082);Stress Analysis of Steel Tube filled Concrete Column in one Long-span Top-down Covered Excavation Subway Station[J];Special Structures;2009-02
9 Hu Minyun 1, Xia Yongcheng 2, Gao Quqing 2 ( 1 Zhejiang University, Hangzhou 310027 China) ( 2 Southwest Jiaotong University, Chengdu 610031 China);CALCULATION PRINCIPLE OF EARTH PRESSURE AGAINST RETAINING PILES OF PILE ROW RETAINING STRUCTURE[J];CHINESE JOURNAL OF ROCK MECHANICS AND ENGINEERING;2000-03
10 Wang Guangguo 1, Du Mingfang 1, Hou Xueyuan 2 ( 1 Zhengzhou Grain College, Zhengzhou 450052 China) ( 2 Tongji University, Shanghai 200092 China);LARGE DEFORMATION ANALYSIS FOR BRACED EXCAVATION[J];CHINESE JOURNAL OF ROCK MECHANICS AND ENGINEERING;2000-04
【Secondary Citations】
Chinese Journal Full-text Database 1 Hits
1 XIAO Yan~1, WANG Bo~2, WANG Guang-ming~1(1. Beijing municipal engineering institute Beijing 100037, China; 2. Fourth construction division of Beijing municipal group, Beijing 100055, China);The Top-Down Method and Construction[J];Municipal Engineering Technology;2004-06
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved