《Shanxi Architecture》 2012-31
Add to Favorite Get Latest Update

Retaining pile and columns difference settlement analysis of a top down method foundation pit

TANG Xiao-qiang1,2 ZHANG Zhi-hao2 ZHANG Geng-cheng2(1.Environmental Science and Engineering College,Ocean University of China,Qingdao 266100,China; 2.China Petroleum East China Survey & Design Institute Geotechnical Engineering Company,Qingdao 266071,China)  
In this paper,a project of air defense top down foundation pit was numerical computed by plaxis.And according to the above calculation,an analysis of difference settlement of supporting pile and post with a hard layer(strong weathering rock) under the bottom was presented.Pit-bottom uplift estimated by Tongji method,calculation and the results of numerical simulation coincide,indicating that the rock area basal rebound main control factor is simple unloading rebound.If reversed construction of retaining structure and columns are embedded in the rock piles,the differential settlement between the two components is very small,meeting the requirements of the structural design.
【CateGory Index】: TU753
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 3 Hits
1 FENG Jin-cai (Department of Environment and Safety Engineering, Jiangsu Polytechnic University, Changzhou 213016,China);FEM Analogue Analysis of the Athwart Construction Program of a Super Foundation Pit[J];Traffic Engineering and Technology for National Defence;2005-03
2 ZHONG Jian-chi~1, FENG Zhao-xiang~1, LIU Yu-tao~2, XU Wei~2(1.Jiangsu Provincial Yangtze River Highway Bridge Construction Headquarter, Nanjing 210001, China; 2.School of Civil Engineering, Tongji Univ., Shanghai 200092, China);Model test and parameter determination for rock embedded underground diaphragm wall[J];Journal of Hehai University (Natural Sciences );2004-02
3 Zhu Guohua~1,Liu Yutao~1,Huang Changjin~2(1.Zhongtian Construction Group Co.,Ltd.,Hangzhou,Zhejiang 310008,China;2.Jinhua Construction Cost Management Center,Jinhua,Zhejiang 321000,China);Analysis on Differential Settlement of Column and Wall in Some Basement with Reverse Construction Method[J];Construction Technology;2009-09
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Li Shaohui,Xu Wei(Building Engineering Department,Tongji University,Shanghai 200092,China);Mechanical analysis and discussion on design method of rock-socketed diaphragm[J];Building Structure;2008-04
2 FANG Chuan-xin1 SONG Xian-kun2 HAO Zong-bao3(1.No.6 Engineering Co.,Ltd of China Railway No.17 Bureau Group,Fuzhou Fujian 350300 China; 2.Nanjing Metro Construction Branch,Nanjing Jiangsu 210008 China; 3.Huainan Production Safety Supervision and Administration Station,Huainan Anhui 232001 China);Measurement Study of Differential Settlement between Diaphragm Wall and Mid Column in Reserved Construction Method[J];Jiangsu Construction;2011-06
3 GU Guo-ming;Real-time monitoring system of super-long steel lattice column veritcality[J];Construction Mechanization;2009-08
4 ;Key Construction Technology for Intermediate Transfer Section in Jiashan Road Station of Shanghai Rail Transit Line No.9[J];Building Construction;2012-09
5 SU Yong-bo,ZHANG Xiao—bing,PEI Bing-tuan;Application on Construction Technologies with Reverse Method of Deep Foundation Pit in Soft Soil Area[J];China Concrete and Cement Products;2013-06
6 LUO Zhi-yong(China Railway Eryuan Engineering Group Co.Ltd.,Chengdu,Sichuan 610031,China);Research on Deformation Characteristics of Foundation Pit of Metro Transfer Station Constructed in Soft Soil Area with Top-down Method[J];Journal of Railway Engineering Society;2010-12
7 LI Zhi;Engineering Management Department,Qingdao Vanke Real Estate Co.,Ltd.;;Top-down construction method of a pile of a steel column automation measurement applications[J];Journal of Qingdao Technological University;2013-04
8 BAO Xu-fan1,2,ZHUANG Li3,Lü Pei-lin3(1.School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China;2.Shanghai Municipal Engineering Design Institute,Shanghai 200092,China;3.Key Laboratory of Road and Traffic Engineering of the Ministry of Education,Tongji University,Shanghai 200092,China);Study on mound width remained during the construction of central island for large foundation pits in soft soils[J];Chinese Journal of Geotechnical Engineering;2006-10
9 LI Shao-hui,XU Wei(Department of Building Engineering,Tongji University,Shanghai 200092,China);Application of rock-socketed retaining structures for deep pits[J];Chinese Journal of Geotechnical Engineering;2006-S1
10 DONG Xue,LI Ai-min,KE Jing-yi,SHAO Biao (Tianjin Municipal Engineering Design and Reserch Institute,Tianjin 300051,China);Supporting structure design of central island excavated slopes for extra large and wide deep foundation pits[J];Chinese Journal of Geotechnical Engineering;2008-S1
China Proceedings of conference Full-text Database 1 Hits
1 Wu Shengdong JiLin Ruan Jing (Jiangsu Provincial Yangtze River Highway Bridge Construction Commanding Department,Jiangsu Nanjing 210004);Research on Key Technologies of Runyang Yangtze River Highway Bridge[A];[C];2009
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 Wu Hongbing et al.;Semi-Top-Down Construction Technology at the Jinanshi Station of Metro Line No.2 in Shanghai[J];Underground Space;1998-S1
2 GAO Wei et al.(81)[;Development of Research on Uncertain Back Analysis in Geotechnical Engineering[J];UNDERGROUND SPACE;2000-02
3 WANG ZHi liang et al.;Application of Genetic and Improved BP Algorithms in Geotechnical Engineering[J];Underground Space;2001-03
4 GAO Guang-yun et al.;Application of Genetic Algorithm-BP Neutral Networks in Monitoring of Deep Foundation Pit Excavation[J];Underground Space;2002-04
5 DENG Wen-long (Shanghai NO.2 Construction Co.Ltd, Shanghai 200080, China);The Top-down Construction Technique for Super Foundation of Changfeng Building[J];;2005-04
6 ZHAO Qi~1,XIE Jian-bin~1,MAO Zhen-wei~1(1.Shanghai NO.2 Construction Corporation,Shanghai 200080,P.R.China);Design and Construction of the Joint Node Used in the Deep Foundation by Topdown Construction Method[J];Chinese Journal of Underground Space and Engineering;2006-04
7 Chen Xiangdong (College of Architecture and Civil Engineering, Beijing Polytechnic University, Beijing 100022 ) Yang Maozhong (Beijing Real Estate Science & Technology Research Institute, Beijing 100021 );Informatization Construction and its Application[J];Journal of Beijing Polytechnic University;2001-01
8 ZHANG Cheng 1, HE Yue guang 2 (1.Shenhua Property Management Co. Ltd, Shenzhen 518002, China; 2.Central South Unversity of Technology, Changsha 410083, China);Engineering Supervision Technology on Informationization Construction of Foundation Ditch[J];Engineering of Surveying and Mapping;2000-04
9 揭? 陈晓平(武汉水利电力大学 武汉 430072);桩 承台 土共同作用的三维有限元分析 [J];GEOTICHNICAL INVESTIGATION AND SURVEYING;1999-06
10 WANG Yuan zhan 1,WANG Hai long 1,ZHANG Wen zhong 2 (1 Tianjin University, Tianjin 300072;2 Tianjin Port Engineering Institute, Tinajin 300222);Distribution of Earth Pressure on Retaining Wall[J];CHINA HARBOUR ENGINEERING;2000-04
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved