Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Technology & Economy in Areas of Communications》 2007-06
Add to Favorite Get Latest Update

The study of deputy construction mechanism on expressway in China

WEI Rui1,ZHANG Qi-ming2 (1.Guangba Expressway Headquarters of Communications Department, Chengdu 610041,China; 2. Engineering Division of Gansu Communications Department, Sichuan, Lanzhou 730030, China)  
Aiming at the management mode of expressway construction, it introduces the background of the deputy construction mechanism. Based on that, it expatiates the superiority of the mechanism. Through the application of the deputy construction mechanism on expressway, analysis is made on the experiences, the problems and the implement procedures and frame pattern.
【CateGory Index】: F542
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 ZHAO Wenyi,WANG Xuancang (School of Highway,Chang'an University,Xi'an Shaanxi 710064,China);Research on Governance Mechanism of Substitute Expressway Owner against Opportunism Behavior of Agent[J];Journal of Highway and Transportation Research and Development;2009-05
【Citations】
Chinese Journal Full-text Database 3 Hits
1 Zhang Ying;Exploration and Practice of Shenzhen Road Construction Agency System[J];Technology of Highway and Transport;2006-04
2 Zhao Wei-cheng Guo Ya-bing;Study of Key Problems About Highway Project Agent Management's Running Mechanism[J];Shanghai Highways;2006-03
3 WANG Gang~1 and FU Xiao-ming~2 1)College of Architecture and Civil Engineering Shenzhen University Shenzhen 518060 P.R.China2)Jianyi PM Co. Shenzhen 518001 P.R.China;Project management modes of government projects and characteristics[J];Shenzhen University Journal;2005-02
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Chen Zhaofang(Wuhan University,Wuhan,Hubei 430072);Research on the Issues of the Financial Management of Highway Construction Project under Agent Construction Mode[J];Communication of Finance and Accounting;2009-12
2 Xu jun;Discussion about Development of construction supervision enterprises based on Agent-construction model[J];Fujian Construction Science & Technology;2009-01
3 YANG Xia 1,ZHOU Wenfeng2(1.School of Economics and Management,Panzhihua College,Panzhihua 617000,China;2.School of Civil Engineering,Panzhihua College,Panzhihua 617000,China);Double principal-agent model of agent system[J];Sichuan Building Science;2010-03
4 GU Hong-chun,ZHANG You-zhi(College of Civil Engineering,Jiangsu University of Science and Technology,Zhenjiang 212003,P.R.China);Discussion about the Agent-Construction System of Governmental Project in China[J];Journal of Chongqing Jianzhu University;2006-05
5 Deng Xi Liu Xing(School of Civil Engineering,Wuhan University,Wuhan 430072);Grey Evaluation Method for Achievements of Agent Construction Manager of Government Investment Projects[J];Journal of Wuhan University of Technology(Transportation Science & Engineering);2008-02
6 LUO Feng;Research on the Application of Agent-Construction System in Government Investment Projects[J];Construction Economy;2007-S2
7 ZHAO Lu,DING Lieyun,LUO Hanbin;Management Innovation and Information Support of Centralized Deputy Construction Management Institution[J];Construction Economy;2009-04
8 GONG Su-zhi FENG Chuan-ping;Understanding and thoughts on the system entrusting one company to build and manage[J];Shanxi Architecture;2006-03
9 LI Jing;On improvement of instead-build system[J];Shanxi Architecture;2007-14
10 Luo Qian Ji Gencai Gao Kuang;Investigation on Hydraulic Project Managed by Construction Management Contractor in Construction Agent System[J];China Water Transport;2007-08
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 LI Jun~(1,2) CUI Miao~1 LIU Jiang~2 (1.School of Management,Dalian University of Technology,Dalian 116023,China;2.Henan Provincial Communications Department,Zhengzhou 450052,China);Agent System Model of Highway Projects[J];Journal of Beijing University of Technology;2007-11
2 ZHANG Hai-bin1,XU Jian-ping2 (1.Chelbi Engineering Consultants Inc.Beijing 100029,China;2.Jiangxi Province Highway Management Department,Jiangxi Nanchang 330002,China);Exploration of Fiduciary Duty Istitution Biding for Highway Project[J];Journal of Chongqing Jiaotong University;2007-02
3 Feng Guoming;Brief Analysis of Management Mode of Acting Establishing System of Merchant Construction Item of Express Highway[J];Urban Roads Bridges & Flood Control;2005-03
4 LIU Dong1,YANG Zhen-kun2,DONG Shu-jie3,MENG Fan-jun4(1. Water Conservancy College, Northeast Agricultural University, Harbin Heilongjiang 150030, PRC;2. Fujin Agricultural Development Office, Fujin Heilongjiang 156100, PRC;3. Suihua Agricultural Development Office, Suihua Heilongjiang 152000, PRC;4. Mulan Agricultural Development Office, Mulan Heilongjiang 151900, PRC );The risk evaluation of the town water supply BOT project in China based on analytic hierarchy process method[J];Journal of Northeast Agricultural University;2005-02
5 GUAN Zhi-min , ZHOU Hong-bo, MA Qin-hai (School of Business Administration, Northeastern University, Shenyang 110004, China.;Evaluation Selection Based on Fuzzy MCDM for Locating Distribution Centers[J];JOURNAL OF NORTHEASTERN UNIVERSITY;2005-08
6 YAN Li-jun1,2,YANG Zhong-zhen3,LIU Chong4,KANG Hai-gui1(1.School of Civil and Hydraul.Eng.,Dalian Univ.of Technol.,Dalian 116024,China;2.Dalian Munic.Commun.Bur.,Dalian 116021,China;3.School of Traffic Eng.and Logistics,Dalian Maritime Univ.,Dalian 116026,China;4.Zhejiang Prov.Plan Des.& Res.Inst.of Commun.,Hangzhou 310006,China);Study of optimization of scale and distribution of intermediate nodes in city logistics network[J];Journal of Dalian University of Technology;2007-03
7 Deng Wei; Wang Wei(Transportation Engineering Research Institute, Southeast University, Nanjing 210018);The Framework of Developing the Integrated Systems of Highway Network Planning,Engineering Feasibility Study and Management[J];JOURNAL OF SOUTHEAST UNIVWRSITY;1996-02
8 ZHANG Chang xing, DANG Yan zhong (Institute of Systems Engineering,Dalian University of Technology,Dalian 116024,China);A Distribution Network Designing Model with Consideration of Inventory Control — LIM[J];Systems Engineering;2003-02
9 YAN Dong-mei,LI Min-qiang,KOU Ji-song(School of Management,Tianjin University,Tianjin 300072,China);Dynamic Location of Logistic Centers When Customer Demand Is Varied with Time[J];Systems Engineering;2005-06
10 TONG Ze-hong,LI Xiao(Central Financial and Economic University,Beijing 100081);THE UTILIZATION OF BOT MODEL IN CITY SEWAGE TREATMENT[J];Northern Economy and Trade;2003-03
【Secondary Citations】
Chinese Journal Full-text Database 1 Hits
1 ZHU Kangwu1,CAO Pin2,LE Wenlong3 (1.School of Economics and Management of Tongji University, Shanghai 200092, 2.Xi'an University of Science and Technology, Xi'an 710054; 3.Quality Audit Bureau for Construction Engineering, Wenling 317500);Agent Construction Management Model for Mega-Construction Project[J];Optimization of Capital Construction;2003-04
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved