Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《》 2002-02
Add to Favorite Get Latest Update

Safety Construction Technologies for Tunnel beneath the Building

Lin Cunyou 1,2 Wu Li 1 Li Peng 1( 1.Faculty of Engineering, China University of Geosciences,Wuhan 430074; 2.No.4 Section,No.14 Engineering Bureau,China Railway Co.,Linyi 276003)  
As the second longest tunnel along the Yuhuai Railway Lines, Wulong Tunnel is one of the key constructions.Its exit,D 2K197+908~+990,goes through Chongqing Huibang Pharmacy Factory which is an important enterprise.D 2K197+960~+990 section is underneath the main building and bounding wall of the Factory.In order to guarantee the safety, the precise design and construction methods have to be applied.This paper introduces the construction environment,design and tunneling methods for tunnel beneath buildings.
【CateGory Index】: U455.4
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 XIE Tao,YUAN Wenzhong,JIANG Zhezhong,TIE Huixia(College of Civil Engineering,Southwest Jiaotong University,Chengdu610031,China);Pile pulling model test study of rock-socketed piles[J];Building Science Research of Sichuan;2002-04
2 JIANG Zhe zhong,XIE Tao (College of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China);Study on the pile bearing behavior of vast-scale pile group under vertical load[J];Building Science Research of Sichuan;2003-01
3 ZHANG Yuming,YUE Qiang(College of Water Conservancy and Civil Engineering,Shandong Agricultural University,Taian 271018,China);Application of the multi-parameter synthetic analysis method in the foundation pile ultrasonic detection[J];Sichuan Building Science;2010-02
4 WANG Qi-dong(Anqing Institute of Reconnaissance and Mapping, Anqing 246001,China);ENGINEERING GEOLOGICAL FEATURES OF LOOSE SANDSTONE WHILE RED SANDSTONE IS USED AS RETAINING LAYER OF ARTIFICIAL EXCAVATION HOLE PILE[J];Geology of Anhui;2004-04
5 Qi Yongzheng1,Wang Lingsong2,Xu Wei3 (1. Nanjing Hydraulic Research Institute,Nanjing 210029,China; 2. Magang (Group) Holding Ltd,Ma'anshan 243003,China; 3. CCCC Third Harbor Consultants Co.,Ltd,Shanghai 200232,China);Application of Anchor Static Jacked Pile in Underpinning and Strengthening of Foundation of an Old Factory Building[J];Anhui Architecture;2007-04
6 Wang Genmiao (Anhui Highway Engineering Supervision Co., Ltd., Hefei 230031, China);Design and Application of Steel Sheet Piling Cofferdam in Water[J];Anhui Architecture;2008-04
7 YU Long(Anhui Water Installation and Construction Development Co.,Ltd,Hefei 230022,China);On construction method of steel sheet pile cofferdams and control measures[J];Journal of Anhui Technical College of Water Resources and Hydroelectric Power;2010-04
8 ZHOU Gang et al;Method for Calculation of Single Pile Settlement by Mindlin Stress Solution[J];Underground Space;2001-03
9 RUAN Chang qin;Discussion on Some Problems in Design of Steel-tube Piles[J];Underground Space;2003-01
10 WANG Wei,HAN Yang,ZHAO Yue-ping(Department of Civil Engineering,Henan University of Technology,Zhengzhou 450052,P.R.China);Analysis of Optimal Selection of Pile Foundation with TOPSIS Method and Realization of Matlab Programming[J];Chinese Journal of Underground Space and Engineering;2006-05
China Proceedings of conference Full-text Database 4 Hits
1 ZHU Kui~1,XU Ri-qing~1,SU Xiao-zhang~2,ZHOU Peng-fei~2 (1.Department of Civil Engineering,Zhejiang University,Hangzhou 310027,China;2.Wenzhou University,Wenzhou 325000,China);Comparative research on load transfer behavior of rigid pile and flexible pile[A];[C];2007
2 ~*N.Zhuang~1,K.Z.Zhu~2,Kan Erlin~3 (1.College of Harbor,Coastal and Offshore Engineering,Hohai University,Jiangsu Nanjing 210098;2.Civil Engineering Department of Guilin University of Technology,Guangxi Guilin 541004;3.Shanghai ShenYuan geotechnical co.ltd shanghai 2000113);RESEARCH ON THE SIMPLE CALCULATION MODEL OF PILE NEGATIVE FRICTION[A];[C];2010
3 Shen Xiaoxiao Yu Shenjun (No.125 Exploration Team,Hubei Bureau of Coal Geological Exploration,Yichang,Hubei 443003);Measures to Prevent Underwater Concrete Injection Quality Accident[A];[C];2007
4 LU Xinya~①ZHAN Song~②(①Guangzhou Dijian technology LTD.,Guangzhou 510507)(②Guangzhou highway survey,plan and design institute,Guangzhou 510507);TO AVOID DANGEROUS CONSTRUCTION—A DISCUSSION ON BASIC THEORY OF FOUDATION ISSUE[A];[C];2006
【Co-references】
Chinese Journal Full-text Database 1 Hits
1 Zhou Yuhong, Zhao Yanming, Cheng Chongguo(Dept. of Civil Eng., Logistic Engineering University, Chongqing 400041 China) (Chongqing Highway Institute of Communications Ministry, Chongqing 400067 China);OPTIMUM ANALYSIS ON THE CONSTRUCTION PROCESS FOR JOINT ARCH TUNNELS IN PARTIAL PRESSURE[J];Chinese Journal of Rock Mechanics and Engineering;2002-05
【Secondary References】
Chinese Journal Full-text Database 4 Hits
1 ZHANG Yong-xing , WANG Gui-lin (Civil Engineering Faculty of Chongqing University, Chongqing 400045, China);STABILITY ANALYSIS METHOD AND ITS APPLICATION IN HIGH-RISE BUILDING WITH ROCK CAVERN FOUNDATION[J];Engineering Mechanics;2007-S2
2 XU Daihong1,LIU Chengyu2(1.China Railway No.2 Engineering Group Co.,Ltd.,Chengdu 610081,China;2.Fuzhou University,Fuzhou 350108,China);Deformation Control Technology for Shallow-covered Double-Track Railway Tunnels underneath Buildings[J];Tunnel Construction;2010-05
3 GUO Hai-man1,LIU Cheng-yu2,YANG Jian-cheng1,LIN Hu-wang1 (1.Engineering Construction Headquarters of Longyan-Xiaman Railway,Longyan,Fujian 364000,China;2.Fuzhou University,Fuzhou,Fujian 350108,China);Researches on the Stability of Buildings above Shallow-buried Tunnel[J];Journal of Railway Engineering Society;2009-07
4 LIU Feng1-3,NIAN Ting-kai1,2,YANG Qing1,2,LUAN Mao-tian1,2(1.State Key Laboratory of Coastal and Offshore Engineering,Dalian University of Technology,Dalian 116024,China;2.Institute of Geotechnical Engineering,School of Civil and Hydraulic Engineering,Dalian University of Technology,Dalian 116024,China;3.Institute of Dam Monitoring Technology,School of Science and Research,China Water Northeastern Investigation,Design and Research Co.Ltd,Changchun 130061,China);Research on influence of tunneling on working performance of adjacent pile foundation[J];Rock and Soil Mechanics;2008-S1
China Proceedings of conference Full-text Database 2 Hits
1 Zhang yongxing~1 Wang guilin~2(Civil engineering faculty of Chongqing university,Chongqing,400045);APPLICATION AND METHODS FOR STABILITY ANALYSIS OF HIGH-RISE BUILDING ROCK CAVERN FOUNDATION[A];[C];2007
2 LIU Feng~(1-3) NIAN Ting-kai~(1,2) YANG Qing~(1,2) LUAN Mao-tian~(1,2) (1. State Key Laboratory of Coastal and Offshore Engineering, Dalian University of Technology, Dalian I 16024, China; 2. Institute of Geotechnical Engineering, School of Civil and Hydraulic Engineering, Dalian University of Technology, Dalian 116024, China; 3. Institute of Dam Monitoring Technology, School of Science and Research. China Water Northeastern Investigation. Design and Research Co. Ltd. Changchun 130061. China);Research on influence of tunneling on working performance of adjacent pile foundation[A];[C];2008
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved