Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Coal Technology》 2006-08
Add to Favorite Get Latest Update

Dispose of Malfunction for Readheader Hydroalie Systerm

GAO Fei,XU Kai-guo(Jiamusi Coal Mine Machinery Co.Ltd,Jiamusi 154003,China)  
This paper introduces theory and loop of hydraulic system.Analyse the malfuncdon for roadheader hydroalic system,and analyse hydraulic system,supply some way to dispose malfunction,it is advantageus to consumer for the dispose of malfunction.
【CateGory Index】: TD421.5
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 SHEN Guo-cai,SHEN Zhao-zhen(I Machine and Electron Engineering High Vocation School of Xuzhou,Xuzhou 221011,China);Fault Analysis and Elimination of Hydraulic System for Roadheader[J];Coal Mine Machinery;2009-05
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Li Liqing et al.;The influence of electrical pulse parameters on the technology performance of mixed-air EDM[J];Electromachining & Mould;2002-04
2 Li Zhongfu;THE CALCULATION AND ANALYSIS OF THE BALANCE BETWEEN THE MOMENTS AT CYLINDER OF A PISTON PUMP[J];;1988-04
3 SU Qi tang (Department of Mechanical Engineering,GUT,Guiyang 550003);Analysis of the Structure and Control of Powered Support with Double Telescoping Type Support[J];JOURNAL OF GUIZHOU UNIVERSITY OF TECHNOLOGY(NATURAL SCIENCE EDITION);2000-02
4 CHEN Qi mei, HU Ying xi (School of Resources and Environment,GUT,Guiyang 550003,China);The Analysis of Differential Control Circuit of Hydraulic Pressure Cylinder and Its Parameter[J];Journal of Guizhou University of Technology(Natural Science Edition);2001-01
5 PENG Xiu-ying,LU Fei-ping(College of Mechanical Engineering and Automation,Guizhou University,Guiyang 550003,China);The Value of Pressure Adjusting and its Defining Method of Relief Valve[J];Journal of Guizhou University of Technology(Natural Science Edition);2005-05
6 Chen Lunjun(Department of Mining Engineering .Guizhou Institute of Technology );RESEARCH ON THE RELIABILITY OF THE BUCKLING STABILITY OF HYDRAULIC SUPPORT LEG[J];;1995-03
7 Pang Xiuying (Department of Mining Engineering,Guizhou Institute of Technology );AN ANALYSIS OF THE LOADING FORMS FOR THE HYDRAULIC ELEMENT LIFE TEST BED[J];;1995-03
8 Liu Tilong; Wei Xiaoling(Dept.of Machanical Engineering, HIAST, Handan 056038);Analysis on Runoff-pressure Characteristic of Preguiding Overflow Valve[J];JOURNAL OF HEBEI INSTITUTE OF ARCHITECTURAL SCIENCE AND TECHNOLOGY;1999-01
9 Hou Bo (Dept. of Mechanical Engineering);The Analysis for the Twisting Vibration of a Cylinder in the Axial Plunger Pump with a Oblique Axis[J];;1992-Z1
10 HOU Bo(Dept.of Mechnical Engineering,Anhui University of Science and Technology,Huainan Anhui 232001,China);Study on the Plug-in Valve Application in Controlling Electric Hydraulic Support[J];Journal of Anhui University of Science and Technology(Natural Science);2006-03
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 XI Zhong-wei (Zhongtte 15th Bureau Group Limited Company, Luoyang, Henan 471013, China);Advance of Transport Tunnel Engineering and Construction Technique in China[J];Journal of Beijing Polytechnic University;2005-02
2 Wang Zhongcheng (Dept. of Hydraulic Engineering, Changchun Institute of Technology);Application of TBM in Wanjiazhai tunnel construction[J];Journal of Changchun Institute of Technology;2001-01
3 Chengjue Mao;The application prospective of whole-section rock tunneler[J];Construction Machinery and Equipment;1996-08
4 ;Determination of Models and Main Parameters of Full Section Rock Tunneller[J];Construction Machinery and Equipment;2003-01
5 ;How to Increase Work Time Utilization for Tunnel Boring Machinery[J];Construction Machinery and Equipment;2004-06
6 ZHANG Zhaohuang YE Dinghai SUN Mengli;TBM’s Work in Tough Layer[J];Technology & Management for Construction Machinery;2005-05
7 MAO Chengjue;Probing into Selecting Type of Full Face Rock TBM[J];Construction Machinery Technology & Management;2006-08
8 WANG Man zeng,XU Ming xin (Mechanical Engineering Department of Shijiazhuang Railway Institute, Shijiazhuang 050043,China);Design and development of trouble diagnosis expert system for TBM[J];Construction Machinery;2003-11
9 LIU Dong-liang;Application of electro-hydraulic ratio technology in thrust system of shield machine[J];Construction Machinery;2005-08
10 ;Whole Structure and Analysis of All Cross Section Tunnel Borer TB880E[J];CONSTRUCTION MACHINERY;1998-05
【Secondary References】
Chinese Journal Full-text Database 1 Hits
1 MAO Hao-xi(Vocational Technology College of Foshan,Foshan 528237,China);Research Based on Acceleration Instrument Mechanical Boring Machine Attitude Control[J];Coal Mine Machinery;2008-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved