Direct calculation of critical depth of horseshoe section tunnel

Zhang Kuandi1,2,L Hongxing1,Chen Junying1 (1. College of Water Conservancy and Architectural Engineering,Northwest Agriculture and Forestry University,Yangling 712100,China; 2. State Key Laboratory of Soil Erosion and Dryland Farming on the Loess Plateau,Institute of Soil and Water Conservation,Chinese Academy of Sciences and Ministry of Water Resources,Yangling 712100,China)  
Horseshoe section tunnel is a common type in the free-flow tunnel. There is no analytical expression to solve the critical depth of horseshoe section tunnel under free flow. The traditional solving methods,such as trial method and chart method,are very complicated with low precision. In this study,by mathematical transformation of critical flow equation of horseshoe section tunnel,the relationship between the dimensionless parameters and relative critical depth was analyzed and simulated. Using the gradual optimization and fitting principle,a direct formula for calculating the critical depths of standard Ⅰ-type and Ⅱ-type horseshoe section tunnel was established. Results of the example calculation and error analysis show that the maximum relative error of critical depth is 0.8%,in agreement with the application scope of engineering. The characteristics of this formula is exact and simple,which supplies a reference to manual compilation of engineering design and hydraulic design.
【Fund】: 国家973计划课题(2007CB407201);; 国家自然科学基金重点项目(40335050);; 西北农林科技大学创新团队建设计划(01140202);; 黄土高原土壤侵蚀与旱地农业国家重点实验室基金项目(10501-182)
【CateGory Index】: TV135
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 3 Hits
1 Zhao Yanfeng1,2,Wang Zhengzhong1,2,Lu Qin1 (1.College of Water Resources and Architectural Engineering,Northwest Agriculture and Forestry University,Yangling 712100,China;2.Reseach Center of Water Engineering Safety and Disaster Prevention,Northwest Agriculture and Forestry University,Yangling 712100,China);Formula for direct calculation of contracted depth of channel with trapezoidal section[J];Transactions of the Chinese Society of Agricultural Engineering;2009-08
2 Zhang Kuandi1,Lü Hongxing1,Wang Guangqian 2,Fu xudong 2 (1.College of Water Resources and Architectural Engineering,Northwest Agriculture and Forestry University,Yangling 712100,China; 2.State Key Laboratory of Hydroscience and Engineering,Department of Hydraulic Engineering,Tsinghua University, Beijing 100084,China);Direct calculation method for normal depth of arched section tunnel[J];Transactions of the Chinese Society of Agricultural Engineering;2009-11
3 ZHANG Kuan-di1,2,Lü Hong-xing1,ZHANG Xin-yan1(1 College of Water Resources and Architectural Engineering,Northwest A&F University,Yangling,Shaanxi 712100,China;2 State Key Laboratory of Soil Erosion and Dryland Fariming on Loess Plateay,Institute of Soil and Water Conservation,CAS,Yangling,Shaanxi 712100,China);Approximate method of calculating critical water depth to arched section tunnel[J];Journal of Northwest A & F University(Natural Science Edition);2009-11
【Citations】
Chinese Journal Full-text Database 3 Hits
1 LU Hong xing,XIN Quan cai,HUA Li feng (College of Water Conservancy and Architectural Engineering, Northwest Sci Tech University of Agriculture and Forestry,Yangling 712100,China);Calculation on normal depth of horseshoe cross section by iterative method[J];Journal of Yangtze River Scientific Research Institute;2001-03
2 MA Jiming, LIANG Haibo, LIANG Yuanbo Department of Hydraulic and Hydropower Engineering, Tsinghua University, Beijing 100084, China;Critical flow in city gate and horseshoe conduit[J];JOURNAL OF TSINGHUA UNIVERSITY(SCIENCE AND TECHNOLOGY);1999-11
3 WANG Zhengzhong 1,2,CHEN Tao 1, LU Qin 1, ZHANG Xudong 1(1. School of Water Conservancy and Architectural Engineering, Northwest Sci-tech University of Agriculture and Forestry, Yangling 712100;2. State Key Laboratory of Forzen Soil Engineering, Lanzhou 730000);The direct solution on critical depth of horseshoe section tunnel[J];Journal of Hydroelectric Engineering;2005-05
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 LV Hong-xing(College of Water Conservancy and Architectural Engineering,Northwest Sci-Tech University of Agriculture and Forestry, Yangling, 712100, China);Calculation on critical depth of horseshoe cross-section by iterative method[J];Journal of Yangtze River Scientific Research Institute;2002-03
2 ZHAO Yan-feng,SONG Songbai,MENG Qin-qian(College of Water Resources and Architectural Engineering,Northwest A&FUniversity,Yangling 712100,China);Approximate Method Calculating Critical Water Depth in Common City-opening Shaped Cross-section[J];Journal of Yangtze River Scientific Research Institute;2008-04
3 Wu Junjun,Xu Xiaojian,Ni Baoyan;Calculation Method of Critical Water Depth in City-gate Section of Water Conveying Tunnel[J];Urban Roads Bridges & Flood Control;2007-09
4 WANG Shun jiu 1, HOU Yu 2, ZHANG Xin li 3, DING Jing 1 (1. College of Hydropower Engineering, Sichuan University, Chengdu 610065, China; 2. Department of Geography, Zhongshan University, Guangzhou 510275, China; 3. Business school of Sichuang u;Genetic Algorithm for Calculating Normal Water Depth of Horseshoe Cross Section[J];Irrigation and Drainage;2002-03
5 Zhao Yanfeng1,2,Wang Zhengzhong1,2,Lu Qin1 (1.College of Water Resources and Architectural Engineering,Northwest Agriculture and Forestry University,Yangling 712100,China;2.Reseach Center of Water Engineering Safety and Disaster Prevention,Northwest Agriculture and Forestry University,Yangling 712100,China);Formula for direct calculation of contracted depth of channel with trapezoidal section[J];Transactions of the Chinese Society of Agricultural Engineering;2009-08
6 Zhang Kuandi1,Lü Hongxing1,Wang Guangqian 2,Fu xudong 2 (1.College of Water Resources and Architectural Engineering,Northwest Agriculture and Forestry University,Yangling 712100,China; 2.State Key Laboratory of Hydroscience and Engineering,Department of Hydraulic Engineering,Tsinghua University, Beijing 100084,China);Direct calculation method for normal depth of arched section tunnel[J];Transactions of the Chinese Society of Agricultural Engineering;2009-11
7 WANG Zhengzhong~1,2, CHEN Tao~1, ZHANG Xinmin~3, ZHANG Xudong~1(1. College of Water Conservancy and Architectural Engineering, Northwest Sci-Tech University of Agriculture and Forestry, Yangling 712100, China; 2. State Key Laboratory of Frozen Soil Engineering, The Chinese Academy of Sciences, Lanzhou 730000, China; 3. Gansu Water Conservancy Science Research Institute, Lanzhou 730000, China);Approximate solution for the critical depth of a arched turnel[J];Journal of Tsinghua University(Science and Technology);2004-06
8 LI Ruo-dong (Department of Hydroelectric Engineering,Qinghai University, Xining 810016,China);The application of combined discharge hydraulic project of construction models and software[J];Journal of Qinghai University;2005-01
9 WU Yi-feng~1,YU Yao~2,HU Zhi-gen,LIU Quan uhan University,Wuhan,Hubei 430072 China; 2.Kunming Hydroelectric Investigation & Design Institute, Kunming,Yunnan 650051,China);Computation Models & It's Software Development for Combined Discharge of Hydraulic Project Multiple River Diversion Works[J];Design of Hydroelectric Power Station;2005-01
10 WANG Zhengzhong 1,2,CHEN Tao 1, LU Qin 1, ZHANG Xudong 1(1. School of Water Conservancy and Architectural Engineering, Northwest Sci-tech University of Agriculture and Forestry, Yangling 712100;2. State Key Laboratory of Forzen Soil Engineering, Lanzhou 730000);The direct solution on critical depth of horseshoe section tunnel[J];Journal of Hydroelectric Engineering;2005-05
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 Wang Zhengzhong 1, Lei Tianchao 2, Song Songbai 1, Wu Junchang 2 1. Water Conservancy and Construction Engineering Institute, Northwest Agriculture University, Yangling 712100 2. Mangement Bureau of Jinghui Canal, shaanxi Province, Sanyuan 713800;An Iterative Method Calculating Water Depth at Vena Contracta in Trapezoidal Cross section[J];JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTITUTE;1997-03
2 ZHAO Yan-feng,WANG Zheng-zhong,XU Jing-hui,LU Qin(College of Water Resources and Architectural Engineering,Northwest A&F University,Yangling 712100,Shaanxi Province,china);Application of Matlab Language in Hydraulic Calculation of Open Trapezoidal Channel[J];Water Saving Irrigation;2008-04
3 Wen Hui~1 Li Fengling~1 Ou Junli~2 Yao Hui~2 (1.Maoming University,Maoming 525000,China;2.Guangdong Water & Power Design Institute,Guangzhou 510170,China);Approximate solution of the normal depth inside tunnel with arch cross-section[J];Water & Wastewater Engineering;2007-07
4 Zhang Kuandi,LüHongxing,Zhao Yanfeng (College of Water Conservancy and Architectural Engineering,Northwest Agriculture and Forestry University,Yangling 712100,China);Direct calculation for normal depth and critical depth of circular section tunnel under free flow[J];Transactions of the Chinese Society of Agricultural Engineering;2009-03
5 MA Jiming, LIANG Haibo, LIANG Yuanbo Department of Hydraulic and Hydropower Engineering, Tsinghua University, Beijing 100084, China;Critical flow in city gate and horseshoe conduit[J];JOURNAL OF TSINGHUA UNIVERSITY(SCIENCE AND TECHNOLOGY);1999-11
6 WANG Zhengzhong~1,2, CHEN Tao~1, ZHANG Xinmin~3, ZHANG Xudong~1(1. College of Water Conservancy and Architectural Engineering, Northwest Sci-Tech University of Agriculture and Forestry, Yangling 712100, China; 2. State Key Laboratory of Frozen Soil Engineering, The Chinese Academy of Sciences, Lanzhou 730000, China; 3. Gansu Water Conservancy Science Research Institute, Lanzhou 730000, China);Approximate solution for the critical depth of a arched turnel[J];Journal of Tsinghua University(Science and Technology);2004-06
7 ZHAO Yan-feng,WANG Zheng-zhong,ZHANG Kuan-di (College of Water Resources and Architectural Engineering,Northwest A&F University,Yangling 712100,China);Direct calculation method for the critical depth of an open trapezoidal channel[J];Journal of Shandong University(Engineering Science);2007-06
8 YANG Ke-jun, CAO Shu-you, LIU Xing-nian (State Key Hydraulics Laboratory of High Speed Flows, Sichuan University,Chengdu 610065,China);Comparison of methods predicting normal depth in compound channels[J];Advances In Water Science;2005-02
9 MA Jiming 1, XIE Shengzong 2, LIANG Yuanbo 1 (1 Tsinghua University, Beijing\ 100084,China; 2 China Institute of Water Resources and Hydropower Research, Beijing\ 100038,China);Hydraulic jumps in rectangular conduit with circular upper wall and horseshoe tunnel[J];JOURNAL OF HYDRAULIC ENGINEERING;2000-07
10 Hao Shutang(Dept. of Environmental Engineering, Lanzhou Railwey College);Calculation and discussion of critical depth for ladder-canal[J];JOURNAL OF HYDRAULIC ENGINEERING;1994-08
【Secondary Citations】
Chinese Journal Full-text Database 3 Hits
1 LV Hong-xing(College of Water Conservancy and Architectural Engineering,Northwest Sci-Tech University of Agriculture and Forestry, Yangling, 712100, China);Calculation on critical depth of horseshoe cross-section by iterative method[J];Journal of Yangtze River Scientific Research Institute;2002-03
2 MA Jiming, LIANG Haibo, LIANG Yuanbo Department of Hydraulic and Hydropower Engineering, Tsinghua University, Beijing 100084, China;Critical flow in city gate and horseshoe conduit[J];JOURNAL OF TSINGHUA UNIVERSITY(SCIENCE AND TECHNOLOGY);1999-11
3 Wang Zhengzhong(Northwest Agriculture University) Yuan Si(Tsing hau University) Wu Chenglie(Water Conservancy Bureau of Shanxi Province);A final inquiry on a formula for calculating critical depth of open channel with trapezoidal cross section[J];JOURNAL OF HYDRAULIC ENGINEERING;1999-04
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved