Design of Anqing Changjiang River Railway Bridge

XIAO Hai-zhu,XU Wei,GAO Zong-yu(China Zhongtie Major Bridge Reconnaissance & Design Institute Co.,Ltd.,Wuhan 430050,China)  
Anqing Changjiang River Railway Bridge will serve as a crossing for both the Nanjing-Anqing Intercity Railway and Fuyang-Jingdezhen Railway over the Changjiang River.The total length of the Bridge is 2 996.8 m and the main bridge is a six-span continuous steel truss girder cable-stayed bridge with span arrangement(101.5+188.5+580+217.5+159.5+116) m.The main girder for the main bridge is composed of three main trusses that are 15 m in height and 14.5 m in panel length.The deck is to be provided with the orthotropic steel plates.A pylon of the bridge is 210 m high,resting on the frictional pile foundation made up of 37 numbers of 3.0 m bored piles,respectively 108 m or 113 m in length.The stay cables are of parallel steel wire strands,which are to be arranged in three spatial cable planes in fan shape.The main girder will be erected by the double cantilever method and will be closed in midspan.The calculation and analysis of the static and dynamic load indicate that the designed bridge has good rigidity and favorable train running property.
【CateGory Index】: U448.13
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 10 Hits
1 FAN Xue-mei;NONG Dai-pei;CAO Shi-yun;The Second Engineering Co.,Ltd.,China Railway Major Bridge Engineering Group;Construction Headquarters of Anqing Changjiang River Railway Bridge,China Railway Major Bridge Engineering Group;First Section,Construction Headquarters of Anqing Changjiang River Railway Bridge,China Railway Major Bridge Engineering Group;;Construction Quality Control for Large Diameter and Very Long Bored Piles in Deep Water[J];World Bridges;2013-05
2 LI Wei;ZHANG Qiang;China Railway Major Bridge Reconnaissance and Design Institute Co.,Ltd.;;Study of Anchoring Parameters Design for Stay Cables of Tongling Changjiang River Rail-cum-Road Bridge[J];World Bridges;2013-06
3 CAO Hai-shun,CHEN Wei,PENG Jun,ZHOU Liang(Shanghai Urban Construction Design & Research Institute,Shanghai 200125,China);Design of All-Welded Hybrid Steel Structure Bridge of Continuous Truss Girder and Truss Arch[J];Bridge Construction;2010-04
4 CHEN Xiang,XIAO Hai-zhu(China Railway Major Bridge Reconnaissance & Design Institute Co.,Ltd.,Wuhan 430056,China);Design of Substructure of Anqing Changjiang River Railway Bridge[J];Bridge Construction;2010-05
5 LIU Ai-lin,NONG Dai-pei(Construction Headquarters of Anqing Changjiang River Bridge on Nanjing-Anqing Railway, China Railway Major Bridge Engineering Group Co.,Ltd.,Anqing 246008,China);Design and Construction of Mooring System for Cofferdam of Pylon Pier No.3 of Anqing Changjiang River Railway Bridge[J];Bridge Construction;2011-06
6 WANG Shui-qing1,NONG Dai-pei2(1.Ning′an Railway Co.,Ltd.,Wuhu 241000,China;2.Construction Headquarters of Anqing Changjiang River Railway Bridge,China Railway Major Bridge Engineering Group Co.,Ltd.,Anqing 246008,China);Techniques of Air Bag Method Launching for Huge Circular Steel Cofferdam of Pier No.3 of Anqing Changjiang River Railway Bridge[J];Bridge Construction;2012-02
7 XU Ke-ying,XIAO Hai-zhu(China Railway Major Bridge Reconnaissance & Design Institute Co.,Ltd.,Wuhan 430056,China);Analysis of Force Conditions of Floor System of Main Bridge of Anqing Changjiang River Railway Bridge[J];Bridge Construction;2012-03
8 Liu Ailin(The Engineering battalion for Anqing Yangtze River Bridge of Nanjing-Anqing Railway,China Railway Major Bridge Engineering Group Co.,Ltd,Anqing 246008);Construction Technology of Foundation with Deep Water of Main Pylon Pier of Anqing Yangtze River Bridge in Nanjing-Anqing Railway[J];Railway Standard Design;2012-02
9 NONG Dai-pei1,JI Yue-hua2,XU Bing-fa1(1.Construction Headquarters of Anqing Changjiang River Railway Bridge,China Railway Major Bridge Engineering Group Co.,Ltd.,Anqing 246008,China;2.China Railway Major Bridge Engineering Group Co.,Ltd.,Wuhan 430050,China);Construction Scheme and Key Construction Techniques for Large Deepwater Foundations of Main Piers of Anqing Changjiang River Railway Bridge[J];Bridge Construction;2012-06
10 ZHENG Da-chao,TIAN Ji-kai(Division of Construction Design Undertakings,China Railway Major Bridge Engineering Group Co.,Ltd.,Wuhan 430050,China);Positioning Techniques for Steel Cofferdam of Main Pier of Anqing Changjiang River Railway Bridge Under Condition of Deepwater and Geology Without Overburden[J];Bridge Construction;2012-06
【Citations】
Chinese Journal Full-text Database 1 Hits
1 XIAO Hai-zhu,LIU Cheng-yu,YI Lun-xiong(China Zhongtie Major Bridge Reconnaissance & Design Institute Co.,Ltd.,Wuhan 430050,China);Design and Study of Orthotropic Railway Steel Deck of Nanjing Dashengguan Changjiang River Bridge[J];Bridge Construction;2009-04
【Co-citations】
Chinese Journal Full-text Database 8 Hits
1 XU Hai-ying,CHEN Jin-zhou (Bridge Science Research Institute Ltd.,China Zhongtie Major Bridge Engineering Group,Wuhan 430034,China);Fatigue Test Study of Model for Connection Detail of Integral Deck Structure Subjected to Two-Way Tensioning[J];Bridge Construction;2009-S2
2 XIAO Hai-zhu,YI Lun-xiong(China Zhongtie Major Bridge Reconnaissance & Design Institute Co.,Ltd.,Wuhan 430050,China);Design of Superstructure of Main Bridge of Nanjing Dashengguan Changjiang River Bridge[J];Bridge Construction;2010-01
3 GAO Zong-yu(China Railway Major Bridge Reconnaissance & Design Institute Co.,Ltd.,Wuhan 430050,China);Technical Innovations of Zhengzhou Huanghe River Rail-cum-Road Bridge[J];Bridge Construction;2010-05
4 JIANG Hong-wei1,XU Yuan-xiao2(1.Center of Public Works Construction,Wuxi City,Jiangsu Province,Wuxi 214000,China;2.The2nd Engineering Co.,Ltd.,CCCC Second Harbor Engineering Co.,Ltd.,Chongqing 400042,China);Erection Techniques for Steel Girders of Jinkui Bridge in Wuxi[J];Bridge Construction;2011-04
5 XU Ke-ying,XIAO Hai-zhu(China Railway Major Bridge Reconnaissance & Design Institute Co.,Ltd.,Wuhan 430056,China);Analysis of Force Conditions of Floor System of Main Bridge of Anqing Changjiang River Railway Bridge[J];Bridge Construction;2012-03
6 FENG Pei,LI Feng-Qin (The Third Railway Survey and Design Institution Group Corporation,Tianjin 300142,China);Study on Structure Type of Main Span of Jinan Yellow River Highway-Railway Combined Bridge[J];Journal of Railway Engineering Society;2010-08
7 ZHANG Wen-hua (China Railway Siyuan Survey and Design Group Co.Ltd,Wuhan,Hubei 430063,China);Analysis and Design of Dongping Waterway Steel Trussed Arch Bridge with Double Arch Ribs on Guiyang-Guangzhou Railway[J];Journal of Railway Engineering Society;2011-06
8 Huang Naxin;Design on Main Part of Dongjiang South Super Large Bridge on Guangzhou-Dongguan-Shenzhen Urban Mass Transit[J];Railway Investigation and Surveying;2011-03
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 YU Mei1,2,LI Qiao1,LIAO Haili1(1.School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China;2.Chongqing Jiaotong University,Chongqing 400074,China);Stiffness configuration of multi-pylon cable-stayed bridges[J];Sichuan Building Science;2010-04
2 CHEN Kan,LIU Ping(Anqin Yangze River Highway Bridge Co.Ltd.,Anqin,246003,China);CONSTRUCTION TECHNOLOGY OF EXTRA LARGE AND DEEP WATER STEEL COFFERDAM OF ANQIN YANGTZE RIVER HIGHWAY BRIDGE[J];Journal of Anhui Institute of Architecture;2003-03
3 XIA Chaoyi,LEI Junqing(School of Civil Engineering,Beijing Jiaotong University,Beijing 100044,China);Analysis of Local Stress at Arch-Spring of Steel Box Stacked Tied Arch Bridge on Harbin-Dalian High-Speed Railway[J];Journal of Beijing Jiaotong University;2010-04
4 WANG Wen-hua,etc.(College of Construction Engineering,Jilin University,Changchun 130026,China);A design on bridge-type program of Songhua River bridge in Songyuan Longhua[J];Journal of Changchun Institute of Technology(Natural Sciences Edition);2010-02
5 LI Jie,LI Na (Zhengzhou University,Zhengzhou 450001);Fuzzy Mathematics Based Optimal Design of Bridge Structure[J];Journal of Yangtze University(Natural Science Edition) Sci & Eng V;2008-03
6 GU An bang, XU Jun lan (Department of Bridge & Structure Engineering, Chongqing Jiaotong University, Chongqing 400074, China);Structural analysis of short suspenders of half through or through arch bridge[J];Journal of Chongqing Jiaotong Institute;2002-04
7 TONG Hai-peng ,ZHANG Shi-kui (The 2th Department,China Second Harbor &Waterway Engineering Bureau,C hongqing 400042,China);Construction of approach bridge in Hangzhou Xiasha bridge[J];Journal of Chongqing Jiaotong University;2003-S1
8 ZENG De-rong,ZHANG Qing-min(School of Civil Chongqing Jiaotong University,Chongqing 400074,China);Study on the stability influence of the angle of toe-in of the arch rib[J];Journal of Chongqing Jiaotong University;2006-S1
9 TAO Neng-qian1,WANG Fu-min2(1.Chongqing Jiaotong University,Chongqing 400074,China;2.Chongqing Communications Research & Design Institute,Chongqing 400067,China);Study on Improving the Whole Rigidity of Prestressed Concrete Three-pylon Cable-stayed Spans[J];Journal of Chongqing Jiaotong University;2007-02
10 YANG Xuan,ZHOU Shui-xing(School of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,China);Method to Determine Construction Cable Tension Force of Cable-Stayed Bridge[J];Journal of Chongqing Jiaotong University(Natural Science);2008-01
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 YE Jianrong;XU Jiande;;Construction Technology for Steel Sheet Piling Cofferdams of Piers on Shallow Soil Covered Riverbed[J];Technology of Highway and Transport;2013-05
2 FAN Xue-mei;NONG Dai-pei;CAO Shi-yun;The Second Engineering Co.,Ltd.,China Railway Major Bridge Engineering Group;Construction Headquarters of Anqing Changjiang River Railway Bridge,China Railway Major Bridge Engineering Group;First Section,Construction Headquarters of Anqing Changjiang River Railway Bridge,China Railway Major Bridge Engineering Group;;Construction Quality Control for Large Diameter and Very Long Bored Piles in Deep Water[J];World Bridges;2013-05
3 WEI Sheng-xin;JIANG Jun-bo;CCCC Second Highway Consultants Co.,Ltd.;Road & Bridge South China Engineering Co.,Ltd.;;Construction Technique for Pylon Foundation in Deepwater Over-Inclined Bedrock without Overburden[J];World Bridges;2013-06
4 ;Construction scheme design and structural analysis of pile foundation in deepwater and bare rock[J];China Building Materials Science & Technology;2013-02
5 ;Quality control technology of Weihe bridge pier concrete cracking[J];China Building Materials Science & Technology;2013-02
6 WANG Shui-qing1,NONG Dai-pei2(1.Ning′an Railway Co.,Ltd.,Wuhu 241000,China;2.Construction Headquarters of Anqing Changjiang River Railway Bridge,China Railway Major Bridge Engineering Group Co.,Ltd.,Anqing 246008,China);Techniques of Air Bag Method Launching for Huge Circular Steel Cofferdam of Pier No.3 of Anqing Changjiang River Railway Bridge[J];Bridge Construction;2012-02
7 WANG Xiao-jing,MA Xing-zheng(The 2nd Engineering Co.,Ltd.,China Railway Major Bridge Engineering Group,Nanjing 210015,China);Design and Construction of Double Wall Steel-Boxed Cofferdam for Offshore Pile Cap[J];Railway Standard Design;2012-08
8 NONG Dai-pei1,JI Yue-hua2,XU Bing-fa1(1.Construction Headquarters of Anqing Changjiang River Railway Bridge,China Railway Major Bridge Engineering Group Co.,Ltd.,Anqing 246008,China;2.China Railway Major Bridge Engineering Group Co.,Ltd.,Wuhan 430050,China);Construction Scheme and Key Construction Techniques for Large Deepwater Foundations of Main Piers of Anqing Changjiang River Railway Bridge[J];Bridge Construction;2012-06
9 ZHENG Da-chao,TIAN Ji-kai(Division of Construction Design Undertakings,China Railway Major Bridge Engineering Group Co.,Ltd.,Wuhan 430050,China);Positioning Techniques for Steel Cofferdam of Main Pier of Anqing Changjiang River Railway Bridge Under Condition of Deepwater and Geology Without Overburden[J];Bridge Construction;2012-06
10 FAN Xue-mei1,NONG Dai-pei2(1.The 2nd Engineering Co.,Ltd.,China Railway Major Bridge Engineering Group,Nanjing 210015,China;2.Construction Headquarters of Anqing Changjiang River Railway Bridge, China Railway Major Bridge Engineering Group Co.,Ltd.,Anqing 246008,China);Improvement of Side Anchors of Cofferdams for Main Pier Foundations of Anqing Changjiang River Railway Bridge[J];Bridge Construction;2013-01
【Secondary Citations】
Chinese Journal Full-text Database 1 Hits
1 LUO Shuang-quan,YU Xiang-jun(The 2nd Engineering Co.,Ltd.,China Zhongtie Major Bridge Engineering Group,Nanjing 210015,China);Closure Techniques for South Side Span Steel Girder of Main Bridge of Dashengguan Changjiang River Bridge in Nanjing[J];Bridge Construction;2009-03
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved