Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Thermal Power Generation》 2000-06
Add to Favorite Get Latest Update

RELIALILTY BASED MAINTENANCE AND OPTIMIZED OPERATION OF LARGE FOSSIL-FLRED POWER UNITS

Tian Feng et al  
Two inportant aspects of modern large fossil-fired power units are maintenance and operation.The basic principle of reliability-centered maintenance and its application on large fossil-fired power units are discussed in this paper.It points out that the traditional system of maintenance should be transformed into the system guided by the reliability-centered maintenance theory.In addition,a new method for dispatching unit load based on economy and reliability is also presented.This method combines dynamic planning with optimized fuzzy-decision,considering the effects of safty and reliability theory in units′ load optimized dispatching.This study makes a new attempt for optimized dispatching load of large units.
【CateGory Index】: TB114
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved