Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Jiangsu Commercial Forum》 2015-09
Add to Favorite Get Latest Update

Game Analyzing Of Cost Allocation In The Construction Of Charging Pile Consortia On Shapley Value

Liu Juan-Juan;Cao Sheng-Lan;Research Institute Of Water Transport Economy Shanghai Maritime University;  
Electric vehicle manufacturer、power grid enterprise and residential property company, the three coalition construction mode not only has the theoretical basis, but also can overcome the shortcomings of power grid enterprise and electric vehicle makers construct alone. This consortia mode well meet the needs of the present charging pile construction and operation, but the mode have to solve a key problem--cost allocation. This paper analyzes game process between enterprises of electric vehicle charging pile co-construction. Using the shapley method of game theory, cost allocation methods are given, so as to design cost allocation mechanism better between enterprises of electric vehicle charging pile co-construction. At last, an instance is used to expounded the application of cost allocation, and propose several relevant advices for enterprises of electric vehicle charging pile construction to support the long existence of their cooperation.
【Fund】: 上海市哲学社会规划基金项目“新能源汽车电桩网络布局规划及其运营模式研究”(2014BGL018);; 上海海事大学研究生创新基金项目“基于合作博弈的电动汽车充电桩运营模式研究”(2014ycx010)
【CateGory Index】: F224.32;F426.61
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved