Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Water Resources and Power》 2011-09
Add to Favorite Get Latest Update

Comprehensive Risk Management of General Contractor of Hydropower EPC Project

ZHANG Jiancheng1,PENG Fanba2(1.Huaneng Lancang River Hydropower Corporation Limited,Kunming 672708,China;2.Hydro China Kunming Engineering Corporation,Kunming 650033,China)  
From the characteristics of EPC,this paper introduces the risk features of EPC mode and describes the connotation of comprehensive risk management.And then the risk of general contractor is analyzed from the perspective of comprehensive risk management.Finally,it sets up scientific,systemic and dynamic flowchart for general contractor controlling risk and integration mode of comprehensive risk management.Thus,it provides reference for general contractor managing the risk.
【CateGory Index】: F284
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 6 Hits
1 CHEN Zhi-hua~1,YU Hai-feng~2(1.Engineering College of Shanxi University,Taiyuan 030013,China;2.Coastal Real Estate Investment(China) Limited Company,Sengzhen 518033,China);EPC General Contract Project Risk Management Research[J];Journal of Electric Power;2006-04
2 YANG Xiao-ming,ZHOU Xu(School of Civil Engineering and Architecture of Central South University,Changsha 410075,China);Fuzzy Comprehensive Evaluation of Risk for EPC Contract Project[J];Journal of North China Institute of Water Conservancy and Hydroelectric Power;2008-05
3 Wang Feng-ming(Southeast Univeristy,Nanjing Jiangsu 210096);Cybernetics and Project Risk Management[J];Technoeconomics & Management Research;2008-03
4 ZHAO Jianjun,YANG Ping;Large Construction Project Risk-integrated Management by Taking the Owner as the Core[J];Construction Economy;2010-07
5 LIU Yongqiang1 ZHANG Hongrui2 QIAN Bijun1 (1.Colledge of Water Conservancy and Hydropower Engineering,Hohai University,Nanjing 210098,China;2.National Electric Yunnan Amo River Power Generation Limited,Kunming 650021,China);Research on Cost Risk Management of Water Conservancy Engineering Project Based on FAHP[J];Water Resources and Power;2009-04
6 WANG Hong-wei,SUN Jian-feng,WU Hai-xin,YU Jian-xing(School of Civil Engineering,Tianjin University,Tianjin 300072,China);Research on ERM system for major modern construction project[J];Water Resources and Hydropower Engineering;2006-02
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 CHANG Hong1,2,GAO Yun-Li3(1.Jilin univercity,Changchun 130026,Chian;2.Jilin Institute of Civil Engineering and Architecture, Changchun 130021,Chian;3.Department of Civil Engineering and Architecture Dalian Nationalities University,Liaoning Dalian 116600,China);MATRIX MOTHOD APPLICATION ON THE CIVIL ENGINEERING PROJECT MANAGEMENT[J];Low Temperature Architecture Technology;2009-02
2 YANG Xiao-ming,ZHOU Xu(School of Civil Engineering and Architecture of Central South University,Changsha 410075,China);Fuzzy Comprehensive Evaluation of Risk for EPC Contract Project[J];Journal of North China Institute of Water Conservancy and Hydroelectric Power;2008-05
3 WANG Hong-wei,YU Jian-xing(School of Civil Engineering,Tianjin University,Tianjin 300072,China);Research on ERM Method System of Ocean Engineering[J];Ocean Technology;2006-01
4 ZHAI Yong-jun,LU Hui-min(College of Civil Engineering,Southeast University,Nanjing 210096,China);The Integrated Risk Management Based on the Life Cycle of Engineering Project[J];Construction Management Modernization;2007-02
5 HUANG Heng-zhen(Sichuan College of Architectural Techonology,Department of Engineering Manegenment,Deyang,China 618000);Study on Engineering Risk Management in the Perspective of Complexity[J];Journal of Jilin Institute of Architecture & Civil Engineering;2010-01
6 Hu Zhi-guo;Analysis for the risk management of the general contract of EPC[J];Jilin Water Resources;2008-12
7 ZHANG Guo-zong1,2, CHEN Li-wen1 (1. School of Manage ment, Hebei University of Technology, Tianjin 300130, China; 2. Hebei General Hospital, Shijiazhuang Hebei 050000, China);Risk Integration Manages Large-scale Public Good Construction Project Entire Life Cycle Studying[J];Technoeconomics & Management Research;2010-01
8 LI Hai-ling1,2,SHI Ben-shan1(1.School of Economics and Management of Southwest Jiaotong University,Chengdu Sichuan 610031,China;2.School of Architecture and Civil Eng.of Xihua University,Chengdu Sichuan 610039,China);Research on Risk Evaluation of PFI Projects Based on Multi-angle of View[J];Technoeconomics & Management Research;2010-02
9 GAO Yunli, LI Hongnan, LI Ping;Research on Dynamic and Integrated Risk Management Pattern of Construction Projects[J];Construction Economy;2007-03
10 WANG Yong-qing;Exploration on road construction project risk management on the basis of whole process theory[J];Shanxi Architecture;2010-19
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 YE Ling~1,HU Xing-fu~2(1.Engineering and Technical School,Shandong University of Technology,Zibo 255000,China;2.Civil Engineering Department,Sichuan College of Architecture Technology,Deyang 618000,China);The fuzzy comprehensive appraisal method of industrial architecture plan[J];Sichuan Building Science;2006-02
2 GUAN Qing(School of Economics and Management,Southwest Jiaotong University,Chengdu 610081,China);The study of technological risk assessment in large-scale public building design projects based on rough set theory[J];Sichuan Building Science;2007-04
3 HUANG Hong fei,OU Guo li (College of Economics and Management, Northern Jiaotong University, Beijing 100044,China);Application of Game Theory on Bidding Decision Analysis[J];JOURNAL OF NORTHERN JIAOTONG UNIVERSITY;2000-03
4 Yu Jianxing,Li Cheng and Wang Guangdong;A New Method of Engineering System Risk Analysis Based on Process Analysis[J];Ship Engineering;2003-05
5 L Yue-jin, QIN Bo-ying, WANG Yu-yan(College Of Mathematics and Information Science, Guangxi University, Nanning 530004, China);A New Consistency Approximation and Regulating Method of Fuzzy Comparison Matrix[J];Journal of Chongqing Institute of Technology;2004-06
6 ;Analysis of Risk in EPC Contract Project[J];Power System Engineering;2005-02
7 Liu Erlie Cai Gengqian(School of Management,Tianjin University,300072);Engineering Project Integrated Management[J];Port Engineering Technology;2001-04
8 Zhu Qichao,Kuang Xinghua,Shen Yongping (Management School of National University of Defense Technology, Changsha 410073, China)[;Risk Matrix Method and Its Application in the Field of Technical Project Risk Management[J];Engineering Science;2003-01
9 ZHANG Lian-ying,GOUFO Yemtsa,YANG Xiang(Management School of Tianjin University,Tianjin 300072, China);Contractor's Risk Management under Conditions of Contract for EPC/Turnkey Project[J];China Harbour Engineering;2003-06
10 LIN Ting,CHANG Miao(Department of Environmental Science and Engineering,Tsinghua University,Beijing 100084,China);Risk Assessment and Control of Wastewater Treatment Plant BOT Projects Based on AHP[J];China Water & Wastewater;2007-16
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved