Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Construction Technology》 2011-01
Add to Favorite Get Latest Update

Integral Lifting Technology of Steel Roof in Chaoshan Airport Terminal

Zeng Lingquan,Guo Zhengxing,Luo Bin,Zhao Yu,Hu Mingpo(College of Civil Engineering,Southeast University,Nanjing,Jiangsu 210096,China)  
In construction of the steel roof in Chaoshan Airport,engineers adopt the construction technology of ground assembling,integral lifting each unit with hydraulic equipment,retrofitting at high altitude,which has the merits of simple construction instrument,assembling on the ground,high efficiency and safety.The design of integral lifting program of Chaoshan Airport is introduced,including analysis of lifting process,design of embedded parts for lifting,design of lifting shelf,checking of structure capacity,control measures of synchronizing lifting,which can guide the construction of this project effectively and safely.And the problems involved in the integral lifting process of large-span steel structure are discussed.
【CateGory Index】: TU758.11
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved