Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Construction Technology》 2011-11
Add to Favorite Get Latest Update

Construction Technology of Slurry and Anchor Joint of the New Precast Concrete Shear Wall Structure

Gu Chunming1,Guo Zhengxing2,Dong Niancai1(1.Nantong Construction General Contractor Co.,Ltd.,Haimen,Jiangsu 226124,China; 2.School of Civil Engineering,Southeast University,Nanjing,Jiangsu 210096,China)  
Taking Zhongnan Century City project for example,the construction technology and quality control of slurry and anchor joint in the new precast concrete shear wall structure are indicated.The deep design of drawings,components processing,grouting pipe embedding,formwork setting,water-jet and wetting in grouting pipe,grouting material mixing,inner hole grouting,apparent cleaning of components,apparent filling and calendering of grouting opening are introduced in detail.Furthermore,the random stripping and tensioning experiments for slurry and anchor joint were carried out,the results show that the grouting material is compacting.Meanwhile,the tensioning experiment was carried out for steel bars,the results show that the base material is broken,but it has no loosening in slurry and anchor joint.
【Fund】: 住房和城乡建设部“2009年科学技术项目计划——研究开发项目(新型建筑结构技术)”(2009-K2-20)
【CateGory Index】: TU758.12
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 2 Hits
1 Zhang Jun~1,Hou Haiquan~1,Dong Niancai~1,Gong Junjie~1,Guo Zhengxing~2(1.Nantong Construction General Contractor Co.,Ltd.,Nantong,Jiangsu 226124, China;2.School of Civil Engineering, Southeast University,Nanjing,Jiangsu 210096,China);Design and Application of Assembly Integral Shear Wall Residence with Prefabricated Reinforced Concrete[J];Construction Technology;2009-05
2 Zhang Jun1,Hou Haiquan1,Dong Niancai1,Chen Hongjie1,Guo Zhengxing2 (1.Nantong Construction General Contractor Co.,Ltd.,Nantong,Jiangsu 226124,China;2.School of Civil Engineering,Southeast University,Nanjing,Jiangsu 210096,China);Construction Technology on Full-prefabricated Assembly Integral Shear Wall Structure Residence[J];Construction Technology;2010-07
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 BA Songtao(Henan Provincial Academy of Building Research,Zhengzhou 450053,China);Study on safety guards against formworks engineering[J];Sichuan Building Science;2009-02
2 LIU Chengcai1,LI Jiuhong1,LIU Shanbin2 (1.College of Engineering and Technology,Zhongzhou University,Zhengzhou 450044,China;2.Henan Academy of Geophysical and Engineering Exploration,Zhengzhou 450053,China);The experimental study on the structural performance of the prestressed concrete laminated hollow slabs[J];Sichuan Building Science;2010-06
3 XU Xianhong(Civil Construction Engineering Department,Huangshi Institute of Technology,Huangshi 435003,China);Construction technology for non-bonding pre-stressed seamless slab of 15 thousands square meters[J];Sichuan Building Science;2010-06
4 ZHOU Jin1,YUAN Xunbin2,SUN Yigang3(1.Hunan 4th Engineering Co.,Ltd.,Changsha 410119,China; 2.Hunan Urban Construction Vocational and Technical College,Changsha 410015,China; 3.Shaoyang University,Shaoyang 422000,China);Type of residential care group as a whole floor-extra-thick board conversion layer template design and construction support system[J];Sichuan Building Science;2011-06
5 Zhang Feng-lian,Zhao Shu-yuan;Analysis of the Causes of Cracks in the Site-fabricated Reinforced Concrete Floor and Treatment[J];Journal of Anhui Vocational College of Electronics & Information Technology;2006-06
6 ZHANG Jing(Capital Construction Division, Anhui University, Hefei, 230022, China);AUTOMATIC FLOW CONCRETE USED FOR REINFORCEMENT TO BASEMENT WALL[J];Journal of Anhui Institute of Architecture;2004-05
7 DING You-cheng(Huaibei Second Building Engineering Company,Huaibei 235000,China);Construction in winter of hollow bridge plate of prestressed concrete[J];Journal of Anhui Institute of Architecture;2005-05
8 LIU Yong(Department of Building Engineering,Huaibei Vocational &Technical College,Huaibei,Anhui 235000);The supervision control of multi-used prefabricated concrete fixed crane base construction[J];Journal of Anhui Institute of Architecture & Industry(Natural Science);2009-05
9 WAN Hai-ying,LI Dan,WANG Yuan-qing(School of Civil Engineering,Hefei University of Technology,Hefei 230009,China);Construction process monitor of potal frame steel structure in hefei new airport[J];Journal of Anhui Institute of Architecture & Industry(Natural Science);2011-03
10 Chang Zhengkun (Anhui Construction Supervison Co. , Ltd. , Heifei 230032 , China);Ultra Heightand Large Span Cast-in-Situ Concrete Structure Construction Quality Control Method[J];Anhui Architecture;2006-01
China Proceedings of conference Full-text Database 10 Hits
1 WANG Yuling ZHANG Shanguo (China Construction Eighth Engineering Division,Beijing 100097);Arches the Support Construction Technology of GTC[A];[C];2008
2 CHEN Zhiyong, YAN Shengrong ( The fifth project department of Nanjing Yangtze River Tunnel Engineering headquarters ,China Railway 14 Bureau Group Co., Ltd., Nanjing 211800,China);Discuss on Production Technology Quality Control of the Large-Diameter Shield Segment[A];[C];2009
3 Dong Shiwen~1 Zhang Daili~2 Dong Guangsheng~3 (1.Qingdao Construction Engineering Quality Supervision Station,Qingdao 266071,China;2.Qingdao Construction Engineering Quality Inspection Centers Co.,Lid,Qingdao 266012,China;3.Qingdao Construction Engineering Judicature's Appraisal Center's Laboratory,Qingdao 266071,China);Cement production quality test and the quality control of the test work[A];[C];2008
4 Wu Ying xiong~(1,2) (1.Fuzhou University Civil engineering Institute 350108; 2.Fuzhou University Civil construction Design Research institute 350002);Multi-storey reinforced concrete frame columns of Design and Construction Analysis Wenchuan big earthquake earthquake damage inspection and to present situation ponder[A];[C];2008
5 Qiu Yi Sun Peng (Guangdong Provincial Academy of Building Research,Guangzhou 510500);THE CRACK ASSESSMENT AND TREATMENT OF CONCRETE BRIDGES[A];[C];2007
6 Pei Zhaozhen Zhang Tiande Liu Zhi Liu Songshi (Shandong Provincial Academy of Building Sciences,Jinan,250031);Crack Analysis and Reinforcement on the End of Double-T Type Slab[A];[C];2009
7 LI Wen-bin,YANG Qiang-yue,QIAN Lei (Zhejiang Hangxiao Steel Structure Co.,Ltd.,Hangzhou,Zhejiang 310003,China);Application of Steel Bar Truss Deck in Steel Structure[A];[C];2006
8 ZHAO Nan,YAN Wen (Xi'an University of Architecture and Technology,Xi'an,Shaanxi 710055,China);Construction Technology of Formwork Engineering of Fair-faced Concrete Project[A];[C];2007
9 Zhao Qi,Zhu Lijian (Shanghai No.2 Construction Co.,Ltd.,Shanghai 200080,China);Construction Technology and Application of Hard-cutting Continuous Pile Wall[A];[C];2011
10 Wang Qiguo,Yang Jie,Shen Xiaoting (Shanghai No.2 Construction Co.,Ltd.,Shanghai 200080,China);Construction Technology of Deep Foundation Excavation with Same Diaphragm Wall of Subway Station in Down Town[A];[C];2011
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved