Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Construction Technology》 2011-13
Add to Favorite Get Latest Update

Review of the Monitoring of Top-down Excavation

Liu Ming,Zhang Zhen(Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China)  
Firstly,the development process of construction,specifications and monitoring of top-down excavation are summarized as well as the specification of monitoring on the top-down excavation.Secondly,several key project monitoring methods are discussed,including the monitoring of column differential settlement,internal forces of structural slab and uplift at the bottom of the foundation excavation.Then the current problems in top-down excavation monitoring are pointed out.Finally,the trends of monitoring of top-down excavation are predicted.
【Key Words】: top-down construction method deep foundation excavation monitoring review
【CateGory Index】: TU753.1
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 XIAO Yan~1, WANG Bo~2, WANG Guang-ming~1(1. Beijing municipal engineering institute Beijing 100037, China; 2. Fourth construction division of Beijing municipal group, Beijing 100055, China);The Top-Down Method and Construction[J];Municipal Engineering Technology;2004-06
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 ZHAN Wei-guo~1,SUN Yang-bo~2(1.Corporation of Advanced Highway of Anhui Province,Hefei 230022,China;2.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China);Top-down construction method and application of it to deep pit[J];Journal of Anhui Technical College of Water Resources and Hydroelectric Power;2006-02
2 SHEN Lei , LU Yu-nian , Yue Jian-yong (Shanghai Institute of Architectural Design & Research Co. Ltd, Shanghai, 200041 P.R.China);Deformation Characteristics of Oversized Deep Foundation Pit : Comparison of Numerical Simulation with the Instrumentation Results[J];;2005-04
3 DING Chang-guo,HE Shu-huan(No.5 Engineering Co.Ltd.,of China Railway 11 Bureau Group,Chongqing 400037,China);Excavation Method for Deep Foundation Pit and Top-down Construction Technique of Ribbed Plate Anchored Retaining Wall[J];Chinese Journal of Underground Space and Engineering;2006-02
4 SUN Yang-bo~(1,2),YUAN Ju-yun~(1,2),ZHAO Xi-hong~(1,2)(1.Key Laboratory of Geotechnical Engineering,Tongji University,Shanghai200092;2.Department of Geotechnical Engineering,Tongji University,Shanghai200092);A Study on Obligating Width of Soil Slope Shoulder in Basin Opening for Top-down Construction Method[J];Chinese Journal of Underground Space and Engineering;2006-05
5 TANG Mei-fang,GONG Quan-mei(Key Laboratory of Road and Traffic Engineering of the Ministry of Education,Tongji University,Shanghai 200092,China);Study on Subway Station Displacement Affected by Construction of Top-down Additional Floors[J];Chinese Journal of Underground Space and Engineering;2007-02
6 HUAI Wen-wei~1 SUN Yang-bo~2 (1.Jingxie Building Exploitation Co.in Kuashan,Kunshan 215300,China;2.Shanghai Harbor Enginerring Control & Testing Co.,Ltd,Shanghai 200032,China);Research on Ground Improvement in Passive Zone of Soft Clay Excavation with Top-down Construction Method[J];Chinese Journal of Underground Space and Engineering;2008-03
7 NI Bing-yu,WANG Ming-sheng(1.China Railway Tunnel Survey & Design Institute Co.,Ltd,Hongqiao,Tianjin 300133;2.China Railway Tunnel Group Co.,Ltd,Luoyang,Henan 471009,China);Study on Under-Cover-Reverse-Building Method for the Construction of Wide-span Metro Station[J];Chinese Journal of Underground Space and Engineering;2008-04
8 WANG Xu-dong1,LI Lin1,LIU Xian1,2,YUAN Yong1,2,WU Xiao-jian3(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Tongji University,Shanghai 200092,China;3.Shanghai Construction Company,Shanghai 200120,China);Calculation of Construction Load in Cover-cut Method and Analysis of Neighboring Building's Displacement[J];Chinese Journal of Underground Space and Engineering;2009-S2
9 ZHANG Ming-ju YOU Hai-liang DU Xiu-li WANG Yan ZHANG Wen-yu (College of Architecture and Civil Engineering,Beijing University of Technology,Beijing,100022,China);Construction Monitoring Analysis for an Open Excavated Foundation-pit of a Subway Station in Beijing[J];Journal of Beijing University of Technology;2006-10
10 LU Chuan-bao,ZHANG Ming-ju,CAO Shui-qun,WANG Shuang-long,JIANG Yi-fan (1.No.6 Engineering Limited Company,Zhongtie 17th Bureau Group Limited Company,Fuzhou 350014,China; 2.College of Architecture and Civil Engineering,Beijing University of Technology,Beijing 100022,China);Preferred Construction Solution for Xidan Station Engineering on Line 4~# of Beijing Subway[J];Journal of Beijing University of Technology;2007-02
China Proceedings of conference Full-text Database 2 Hits
1 ;上海地铁深基坑盖挖-逆作一体化环境保护施工技术研究[A];[C];2009
2 SHEN Lei , LU Yu-nian , Yue Jian-yong (Shanghai Institute of Architectural Design & Research Co. Ltd, Shanghai, 200041 P.R.China);Deformation Characteristics of Oversized Deep Foundation Pit : Comparison of Numerical Simulation with the Instrumentation Results[A];[C];2005
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 ZHAO Qi~1,XIE Jian-bin~1,MAO Zhen-wei~1(1.Shanghai NO.2 Construction Corporation,Shanghai 200080,P.R.China);Design and Construction of the Joint Node Used in the Deep Foundation by Topdown Construction Method[J];Chinese Journal of Underground Space and Engineering;2006-04
2 ZHAO Qi-hua 1,2, SUN Jun 2, XU Wei 2 (1.Chengdu University of Technology, China; 2.Tongji University);DISPLACEMENT PREDICTION OF UNDERGROUND CONTINUOUS WALL BY THE MULTI STEP NEURAL NETWORK METHOD[J];Journal of Chengdu University of Technology;2002-05
3 Luo Heyan;Study on Application of m Method to Calculation of Foundation pit Bracing[J];GEOTICHNICAL INVESTIGATION AND SURVEYING;1998-06
4 Ding Weida Wu Weimin Zhu Yongnian;Structural Design of Up-down Method in Hengji Tower's Construction[J];Building Structure;1998-07
5 WU Xian TANG Biao;METHODS OF ADJUSTING VERTICALITY FOR SEVERAL BRACING PILLARS IN INVERSE CONSTRUCTION[J];Architecture Technology;2004-02
6 ;Up-Side-Down Construction Technology Adopted For Multistory Basement of Highrise Building In Shanghai[J];Building Construction;1998-05
7 Cao Zhiyuan(Tongji University)Wu Zhiwei(Shanghai Design Institute of Metallurgy);SUPER FINITE ELEMENT METHOD FOR SPATIAL STRUCTURE ANALYSIS[J];SPATIAL STRUCTURES;1995-01
8 XIA Ji jun (Guangdong Foundation Work Corporation,Guangzhou,Guangdong\ 510660);Semi reverse Construction Method for Basement of Yidelu Center Market[J];CONSTRUCTION TECHNOLOGY;2000-01
9 SHI Guang de, HU De\|jun, XING Ke\|xuan, WANG Zuo\|lin (Tianjin Construction Engineering Group, Tianjin\ 300074,China);Placement of Support Column and Technical Treatment of Joint in Deep Foundation Ditch Reverse Construction Method[J];Construction Technology;2002-01
10 Cao Keqing (Shangnai Museum of Natural History, Shanghai 200002, PRO;Varitional Solution to Active Pressure and Passive Pressure[J];Shanghai Geology;1996-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved