Knowledge Integration-based Risk Identification Expert System for Metro Construction

Wu Xianguo1,Zhang Limao1,Yu Hongliang1,Yu Minghui2(1.School of Civil Engineering and Mechanics,Huazhong University of Science and Technology,Wuhan,Hubei 430074,China; 2.Research Institute of System Engineering,Huazhong University of Science and Technology,Wuhan,Hubei 430074,China)  
Traditionally,risk identification during metro construction relied too much on invited experts,which showed disadvantages such as low efficiency and susceptibility to mistakes.An expert system was developed in this paper for risk assessment in metro construction.In this system,explicit and implicit knowledge were firstly integrated.Risk analysis was performed to identify the risk sources,whose characteristics were structured to construct a database.Expansion rule database was generated based on the relationships between causes and consequences.Finally,risk assessment was performed based on the risk credit limit under typical cases.Compared to traditional method,this expert system makes it possible to share knowledge among experts and do risk assessment automatically.It has also got advantages of being accurate,quick and smart,etc.
【Fund】: 国家科技支撑计划(2006BAJ18B08-01);; 武汉市科技局科研创新项目(200860423194)
【CateGory Index】: U231.3
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 5 Hits
1 ZHOU Jia-wu,LIU Yuan-xue,CHEN Chen,WANG Pei-yong(Dept.of Architecture & Civil Engineering,LEU,Chongqing 400041,China);Stability of Surrounding Rock Evaluating Expert System Based on Rough Set Theory[J];Chinese Journal of Underground Space and Engineering;2008-06
2 Zhou Hongbo Cai Laibing Gao Wenjie(Shanghai Jianke Project Management Co.,Ltd.,Shanghai 200032,China);RISK IDENTIFICATION AND SENSITIVITY ANALYSIS OF LEAKAGE OF SLURRY WALL FOR DEEP EXCAVATIONS[J];Industrial Construction;2009-04
3 LI Lei~1 GAO Tieman~2 (Tianjin Polytechnic University~1,Tianjin,300160,China Wuhan University of science and Engineering~2,Wuhan,430073,China);The Theory and Realization of Production Rules Expert Systems[J];Microcomputer Applications;2006-05
4 QIAN Qihu,RONG Xiaoli (Engineering Institute of Engineering Corps,PLA University of Science and Technology,Nanjing,Jiangsu 210007,China);STATE,ISSUES AND RELEVANT RECOMMENDATIONS FOR SECURITY RISK MANAGEMENT OF CHINA′S UNDERGROUND ENGINEERING[J];Chinese Journal of Rock Mechanics and Engineering;2008-04
5 JIA Jia-ling 1,2 ,Senior Engineer WANG Meng-shu 2 ZHANG Ding-li 2 (1 Beijing Urban Engineering Design & Research Institute Co. Ltd 2 Centre of Tunnel Technology Research, Beijing Jiaotong University);Fuzzy Analysis of Construction Risk in Xidan Highway Grade Separation Project[J];China Safety Science Journal;2004-12
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Wang Fei1,2,Hu Qunfang3,Huang Hongwei1,2 (1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.Key Laboratory of Geotechnical and Underground Engineering of the Ministry of Education,Tongji University,Shanghai 200092,China;3.Institute of Disaster Prevention & Relief,Shanghai 200092,China);Dynamic Risk Management for Simultaneous Construction of Stations in Rail Transit Systems[J];Chinese Journal of Underground Space and Engineering;2010-05
2 Xu De,Shao Longtan(Department of Engineering Mechanics,Dalain University of Technology,Dalain Liaoning 116024,China);Numerical Analysis of Bolt Pullout Based on Elastic-Perfectly Plastic Model[J];Chinese Journal of Underground Space and Engineering;2011-S2
3 Ma Rui(AECOM Consultants(Shenzhen) Pte.Ltd.Shanghai Office,Shanghai 200001,China);Risk Assessment of the Ultra-deep TBM Shaft Excavation at the Changxing Island[J];Chinese Journal of Underground Space and Engineering;2012-01
4 Chen Feng(Shanghai Water Engineering Design & Research Institute,Shanghai 200061,China);Flood Prevention & Risk Synthetical Estimation of Urban Underground Space[J];Chinese Journal of Underground Space and Engineering;2012-03
5 CAO Yaofu1,CAO Xuguang1,MA Limin2,SHEN Liping2,ZHAI Huijie1(1.College of Computer Science & Technology,Jilin University,Changchun 130026;2.Third development plant,Daqing Oil Field Company ltd,Daqing 163113);Research of Rule-Based Water-out Reservoir Expert System[J];Journal of Changchun University of Science and Technology(Natural Science Edition);2008-04
6 Li Yanjun1,Li Chumin2 (1.College of Computer Science of Chongqing University,Chongqing 400044,China;2.Department of Information Technology,Xingqiao Hospital,Third Military Medical University,Chongqing 400037,China);Research of intelligent order system for rational medication based on production rules[J];Chongqing Medicine;2011-35
7 ZHAO Yan-yi(School of Software Engineering,Tongji University,Shanghai 200092,China);An Conceptual Design of MIS in Urban Mass Transit Construction Field[J];Computer Knowledge and Technology;2011-22
8 Zhou Huajie(Wuhan Metro Group Co.Ltd.,Wuhan 430030);Study on the Security Management System of Metro Projects in China[J];Urban Rapid Rail Transit;2009-01
9 Liu Guangwu Li Wenqiu(Guangzhou Metro Corporation,Guangzhou 510030);Ten Specialized Security Management Measures and Practice of Guangzhou Metro[J];Urban Rapid Rail Transit;2011-01
10 Yang Xiuren(Beijing Urban Engineering Design and Research Institute Co.,Ltd.,Beijing 100037);Discussion on Safety Risk Management of Urban Rail Transit Construction: A Pragamatic Perspective[J];Urban Rapid Rail Transit;2011-02
China Proceedings of conference Full-text Database 8 Hits
1 Liu Wen,Hu Qunfang,Zhang Hong,Shi Hongxia;Dynamic Risk Management on In-Situ Construction of Urban Rail Transit Systems[A];[C];2009
2 Wang MingYang,Rong Xiaoli;The Development of Risk Management Research on the Exploitation of Underground Space[A];[C];2010
3 ZENG Libin,HUANG Mu,RONG Xiaoli (Engineering Institute of Engineering Corps,PLA University of Science and Technology,Nanjing,210007);Research of Construction Monitoring Geology and Geography Information System for Underground Engineering[A];[C];2010
4 Xie-Dongsheng,Wang-Mingyang,Lu-Hao (Engineering Institute of Engineering Corps,PLA University of Science & Technology,Nanjing 211107,China);ACCIDENTS STATISTICS AND ANALYSIS OF SUBWAY ENGINEERING[A];[C];2010
5 Ji Mei Tang Mingjie Zhou Hongbo (Shanghai Jianke Project Management Co.,Ltd.,Shanghai 200032 P.R.China);RISK ANALYSIS OF THE UNDERGROUND PASSAGE THROUGH RAIL TRANSIT CONSTRUCTION SCHEME[A];[C];2012
6 Wei Hong (Beijing Metro Network Administration Co.,Ltd.,Beijing 100086,China);Security Risk Management of Deep Foundation Excavation Construction to the Adjacent Buildings[A];[C];2011
7 ZHAO Lei~1,LU Hao~2,WANG Ming-yang~2,SHI Ye-hui~2,XIAO Jun-hua~3,YANG Bao-huai~4 (1.Logistics College of the CPLA,Beijing,100858 China;2.PLA University of Science and Technology,Nanjing.210007,China; 3.Transportation College,Nanjing University of Technology,Nanjing 210009,China;4.Kentop civil engineering,Nanjing 210007,China);Application Study of W.Kent Index Method on Risk Assessment in Subway Engineering Construction[A];[C];2012
8 Huang Xiaocheng1;Chen Qiunan1;Yang Yuepeng2;Zhang Zhimin1 (1 School of Civil Engineering,Hunan University of Science and Technology,Xiangtan,Hunan 411201,China 2 Chinese Nonferrous Metal Survey and Design Institute of Changsha Co.Ltd,Changsha 410001 China);Risk Evaluation of Karst Tunnel under Complex Geological Condition with Extension Theory[A];[C];2013
【Co-references】
Chinese Journal Full-text Database 2 Hits
1 LU Meili~① LIU Weining~① LUO Furong~② LI Xinggao~①(①Institute of Tunnel & Geotechnical Engineering,Beijing Jiaotong University,Beijing100044)(② Beijing Metro Construction Management Co.Ltd.,Beijing100037);REVIEW ON RISK ASSESSMENT METHODS FOR TUNNELLING AND UNDERGROUND PROJECTS[J];Journal of Engineering Geology;2006-04
2 LIU Ren-hui,YU Bo,JIN Zhen(School of Management,Harbin Institute of Technology,Harbin 150001,China);Study on Index System of Safety Risk Evaluation for Subway Construction Based on Interval Estimation[J];Forecasting;2012-02
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 HUANG Hong-wei(Dept.of Geotechnical Engineering,Tongji University,Shanghai 200092,China);State-of-the-Art of the Research on Risk Management in Construction of Tunnel and Underground Works[J];Chinese Journal of Underground Space and Engineering;2006-01
2 HUANG Hong-Wei~1,ZENG Ming~2,CHEN Liang~1,HU Qun-fang~1(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.General Office of Commanding Post of Shanghai Tunnel & Bridge Construction,Shanghai 200120,China);Risk Management Software (TRM1.0) Based on Risk Database for Shield Tunneling[J];Chinese Journal of Underground Space and Engineering;2006-01
3 CHEN Gui-xiang~1,HUANG Hong-wei~2,YOU Jian-xin~1(1 School of economics and management,Tongji University,Shanghai,200092,China;2 Department of Geotechnical Engineering,Tongji University,Shanghai,200092,China);Study on Life Cycle Risk Management of Metro[J];Chinese Journal of Underground Space and Engineering;2006-01
4 CHEN Long~1,HUANG Hong-wei~2(1.Shanghai Civic Engineering Construction and Developing Ltd.,Shanghai 200025;2.The Department of Geotechnical Engineering of Tongji University,Shanghai 200092);The Practice of Risk Management in Shangzhong Road Tunnel Engineering[J];Chinese Journal of Underground Space and Engineering;2006-01
5 FAN Yiqun, ZHONG Wanxie, LIU Jianhang  (State Key Laboratory for Structure Analysis of Industrial Equipment, Dalian University of Technology, Dalian 116023, China; The Research Room of Liu Jianhang Academician in ShangHai Tunnel Engnie;Theory of time-space effect and modern design concepts in soft soil pit engineering[J];JOURNAL OF TSINGHUA UNIVERSITY(SCIENCE AND TECHNOLOGY);2000-S1
6 Qian Qihu;Modern technology of underground space development and utilization in city and its developing trend[J];Railnay Corstruction Technology;2000-05
7 Ye Hui;The Cause Analysis and Prevention on Leakage of the Underground Continuous Wall in Construction of the Deep Foundation Cut[J];Railway Investigation and Surveying;2006-02
8 ZHONG Jing bing 1 LI Hui qiang 1 WU Jing 1 (1.School of Civil Eng. & Mechanics, HUST, Wuhan 430074 China);FTA Method for Path of Engineer Failure and Risk Source Factor[J];Journal of Wuhan Urban Construction Institute;2003-01
9 CHEN Long,HUANG Hong-wei(Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China);RISK ANALYSIS OF ROCK TUNNEL ENGINEERING[J];Chinese Journal of Rock Mechanics and Engineering;2005-01
10 Liu Daan Yang Zhifa (Engineering Geomechanics Lab, Institute of Geology Chinese Academy of Sciences,Beijing,100029) Ke Tianhe Wang Jing (Middle South Hydropower Design & Research Institute,State Power Corporation of China, Changsha,410014) Liu Ying;Synthetic geology information system and its application in the shiplock slope engineering of a hydropower station[J];CHINESE JOUNAL OF GEOTECHNICAL ENGINEERING;2000-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved