Analysis and Treatment on Collapse of Tunnel Lining Back Cavity

ZHOU Tao1 DANG Haiyan1 WANG Guoxin2(1Shanghai Geotechnical Investigations& Design Institute Co. Ltd., Shanghai 200031 2China Construction Eighth Engineering Division,Shanghai 200135)  
Theory and practice have proved it is easy to happen collapse when there are lining back cavities in tunnel. Therefore, if there is overbreak during tunnel construction, it is obligatory to infill the overbreak. If construction can be carried out rationally according to dynamic montoring and control, this kind of collapse can be avoided.