Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Shanghai Jiaotong University》 2009-04
Add to Favorite Get Latest Update

Reliability-Based Opportunistic Preventive Maintenance Model of Multi-units Serial-Parallel System

HOU Wen-rui,JIANG Zu-hua,JIN Yu-lan(School of Mechanical Engineering,Shanghai Jiaotong University,Shanghai 200240,China)  
The reliability recursion relationship of every unit in complex system evolvement was described for different preventive maintenance actions concerning with reliability renew factor,a reliability based opportunistic preventive maintenance model to make a target of the minimal maintenance cost was built up for multiple-units derail-parallel system.An applied case show that the model is practical and can support maintenance decision for complex construction production system.
【Fund】: 国家海外青年学者合作研究基金项目(50128504)
【CateGory Index】: TH17
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 3 Hits
1 JIN Yu-lan,JIANG Zu-hua,HOU Wen-rui(School of Mechanical Eng.,Shanghai Jiaotong Univ.,Shanghai 200240,China);Optimal Policy Research on Reliability-Centered Preventive Maintenance for Multi-components Equipment[J];Journal of Shanghai Jiaotong University;2006-12
2 ZHOU Xiao-jun~1,SHEN Wei-bing~(1,2),XI Li-feng~1,LEE Jay~3(1.School of Mechanical Eng.,Shanghai Jiaotong Univ.,Shanghai 200240,China;2.Sewerage Management Office of Shanghai,Shanghai 200231,China;3.School of Eng.,Univ.of Cincinnati,Cincinnati OH 45221-0072,Ohio,USA);A Dynamic Opportunistic Preventive Maintenance Model for a Multi-unit Series System with Consideration of Imperfect Maintenance Effect[J];Journal of Shanghai Jiaotong University;2007-05
3 CAI Jing, ZUO Hong-fu, WANG Hua-wei (College of Civil Aviation, Nanjing University of Aeronautics and Astronautics, Nanjing 210016, China);Complex System Maintenance Cost Simulation Based on Opportunistic Maintenance Policy[J];Journal of System Simulation;2007-06
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Yang Yi,Wang Lichao,Zou Yun (School of Automation,Nanjing University of Science and Technology,Nanjing 210094,China);Availability Model of One-unit Discrete Time System with Preventive Maintenance[J];Acta Aeronautica Et Astronautica Sinica;2009-01
2 WANG Li-chao,YANG Yi,ZOU Yun(School of Automation,NUST,Nanjing 210094,China);Optimal Prenventive Maintenance Interval Model of Discrete Time System[J];Journal of Nanjing University of Science and Technology(Natural Science);2009-01
3 WANG Lingzhi XU Yugong ZHANG Jiadong(School of Mechanical,Electronic and Control Engineering,Beijing Jiaotong University,Beijing 100044);Preventive Maintenance Economic Optimization Model Based on Equipment Availability and Reliability[J];Journal of Mechanical Engineering;2010-04
4 HOU Wen-rui,JIANG Zu-hua,JIN Yu-lan(School of Mechanical Engineering,Shanghai Jiaotong University,Shanghai 200240,China);Relative-Deterioration Degree Based Policy Research of Condition-Based Maintenance[J];Journal of Shanghai Jiaotong University;2008-07
5 HOU Wen-rui,JIANG Zu-hua,JIN Yu-lan(School of Mechanical Engineering,Shanghai Jiaotong University,Shanghai 200240,China);An Opportunistic Maintenance Model with Consideration of Risk[J];Journal of Shanghai Jiaotong University;2008-07
6 XIA Tang-bin,ZHOU Xiao-jun,XI Li-feng(School of Mechanical Engineering,Shanghai Jiaotong University,Shanghai 200240,China);Multi-attribute Model for Dynamic Preventive Maintenance Decision with Hybrid Evolution Factors[J];Journal of Shanghai Jiaotong University;2009-05
7 GAO Ping 1,2 ,WU Su 1 ,JIA Xi-sheng 2 (1.Department of Industrial Engineering,Tsinghua University,Beijing 100084,China; 2.Department of Management Engineering,Mechanical Engineering College,Shijiazhuang 050003,China);Reliability Model of Complex System and its Parameters Estimation Method[J];Journal of System Simulation;2009-13
8 HOU Wen-rui,JIANG Zu-hua,JIN Yu-lan(School of Mechanical Engineering,Shanghai Jiaotong Univ.,Shanghai 200240,China);Opportunistic preventive maintenance model of multi-components system based on reliability[J];Systems Engineering and Electronics;2008-09
9 CAI Jing,ZUO Hong-fu,L De-feng(Coll.of Civil Aviation,Nanjing Univ.of Aeronautics and Astronautics,Nanjing 210016,China);Research on maintenance optimal method of parallel system based on imperfect inspection[J];Systems Engineering and Electronics;2009-05
10 Liu Fanmao1,2 Zhu Haiping1 Shao Xinyu1 Rao Yunqing1 Gao Guibin11.State Key Laboratory of Digital Manufacturing Equipment & Technology,Huazhong University of Science & Technology,Wuhan,4300742.Hunan University of Science & Technology,Xiangtan,Hunan,411201;A Condition-based Opportunistic Maintenance Strategies for Multi-unit Series and Parallel System Based on Markov Chain[J];China Mechanical Engineering;2009-07
【Secondary Citations】
Chinese Journal Full-text Database 3 Hits
1 HAN Bang -jun , FAN Xiu - min, MADeng - zhe, J IN Ye (CIM Institute, Shanghai Jiaotong Univ. , Shanghai 200030, China);Optimization of Equipment Preventive Maintenance Cycle in Production System Based on Genetic Algorithm[J];Computer Integrated Manufacturing Systems;2003-03
2 XI Li-feng~1,ZHOU Xiao-jun~1,LEE Jay~2(1.Sch.of Mechanical Eng.,Shanghai Jiaotong Univ.,Shanghai 200030,China;2.Univ.of Wisconsin,Milwaukee WI 53211,Wisconsin,USA);Research on sequential preventive maintenance policy in finite time horizon[J];Computer Integrated Manufacturing Systems;2005-10
3 ZHOU Xiao-jun~1, XI Li-feng~1,LEE Jay~2(1.School of Mechanical Eng.,Shanghai Jiaotong Univ.,Shanghai 200030,China; 2.Univ.of Wisconsin,Milwaukee WI 53211,Wisconsin,USA);A Reliability-Based Sequential Preventive Maintenance Model[J];Journal of Shanghai Jiaotong University;2005-12
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved