Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Hydraulic Engineering》 1988-09
Add to Favorite Get Latest Update

Flood risk CSPPC model and its application

Xu Zongxue Ye Shouze (Wuhan Institute of Hydraulic and Electric Engineering)  
From the viewpoint of stochastic point process, the authors researchedthe flood risk model--clustering stochastic point process compound(CSPPC) model and derived two specific models--generalized Poisson-Poisson (GPP) model and generalized Poisson-Bernoulli (GPB) model. The application of the model was discussed combining with the data of Yichang flood peak counted process in twenty years on the Yangtze River. The result shows that the model is practical in analyzing and calculating the flood risk for the clustering flood stochastic point process.
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 10 Hits
1 CAO Yun (Nanjing Engineering Institute,Nanjing,Jiangsu 211167,China);Research on Risk Factor Analysis and Risk Computation Model in Levee Engineering[J];Journal of Water Resources and Architectural Engineering;2006-04
2 Hu Zhigen 1,Liu Quan 1,He Changhal 1,Xiao Huanxiong 1,Zhou Yihong 1, Fu Zheng 2, Li Dingkui 2 (1.College of Water Conservancy and Hydropower Engineering, Wuhan University, Wuhan 430072 China;2.Chengdu Hydroelectric Investigation and Research;Multi-objective Risk Model of Optimal River Diversion Standards During Initial Stage Construction for Hydroelectric Project[J];Engineering Science;2001-08
3 Xiao Huanxiong Han Caiyan (Whuhan Institute of Hydraulic and Electric Engineering);Risk Decision on the Standard of River Diversion during Construction[J];Renmin Zhujiang;1993-01
4 Xu Zongxue (Tsinghua University) Zeng Guangming (Hunan University);A Flood Frequency HSPPC Model and its Application[J];Advances In Water Science;1992-03
5 HU Zhi gen 1, LIU Quan 1, HE Chang hai 1, XIAO Huan xiong 1, ZHOU Yi hong 1 FU Zheng 2, LI Ding kui 2, ZHENG Jia xiang 2(1 College of Water Resource and Hydropower, Wuhan University, Wuhan 430072, China; 2 Chengdu Hydroelectric Inv;Risk analysis of retaining rockfill cofferdam for diversion based on the Monte-Carlo method[J];Advances In Water Science;2002-05
6 Fang Daonan,et al(Jiangsu Provincial Investment and Management Corporation,Nanjing 210029);Large Scale System Multiobjective Programming and Risk Decision Making Theory and Methodology[J];ADVANCES IN SCIENCE AND TECHNOLOGY OF WATER RESOURCES;1999-04
7 FU Xiang,et al(Wuhan Univ.of Hydraulic and Electric Engineering,Wuhan,430072,China);Review of Risk Management of Flood Control and Hazard Mitigation[J];Advances In Science and Technology of Water Resources;2001-01
8 WANG Xin-yu~1,ZHANG Xiang~2,LAI Guo-wei~2 (1.Changjiang Water Resources Commission,Wuhan430010,China;2.Wuhan University,Wuhan\ 430072,China);Over-standard integrated risk analysis of flood control system[J];Journal of Hydraulic Engineering;2004-02
9 HAN Yu-ping~1,RUAN Ben-qing~2,WANG Dang-xian~2(1.North China Institute of Water Conservancy and Hydroelectric Power, Zhengzhou 450011,China;2.China Institute of Water Resources and Hydropower Research,Beijing 100044,China);Multi-objective risk decision-making model for regional water resources shortage[J];Journal of Hydraulic Engineering;2008-06
10 Zhu Yonghua,Dong Yajuan (Institute of Mathematics and Statistics, Wuhan University, Wuhan 430072, China);A Two-Variate Marked Values Poisson Point Process Model in Risk Analysis of Flood Control[J];Acta Mathematiea Scientia;2001-04
【Co-citations】
Chinese Journal Full-text Database 4 Hits
1 Deng Yonglu Xu Zongxue (Zhongshan University)(Tsinghua University);THE RENEWAL PROCESS MODEL AND ITS APPLICATION FOR FLOOD RISK ANALYSIS[J];Water Resources and Power;1989-03
2 Xu Zongxue (Tsinghua University) Deng Yonglu (Zhongshan University);Flood Risk HSPPB Model and Its Application[J];Journal of Hydroelectric Engineering;1989-01
3 Xiong Ming ; Guo Haijin; Sun Shuangyuan(1.Yangtze River Water Resouroes Commission,Wuhan 430010,China;2.Investigation and Design Institute of Water Conservancy and Hydropower, Beijing 100011,China);Improvements of Analysis and Calculation of Engineering Hydrology in China[J];HYDROLOGY;1999-05
4 Tian Fengwei 1 Xie Jiancang 1,2 Wang Xinhong 1 Yan Zongfeng 1 Liu Junping 1 ① Xian University of Technology, Xian 710048; ② Hohai University;Study on the Calculation Method of Risk and Risk Transmission in Reservoir Operating Decision[J];JOURNAL OF XI'AN UNIVERSITY OF TECHNOLOGY;1998-01
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 DONG Si-hui1, ZHOU Rong2, ZHOU Hui-cheng3(1 School of Environment Science and Engineering, Dalian Jiaotong University, Dalian 116028, Liaoning, China; 2 School of Management, Dalian Jiaotong University, Dalian 116028, Liaoning,China; 3 School of Civil and Hydraulic, Dalian University of Technology, Dalian 116024, Liaoning, China);Risk analysis on downstream of a reservoir when the flood control method is used: a case of Shenwo Reservoir[J];Journal of Safety and Environment;2006-02
2 HUANG Guang-hong(Susong County Diaoyutai Reservoir Administration Institute,Anhui 246500,China);Using fuzzy set analysis method to make a division for Diaoyutai Reservoir's flood season[J];Journal of Anhui Technical College of Water Resources and Hydroelectric Power;2005-04
3 Zhang Ailin (College of Architecture and Civil Engineering, Beijing Polytechnic University, Beijing, 100022);Reviews for the Research of Performance Reliability-Based Design Theory for the Whole Service Life of Structures[J];JOURNAL OF BEIJING POLYTECHNIC UNIVERSITY;2000-03
4 WANG Jing-ai, WANG Jue & YE Tao ural Disaster of Ministry of Education of China, BNU, Beijing 100875, China);Hazard Assessment of Urban Flood Disaster and Sustainable Development in China[J];Journal of Beijing Normal University(Social Science Edition);2004-03
5 Pan Yaozhong (Insitute of Resource Sciences, Beijing Normal University, Open Research Laboratory of Environmental Change and Natural Disaster of National Education Committee, 100875, Beijing, China);RESEARCH ON THE BASIC UNIT OF REGIONAL NATURAL DISASTER SYSTEM (Ⅲ)──COMPREHENSIVE REGIONALIZATION DISTRIBUTION OF AGRICULTURAL NATURAL DISASTERS IN HUNAN PROVINCE[J];JOURNAL OF BEIJING NORMAL UNIVERSITY(NATURAL SCIENCE);1998-03
6 Zhao Xia Wang Ping Gong Yali Tan Jin Li Xiangrong Ren Yi(College of Resources Science and Technology,Beijing Normal University,100875,Beijing,China);GIS-BASED RISK ASSESSMENT OF FLOOD DISASTER IN THE MIDDLE PART OF INNER MONGOLIA[J];Journal of Beijing Normal University(Natural Science);2007-06
7 Wang Jing'ai;Shi Peijun;Zhu Li Chen Jin;Zhang Yuanming;Wang Ping(Department of Resources and Environmental Sciences,Beijing Normal University;Environmental Changes and Natural Disaster Open Research Laboratory,National Education Commision;100875,Beijing,P;ESTABLISHMENT AND APPLICATION OF NATURAL DISASTER DATABASE OF CHINA[J];JOURNAL OF BEIJING NORMAL UNIVERSITY;1995-01
8 Zhang Lansheng; Shi Peijun; Wang Jing'ai; Zhu Li (Department of Geography, Beijing Normal University, Open Laboratory of Environmental Changes and Natural Disastere, National Education Committee of China, Beijing, 100875, PRC );REGIONALIZATION OF NATURAL DISASTERS IN CHINA[J];JOURNAL OF BEIJING NORMAL UNIVERSITY;1995-03
9 ZHU Jing,TANG ChuanState Key Laboratory of Geo-hazard Prevention and Geo-environment Protection,Chengdu University of Technology,Chengdu 610059,China;Vulnerability analysis of urban flash floods[J];Journal of Chengdu University of Technology(Science & Technology Edition);2008-01
10 JIA Yanjie,ZHANG Huabing,WANG yuan(College of Urban and Environmental Science ,Tianjin Normal University,Tianjin 300074,China);Constrains of Water Resource and Its Countermeasures in Local Sustainable Development of Tianjin[J];Urban Environment & Urban Ecology;2003-01
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 SUN Liying 1,2 ,HUANG Zheng 1,2 ,LIU Yongwei 1,3 ,NI Jinren 1,2,1. Department of Environmental Engineering,Peking University,Beijing 100871; 2. The Key Laboratory of Water and Sediment Sciences,Ministry of Education,Beijing 100871; 3. School of City and Environment,The Shenzhen Graduate School of Peking University,Shenzhen 518055;;Regional Responses of Sustainable Development to Flood Hazards[J];Acta Scientiarum Naturalium Universitatis Pekinensis;2009-02
2 ZHAO Yunfa, LIU Zhiwu, ZHANG Jishun (Three Gorges Cascade Dispatching & Communication Center, Yichang 443133, China);Discussion on Dynamic Limited Flood Water Level Control of Three Gorges Reservoir[J];Hydropower Automation and Dam Monitoring;2007-01
3 ;The risk analysis of closure dike retaining during the initial stage of construction diversion[J];Electric Power Standardization & Measurement;2005-01
4 HUANG Dapeng1,2, LIU Chuang1, PENG Shunfeng1 (1.Institute of Geographic Sciences and Natural Resources Research,CAS,Bejing 100101, China; 2. Graduate School of CAS, Beijing 100039, China; 3. Huaihe River Commission, Ministry of Water Resources,Bengbu 233001, China);Progress on Assessment and Regionalization of Flood Risk[J];Progress in Geography;2007-04
5 LIAN Jian,GONG Huili,LI Xiaojuan,ZHAO Wenji,HU Zhuowei(1 Key Lab of 3D Information Acquisition and Application,MOE,College of Resource Environmental and Tourism,Capital Normal University,Beijing 100037,China;2 Key Lab of Resources Environment and GIS,Beijing City,Beijing 100037,China);Design and Development of Flood/Waterlogging Disaster Risk Model Based on ArcObjects[J];Journal of Geo-Information Science;2009-03
6 CAO Yun (Nanjing Engineering Institute,Nanjing,Jiangsu 211167,China);Research on Risk Factor Analysis and Risk Computation Model in Levee Engineering[J];Journal of Water Resources and Architectural Engineering;2006-04
7 He Changhai 1, Hu Zhigen 1, Zhou Yihong 1, Xiao Huanxiong 1, Fu Zheng 2, Li Dingkui 2 (1.College of Water Conservancy and Hydropower Engineering, Wuhan University, Wuhan 430072,China; 2.Chengdu Hydroelectric Investigation and Research Institute o;Risk Severity Analysis of Scheme of River Closure by End Dumping[J];Engineering Science;2002-04
8 Fang Debin 1,Wang Xianjia 1,Hu Zhigen 2 (1.Institute of Systems Engineering, Wuhan University, Wuhan 430072, China; 2.Institute of Construction Engineering, Wuhan University, Wuhan 430072, China)[;A DSS for Management on the Jointly Discharging of Overtopped Cofferdam[J];Engineering Science;2003-01
9 Fan Xi'e, Hu Zhigen, Liu Quan (1. State Key Laboratory of Water Resource and Hydropower Engineering Science, Wuhan University, Wuhan 430072, China; 2. Development and Reform Commission of Jinshan District, Shanghai 200540, China);Multi-objective decision model for construction diversion schemes based on utility[J];Engineering Sciences;2008-07
10 FAN Xi-e~1,CHAI Huan-cheng~(2,3),HU Zhi-gen~1(1.State Key Laboratory of Water Resource and Hydropower Engineering Science,Wuhan University,Wuhan 430072,China;2.School of Engineering,Ocean University of China,Qingdao 266003,China;3.Shandong Water Polytechnic,Rizhao 276800,China);Multi-objective decision-making method for diversion schemes based on risk attitudes of decision makers[J];Journal of Hohai University(Natural Sciences);2006-05
China Proceedings of conference Full-text Database 5 Hits
1 WANG Dong~1, PAN Shaoming~2, WU Jichun~1, ZHU Qingping~3 (1. Dept. of Earth Sciences, Nanjing Univ., Nanjing 210093, China; 2. The Key Lab of MOE of Coast & Island Development, Nanjing Univ., Nanjing 210093, China; 3. The Yellow River Conservancy Commission of MWR, Zhengzhou 450001, China; );The Risk Analysis in Floods[A];[C];2004
2 DU Faxing, LIANG Chuan, CHEN Tingting (College of Hydroelectric Engineering,Sichuan University,Chengdu 610065,China);Projection Pursuit Model for Comprehensive Risk Evaluating of Water Sources Scarcity[A];[C];2006
3 Dong Wang~1 Jichun Wu~1 Qingping Zhu~2 1 Department of Hydrosciences, Nanjing University, Nanjing, 210093, China 2 China Water International Engineering Consulting Co.Ltd, Beijing, 100053, China;The Application and Prospect of Risk Analysis in flood in the Past 25 Years[A];[C];2007
4 Zhong Denghua~1 Huang Wei~1 Mao Guoquan~2 (1.School of Civil Engineering,Tianjin University,Tianjin 300072; 2.Guangxi Changzhou Hydropower Development Co.,Ltd.,Wuzhou 543002);Multi-phase diversion cofferdam's removal time of Changzhou water control project[A];[C];2007
5 Liu Hanlong,Yang Gui;Research Progress on Environmental Geotechnology[A];[C];2010
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved