Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Mathematics In Practice and Theory》 2003-11
Add to Favorite Get Latest Update

GERT Model and Its Simulation Solution of New Product Development Projects

HE Zheng-wen, XU Yu, ZHU Shao-ying, ZHANG Jing-wen (School of Management, Xi′an Jiaotong University, Xi′an 710049, China)  
This paper takes the new product development project—VCDM3 Vacuum Resin Dosing Equipment development—as its research background. By using random network techniques the GERT model of the project is constructed at first. Then based on the recursive simplification algorithm of GERT model the special software is developed. Through the software, simulation analysis of the project′s finish time is carried out and its probability distribution and statistical eigenvalues are obtained. In addition, statistical estimation of the project′s finish time is made out on the basis of the simulation outcomes. In this way, quantitative information supports can be provided for managers to make decision and control the duration of the project.
【Fund】: 国家自然科学基金海外杰出青年基金 B类项目 ( 70 0 2 810 2 )
【CateGory Index】: F224
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 2 Hits
1 Zhang Yajuan Sun Daning Zhang Yingjun (College of Science,North China Univ.of Tech.,100144,Beijing,China);The Application of GERT to Management[J];Journal of North China University of Technology Beijing China;2008-03
2 ZHANG Yan-feng~(1,2),SI Chun-lin~2(1.Shanghai Univ.of Finance and Economics,Shanghai 200433,China;2.School of Management,Fudan Univ.,Shanghai 200433);Reviewing Model Research of Risk and Period on Venture Capital Project Portfolio Based on GERT-Net[J];Journal of Systems & Management;2007-03
China Proceedings of conference Full-text Database 1 Hits
1 CUI Dong-hong, TIAN Yue Management Institute,Shenyang University of Technology,Shenyang 110023,China.;Research and development on the robust control system of project three targets[A];[C];2005
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Liu Xiaoqin Ying Yuanming;THE APPLICATION OF RANDOM NETWORK TECHNIQUES TO MANAGEMENT DECISIONS[J];JOURNAL OF TIANJIN INSTITUTE OF TECHNOLOGY;1997-03
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 CHEN Hui1,ZHU Jian2,ZHANG Qinghua3,CUI Shumei1,XIN Cuixiang1(1.School of Civil Engineering in Yantai University,Yantai 264005,China;2.Yanjian Clique Limited Company,Yantai 264005,China;3.Yantai International Ecnomic & Technical Coopaeration Co.,Ltd,Yantai 264005,China);Application of MCS in estimating for project[J];Sichuan Building Science;2007-05
2 ZHOU Xiao hong (Anhui University of Technology and Science, Wuhu 241000, China);Risk analysis of hi-tech project[J];Journal of Anhui University of Technology and Science;2003-02
3 Yue Yuxi (Fuyang Institute of Architectural Design and research,Fuyang,236001) Wang Shenglan (Anhui Institute of Traffic Science and Research,Hefei,230001);RESOURCE OPTIMIZATION OF NET-PLANNING TECHNIQUE AND ITS APPLICATION IN ENGINEERING[J];JOURNAL OF ANHUI INSTITUTE OF ARCHITECTURE;2000-04
4 ZHULi -long(Dept.of Trade and Economy,ATTC,Fengyang,Anhui 233100);A Study on the Strategy of Investment Realization for Sustainable Agricultural Development[J];Journal of Anhui Agricultural University;2001-04
5 LI Tao(School of Management,Tianjin University,Tianjin 300072);Study on the Ecological Risk Analysis and Ecotourism System Management[J];Journal of Anhui Agricultural Sciences;2006-24
6 HUANG Hong-Wei~1,ZENG Ming~2,CHEN Liang~1,HU Qun-fang~1(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.General Office of Commanding Post of Shanghai Tunnel & Bridge Construction,Shanghai 200120,China);Risk Management Software (TRM1.0) Based on Risk Database for Shield Tunneling[J];Chinese Journal of Underground Space and Engineering;2006-01
7 Gao Lixin;Fan Yumei;Xu Jinwn;Yang Huanxi(Department of Mechanical Engineering,USTB,Beijing 100083,PRC(General Machanial Factory of Wuhan Iron & Steel Co,Wuhan 430083,PRC);Fuzzy Plan of the Time-Cost Analysis for Network Plan of Manufacture of Continuous casting machine[J];JOURNAL OF UNIVERSITY OF SCIENCE AND TECHNOLOGY BEIJING;1994-06
8 ZHANG Li-qing (Mechanical Engineering Institute,Changchun University,Changchun 130022,China);Methods of prolonging project life[J];Journal of Changchun University;2008-06
9 Pan Xinxin et al.;Safety Evaluation and Risk Management of Shanghai Natural Gas Supply System[J];Public Utilities;2008-06
10 Sun Chengshuang, Gu Guochang(Department of Computer Science & Technology, Harbin Engineering University, Harbin 150001, P. R. China);Risk Management Framework of Multi-agent System for Construction Projects[J];Journal of Northeast Forestry University;2006-05
China Proceedings of conference Full-text Database 1 Hits
1 Du Hong-mei Liu Ming-sheng (Academy ofEquipment Command & Technology,Beijing,101416);Study on the Risk Assessment Based on the Cloud Model[A];[C];2009
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 YU Gao-ming (Communications School of Anhui University, Hefei 230051,China);The Application of GERT to Evaluating Concrete Site Supplied Options[J];JOURNAL OF ANHUI UNIVERSITY(NATURAL SCIENCES);2000-02
2 Wang ZhiLu Clunlian;THE DEVELOPMENT OF THE SOFTWARE GERTE——THE ANALYTICAL ALGORITHM OF STOCHASTIC NETWORKS[J];;1988-02
3 WANG Xiao-guang(Postgraduate Department, CSSA, Beijing 100102 );Research on Dynamic Capabilities and R&D Department of Enterprise[J];Journal of Beijing Technology and Business University;2005-01
4 ZHAO Mei,YUE Hong-zhi,YANG Yan(School of Economics and Maoagement,Northwestern University,Xi′an 710127,China);Continuous Risk Management for High-tech Enterprise Technological Innovation[J];Commercial Research;2007-08
5 GONG Jun,WANG Ding wei (School of Information Science & Engineering, Northeastern University, Shenyang 110004,China.;New Product Developing Plan Model of Agile Manufacturer[J];JOURNAL OF NORTHEASTERN UNIVERSITY;2002-07
6 ;Study on Plan Control System of Project Item[J];Northeastern Highway;2003-02
7 LI Ji-ming,ZHANG Ning(Business School and Institute of Systems Engineering,University of Shanghai for Science and Technology,Shanghai 200093,China);Deterministic Network Model with Randomness[J];Complex Systems and Complexity Science;2007-02
8 LI Chun-yang1;ZHOU Guo-hua ;LI Chun-guang(1.School of Economic and Management Southwest Jiaotong University,Chengdu 610031,Chian; 2.Key lab of Geomechanics,Chinese Academy of Science ,Wuhan 430071,China);Synthesis on development of fuzzy network planning technique[J];Construction & Design for Project;2004-02
9 He Ping;THE SOURCE AND POTENTIAL APPLICATIONS OF THE SYSTEM NON-OPTIMUM THEORY[J];Systems Engineering;1989-02
10 Liu Quanbao, I.iu Yongqing;The Decision-making and Analysis Based on Network Program Techniques[J];Systems Engineering;1994-01
【Secondary References】
Chinese Journal Full-text Database 2 Hits
1 Chai Yonghong,Han Shurong(School of Economics & Management,Taiyuan University of Science and Technology,Taiyuan 030024,China);Study on Warning Index of Technology Innovation Risk in Enterprises[J];Technology Economics;2008-12
2 YUE Weimin Accountant;Director of Economic Development Management Office,Shanghai Xinzhuang Industry Park 20110,China.;Study on Venture Capital Portfolio Decision Model Based on Entropy & Grey Relational Analysis[J];Journal of Wuhan University of Technology(Information & Management Engineering);2009-01
【Secondary Citations】
Chinese Journal Full-text Database 9 Hits
1 Wang Xiangzhou Wang Yu Bai Zhida (Department of Automatic control,Beijing Institute of of Technology,Bdijing 100081);Study of the Fault Diagnostic Expert Systemfor Eletrohydraulic Servo Valve[J];JOURNAL OF BEIJING INSTITUTE OF TECHNOLOGY;1997-03
2 Zheng Dezhong; Shang Liping; Yu Siyuan(Yanshan University. Qinhuangdao 066004);The Research of the Air Compressor Malfunction Diagnosis System Based on the Fuzzy Theory[J];JOURNAL OF TRANSCLUCTION TECHNOLOGY;2000-02
3 ;A New Dynamic Displacement Transducer——Spherosyn[J];MEASUREMENT & CONTROL TECHNOLOGY;2000-01
4 CHEN Zhong\|sheng, YANG Yong\|min (College of. Electromechanical Engineering and Automation , National University of Defense Technology, Changsha 410073);Introduction of Machinery Condition Monitoring and Fault Diagnosis[J];MECHANICAL & ELECTRICAL ENGINEERING MAGAZINE;2000-05
5 Mei Shengmin; Xu Hongchang; Zhang Youzhen (Department of Mechanical Engineering, NUAA Nanjing, 210016);Fuzzy Reasoning Method in Expert System for Fault Diagnosis[J];TRANSACTIONS OF NANJING UNIVERSITY OF AERONAUTICS & ASTRONAUTICS;1995-04
6 Huang Jingde Wang Xinggui Wang Zuguang(Shijiazhuang Ordnance Engireering College,050003);Fuzzy Evaluation of Fault Analysis on Leaking Liquid and Gas in Recoil System[J];Lubrication Engineering;2000-06
7 Gu Changyao and Liang ShupingBeijing University of Aeronautics and Astronautics;DEVELOPMENT OF THE VERT-3 SIMULATION TECHNIQUE AND ITS APPLICATION IN MANAGEMENT DECISIONS[J];Systems Engineering and Electronics;1989-10
8 Tang Liwei Wang Wei Zheng Haiqi (First Department, Shi Jiazhuang Mechanical Engineering College Shi Jiazhuang, 050003);Fuzzy Diagnosis of Fault of Diesel Fuel System[J];Journal of Vibration,Measurement & Diagnosis;2000-03
9 Wu Jinpei Xiao Jianhua (Institute of Information Science,Wuyi University Jiangmen of Guangdong, 529020);A New Design Method in Expert System of Diagnosis[J];Journal of Vibration,Measurement & Diagnosis;1996-04
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved