Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Mathematics in Practice and Theory》 2009-07
Add to Favorite Get Latest Update

Analysis of the Critical Path of Fuzzy Network Plan Base on S-type Membership

CUI Han-long~1,MENG Wen-qing~1,LI Wan-qing~1,LI Ji-ping~2 (1.College of Civit Engineering,Hebei University of Engineering,Handan Hebei 056038,China) (2.College of Economics Management,hebei University of Engineering,Handan Hebei 056038,China)  
Based on the study on triangle or trapezoidal fuzzy network plans,this paper analyzed the feasibility of determining the critical path of fuzzy network plan with S-type membership function,and pointed out the problems when using the zero total float time to determine the critical path of fuzzy network plan,and therefore the concept of correlation area was suggested.Depending on the principle that the closest path to the total time limit is the most significantly influential on the project duration,the paper obtained the method of determining the critical path.
【CateGory Index】: TP273.4
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 4 Hits
1 CHANG Yun tao , LI Jia (College of Civil Engineering,Hunan Univ,Changsha 410082,China);Duration and CP Analysis of Fuzzy Network[J];JOURNAL OF HUNAN UNIVERSITY(NATURNAL SCIENCE);1999-06
2 YIN Jie,ZHOU Zhi(Department of Management,Chongqing Jiaotong University,Chongqing,400074,China);The Application of Fuzzy Theory in Network Planing Technique[J];Optimization of Capital Construction;2006-05
3 CHEN Haoguang, CHEN Qinghua ,YANG Huihu (Institute of Command and technology, Beijing 101416);A model of network planning with activity finish-time membership function[J];Computer Engineering and Design;2001-03
4 Hu Jingsong\ Da Qingli(Institute of Systems Engineering, Southeast University, Nanjing 210096);Analysis of Critical Path in Fuzzy Network with Activites on Nodes[J];SYSTEMS ENGINEERING-THEORY & PRACTICE;1998-08
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 LIN Shang-yue1,XUE Xiang2,QIU Dong-rui3(1.Tunnel Subsidiary Company of China Railway 14th Breau Group Co.,Ltd,Ji Nan 250001,China;2.Beijing Geotechnical Institute Co.,Ltd,Beijing 100038,China;3.Faculty of Architectural Engineering,Beijing University of Technology,Beijing 100124,China);Application of Genetic Optimization and Neural Network Method in Tunnel Construction[J];Chinese Journal of Underground Space and Engineering;2009-04
2 YAN Jin 1,ZHANG Feng ju 1,YAN Rui 2 (1.Henan Urban Construction Junior College,Pingdingshan 467001,China; 2.Zhongzhou Art and Culture School ,Huixian 465000,China);Calculating Method of Fuzzy Construction Time of Lapping Network with Single Number[J];JOURNAL OF HENAN URBAN CONSTRUCTION JUNIOR COLLEGE;2000-03
3 CHANG Yun tao , LI Jia (College of Civil Engineering,Hunan Univ,Changsha 410082,China);Duration and CP Analysis of Fuzzy Network[J];JOURNAL OF HUNAN UNIVERSITY(NATURNAL SCIENCE);1999-06
4 SU Yong-hua1,LI Xiang1,LI Zhi-yong2,ZHAO Ming-hua1 (1 College of Civil Engineering,Hunan Univ,Changsha,Hunan 410082,China;2 Traffic Research Academe of Hunan Province,Changsha,Hunan 410015,China);Fuzzy Rough Set Evaluation Method for Construction Environment of Highway Engineering on Mountainous Area[J];Journal of Hunan University(Natural Sciences);2010-05
5 LI Bin,DU Zhi-da,TONG Xing-juan (School of Civil an Hydraulic Engineering,Dalian University of Technology,Dalian 116023,China);Analysis of total duration's membership function and path criticality in a fuzzy network[J];Construction Management Modernization;2009-06
6 Yin Zhijun, Chen Liwen, Wang Shuangzheng, Su Chunsheng (School of Management, Hebei University of Technology, Tianjin 300130,China);Study on The Advance of Project Risk Management in China[J];Optimization of Capital Construction;2002-04
7 Lü Fang-mei et al (Shanghai Jiaotong University);Model of lapping network for coordinate design of automatic machinery[J];Machine Design;2002-01
8 HUANG Zhen-sheng~(1,2),ZHENG Huai-zhou~2,CHEN Hao-guang~2(1.Nanchang Military Academ,Nanchang 330103,China;2.The Academy of Equipment Command and Technology,Beijing 101416,China);The Fuzzy Model for Optimizing the Allocation of Shortening Duration in Network Planning[J];Fuzzy Systems and Mathematics;2006-04
9 LUO Xinggang1 WANG Fubin2 KWONG C K3(1.School of Information,Northeastern University,Shenyang 110819; 2.School of Mechanical Engineering and Automation,Northeastern University,Shenyang 110819; 3.Department of Industrial and System Engineering,The Hong Kong Polytechnic University, Hung Hom,999077 Hong Kong,China);Quality Function Deployment-based Methodology for Optimizing Scalable Product Platform[J];Journal of Mechanical Engineering;2011-12
10 GAO Feng CHEN Yingwu(Institute of System Engineering, NUDT, Changsha 410073);Review of Research on Risk Management for Critical Engineering System[J];World Sci-tech R & D;2005-02
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 ZHANG Haitao1,HE Yabo2(1.Department of Architectural Engineering,Jianghan University,Wuhan 430056,China;2.School of Civil and Architectural Engineering,Wuhan University,Wuhan 430072,China);A new calculating method of fuzzy network[J];Sichuan Building Science;2007-02
2 Yang Chunde;Zhou Zhongfang(Department of Basic Sciences);Analysis of Fuzzy Network FCPM Method[J];JOURNAL OF CHONGQING UNIVERSITY OF POSTS AND TELECOMMUNICATIONS;1994-01
3 Qi Donghai, Wu Yongcun (Department of Civil Engineering, DIT);Design of a General Program for Solving the PERT Networks with Monte Carlo Method[J];;1987-03
4 Liu Xinwang Da Qingli (Institute of Systems Engineering, Southeast University,Nanjing 210018);Fuzzy Critical Path Approximation Method[J];Journal of Southeast University;1997-05
5 Cui Chaodong(Institute of Construction Mechanization, the Chinese Academy of Building Research);DETERMINING OF CRITICAL PATH IN PERT NETWORK PROGRAM WITH FUZZY PROBABILITY[J];Discovery of Nature;1986-01
6 LI Chun-yang1;ZHOU Guo-hua ;LI Chun-guang(1.School of Economic and Management Southwest Jiaotong University,Chengdu 610031,Chian; 2.Key lab of Geomechanics,Chinese Academy of Science ,Wuhan 430071,China);Synthesis on development of fuzzy network planning technique[J];Construction & Design for Project;2004-02
7 Gao Peng,Feng Junwen(School of Economics and Management,Nanjing University of Science and Technology,Nanjing 210094,China);Linear programming method with LR type fuzzy numbers for network scheduling[J];Engineering Sciences;2009-02
8 YANG Xiao-di (CTE Tianjin Design Consulting corp. Tianjin 300222,China);Use PERT to Evaluate Time Limit of a Project[J];China Harbour Engineering;2004-02
9 By Hu Jingsong, Da Qingli (Institute of System Engineering, Southeast University, Nanjing 210096), Jin Yi(College of Information, Zhejiang University of Technology, Hangzhou 310032);Critical Path Analysis in Fuzzy Network(50)[J];JOURNAL OF INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT;1999-01
10 MENG Wen-qing,ZHANG li-ning,LI Wan-qing (College of Civil Engineering, Hebei University of Engineering, Handan 056038,China);Research on engineering project duration risk based on fuzzy network[J];Journal of Hebei Institute of Architectural Science and Technology;2005-02
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 LI Wan-qing,HUANG Hai-bin,MENG Wen-qing (College of Civil Engineering,Hebei University of Engineering,Handan Hebei 056038,China);The Study of Construction Network Based on Unascertained Rational Number[J];Mathematics in Practice and Theory;2006-05
2 HU Zhi gen\+1, XIAO Huan xiong\+1, XIANG Chao qun\+2 (1.College of water conservancy & Hydropower Engineering, Wuhan Univ. of Hydr. & Elec. Eng., Wuhan 430072 China 2.No.7 Bureau of China Hydropower Engineering, Chengdu 611130 China);Approach of fuzzy network planning and its duration possibility for a project construction[J];JOURNAL OF WUHAN UNIVERSITY OF HYDRAULIC AND ELECTRIC ENGINEERING;1999-05
3 Wang Chengyao Gao Lin Wang Dingwei (College of Information Science & Engineering, Northeastern University, Shenyang 110006);SCHEDULING PROBLEMS WITH FUZZY PROCESSING TIMES[J];JOURNAL OF SYSTEMS ENGINEERING;1999-03
4 Hu Jinsong Da Qingli (Institute of Systems Engineering, Southeast University, Nanjing 210096);THE METHOD USING ACTIVITIES SLACK TO DETERMINE CRITICAL PATH IN A FUZZY NETWORK[J];JOURNAL OF SYSTEMS ENGINEERING;1997-01
5 Huang Decai (College of Information Engineering,Zhejiang University of Technology,Hangzhou 310014) Zhao Keqin (Zhejiang Gold Machine Works, Zhejiang Zhuji 311811);USING THE CONNECTION NUMBER OF THE SPA TO EXPRESS AND PROCESS THE UNCERTAINTIES IN NETWORK PLANNING[J];JOURNAL OF SYSTEMS ENGINEERING;1999-02
6 Li Shuquan Kou Jisong Li Minqiang (Tianjing University, 300072) Zhao Liangying (Agricultural University of Hebei, Baoding 071001);An Approach of Methods in Determining Time Limit for a Project[J];SYSTEMS ENGINEERING ---THEORY & PRACTICE;1997-04
7 Hu Jingsong\ Da Qingli(Institute of Systems Engineering, Southeast University, Nanjing 210096);Analysis of Critical Path in Fuzzy Network with Activites on Nodes[J];SYSTEMS ENGINEERING-THEORY & PRACTICE;1998-08
8 Li Ruogang, Wang Guoxiang, Li Yue and Ren Jialin The Second Academy, CASC, Beijing 100854;Study on Uncertainty of Activity Duration in PERT[J];Systems Engineering and Electronics;1997-08
9 Chen Haoguang, Zhao Hongyu and Chen Qinghua Institute of Command and Technology, COSTIND,Beijing 101407;An Approach of Fuzzy Network Planning Technique Applied into Aerospace Experiment[J];Systems Engineering and Electronics;1999-04
10 SUN Lin-zhu,\ HUANG Wei (Wenzhou University,Wenzhou Zhejiang\ 325027,China);Fuzzy approach to construction network plan[J];Journal of Zhejiang Normal University(Natoral Sciences);2001-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved